ART Smart Tram Prototype Will Begin Test Run In Kuching Next Month
According to state Transport Minister Datuk Seri Lee Kim Shin, the engineering run for the world's first prototype hydrogen-powered Autonomous Rapid Transit (ART) smart tram will begin at the Isthmus here on September 4 and will last until October 31, Malay Mail reported.
Lee stated in a statement that the test run will take place along the Jalan Keruing loop, passing Menara LCDA, Menara SEDC, Menara Sarawak Energy, and Borneo Convention Centre Kuching (BCCK).
“The engineering run is to identify any potential issues before the start of the Proof of Concept (POC) exercise in Samarahan,” he said.

Lee said the smart tram, developed by China's CRRC Zhuzhou Institute Co Ltd, had been fully assembled over the past two weeks after arriving at Senari Terminal from Shanghai Port on August 5.
“The hydrogen vehicle will be moved to Kuching Port Authority’s Pending Terminal where it will be stabled (parked) until the end of the engineering run period in October.
“Refuelling of the prototype ART hydrogen vehicle will be done at Pending Terminal because Mobile Hydrogen Refuelling Station will be based there,” he said.
During a special briefing last week, he added, the ministry met with industry players and government agencies with offices on the Isthmus, as well as the relevant enforcement authorities. 
“To prepare for the engineering run, works to close certain sections of the road in the area will begin tomorrow (August 23).
“The road closures will be advertised on Sarawak Metro’s social media platforms and in local newspapers from August 22. This initiative aims to notify residents and employees who work in the vicinity, enabling them to adjust their daily travel routines during the two-month period,” he added.
"From August 22, the road closures will be advertised on Sarawak Metro's social media platforms and in local newspapers." "The goal of this initiative is to notify residents and employees who work nearby so that they can adjust their daily travel routines during the two-month period," he said.
Lee also stated that the smart tram would travel to Kota Samarahan in November for a month-long proof-of-concept test.
This second test would begin on a 3km permanent dedicated lane constructed between two roundabouts on a section of the Kuching-Samarahan Expressway.
“The dedicated lane is near the Sarawak Heart Centre to the roundabout near SAINS. This POC exercise is conducted to gather data to evaluate the feasibility of the prototype for the final design of the ART to accommodate a maximum capacity of passengers,” he said. 
However, Lee stated that the passenger service will be closed to the public during both test runs, and that only selected stakeholders from the relevant public and private sectors will be able to use it.
“The main reason we are not opening this up to the public, in terms of riding on the ART, is due to the fact that this is still a prototype vehicle and the main aim is to test its performance here in Sarawak.”
Gallery
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPY9561
SELANGOR
BSK1634
JOHOR
JYL509
PULAU PINANG
PRV6497
PERAK
APC4880
PAHANG
CFE1524
KEDAH
KGC9760
NEGERI SEMBILAN
NEH5936
KOTA KINABALU
SJN6470
KUCHING
QAB5123M
Last updated 14 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.65
+0.05
RON 97
RM 3.25
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.07
+0.05
EURO 5 B7
RM 3.27
+0.05
Last updated 13 Nov, 2025
Related News
Govt Calls For Bids For Elevated ART In JB
Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.
14-02-2025
Is Sarawak’s Hydrogen-Powered ART Project a Risky Gamble?
Sarawak’s decision to pursue hydrogen-powered Autonomous Rapid Transit (ART) quizzed.
12-09-2024
Latest News
Genting Highlands Set To Introduce Vehicle Fee to Boost Safety
Motorists heading to Genting Highlands will soon pay a fee to fund maintenance and safety on the 24 km private road.
13-11-2025
ACCCIM Calls For Gradual Enforcement Of Lorry Bridge Load Limits
ACCCIM urges a phased rollout of lorry bridge load limit rules to avoid disrupting logistics and the supply chain.
13-11-2025
Malaysia’s First BYD Tech Discovery Day Kicks Off in KL – Nov 14-16, Plaza Arkadia
Malaysia’s first BYD Tech Discovery Day is set to take place later this week on Nov 14-16 at Plaza Arkadia, KL.
13-11-2025
MOF: RM36.3B Collected from Vehicle Taxes Over Three Years
Import and excise duties alone contributed more than RM26 billion, underscoring the auto sector’s economic weight.
13-11-2025
Johor Regent Flags Traffic Concerns Ahead Of RTS Link Launch
Tunku Mahkota Ismail flags potential congestion around Bukit Chagar as the JB–SG RTS Link nears completion.
13-11-2025
Diesel Subsidy Reform Cuts Over 300 Million Litres In Sales
Diesel subsidy rationalisation cuts sales by over 300 million litres a month, helping curb smuggling.
13-11-2025
Updated Fuel Prices From 13 To 19 November
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 13 to 19 November, 2025, the rates are as such.
12-11-2025
RM1.7b NPE2 Extension To Ease KL Congestion By 2029 - Nanta
The NPE2 will connect Pantai Dalam to Jalan Istana, cutting travel time by up to 25 minutes and improving traffic flow across KL.
12-11-2025
Show More
trending_flat