MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL
The Mass Rapid Transit (MRT) Putrajaya Line Phase Two, which will open on March 16, is expected to reduce traffic congestion, particularly on roads and highways leading to the city centre of Kuala Lumpur. The Phase Two line, which stretches 40.2 kilometres (km) from Kampung Batu to Putrajaya Sentral, includes a number of hot spot locations or stations, including Sungai Besi, Chan Sow Lin, and Ampang Park, which are the focus of the working population. The MRT Putrajaya Line will also have interchange station services with the Kelana Jaya LRT, Kajang MRT, and KL monorail.
The MRT Putrajaya Line spans 57.7 kilometres from Kwasa Damansara to Putrajaya Sentral, with 36 stations including nine underground stations and 49 train sets. During the operational review of the Putrajaya line today, MRT Corp chief executive officer Datuk Mohd Zarif Hashim stated that the grade of automation of all trains on the Putrajaya MRT line was at level four (GoA4), which means that the trains are controlled automatically without human intervention. He stated that the automation system is outfitted with cutting-edge technology and is fully controlled from the operations centre in Sungai Buloh.
"It is similar to using robotics with the sophisticated automated system. We must ensure that the individual operating the system has the necessary skills "He added.
Previously, media professionals were given the opportunity to ride the MRT from Putrajaya Sentral to Hospital Kuala Lumpur (HKL) station, which took about one hour and 15 minutes back and forth with no stops. Bernama discovered that the HKL station near the hospital's Institute of Urology and Nephrology is exceptionally user-friendly, with escalators and stairs that are not too high, as well as a travelator similar to those found in airport terminals. According to Mohd Zarif, such user-friendly initiatives were implemented with the welfare and condition of patients travelling to HKL in mind. Furthermore, he said that the current cashless payment method, which uses the Touch 'n Go card, may be expanded to include credit and debit cards, but this has yet to be implemented.
"However, the payment machines at MRT stations have been equipped with payment transaction systems in the future to cater to those using ATM cards or smart watches," he said, adding that Prasarana Malaysia Berhad would make an announcement on the subject. Meanwhile, he encouraged passengers to use the unlimited travel pass, My50, which costs RM50 per month. The MRT Putrajaya Line Phase Two will be open to the public on March 16 at 3 p.m., following the official launch by Prime Minister Datuk Seri Anwar Ibrahim. Previously, the MRT Putrajaya Line Phase One from Kwasa Damansara to Kampung Batu began service on June 16 of last year. The Putrajaya MRT line, worth RM30.53 billion, is expected to transport 104 000 passengers per day. Source: Bernama
Gallery
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM5539
SELANGOR
BSG7726
JOHOR
JYE4987
PULAU PINANG
PRT1064
PERAK
ANY7209
PAHANG
CFD677
KEDAH
KGB6433
NEGERI SEMBILAN
NEG6396
KOTA KINABALU
SJL9999*
KUCHING
QAB8457L
Last updated 04 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
MRT Putrajaya Line Get 300 Pax Capacity Women’s Coach
MRT Putrajaya Line gets women coach service capable of ferrying up to 400 pax each trip.
09-04-2024
Major Delays On MRT Putrajaya Line Caused By Trespassers - Rapidrail
The MRT Putrajaya Line experienced a service disruption this morning due to a trespassing incident.
14-02-2024
New MRT Feeder Bus From North Sungai Buloh To MRT Putrajaya
Rapid KL announced the new MRT feeder bus connecting areas north of Sg Buloh to the MRT Putrajaya Line station.
06-12-2023
Tun Mahathir Praises MRT Service
Tun M praises infrastructure and facilities in the Mass Rapid Transit (MRT) service.
26-04-2023
"Too early to assess Putrajaya MRT route on peak-hour congestion" - Loke
It is still too early to assess the effectiveness of Putrajaya's MRT service in reducing traffic congestion, says Loke.
07-04-2023
Rapid Rail Suspends LRT Operations At Six Stations, Starting April 2
Rapid KL has announced six stations on the Ampang – Sri Petaling LRT line will be suspended starting April 2.
31-03-2023
MRT Putrajaya Line Free Ride Ends Tomorrow March 31
MRT Putrajaya Line free ride ends tomorrow on March 31.
30-03-2023
KTMB Agrees To Provide CVSKL Patients Free ETS Rides
KTMB collaborates with CVSKL to offer free rides for its patients.
17-03-2023
Latest News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor
KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.
04-08-2025
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
Show More
trending_flat