FREE Rapid KL Bus Service To Batu Caves - Thaipusam

Following Transport Minister YB Anthony Loke's announcement of free rides on KTM Komuter trains on January 24 and 25, Rapid KL has announced that there will be complimentary Rapid KL & MRT feeder bus service to Batu Caves on those days.
According to Rapid KL, three (3) complementary routes would be provided to users, particularly Hindu devotees. Routes BC02 (Bandar Pasar Seni Hub - Batu Caves), BC03 (Gombak LRT Station - Batu Caves), and BC04 (Kg. Batu MRT Station - Batu Caves). These routes would operate non-stop from 5 AM on January 24th to 12 AM on January 26th, with one bus every 10-15 minutes.

Other connecting bus routes would also be made available during extended operating hours on the 24th and 25th of January, beginning at 5.30 AM and ending at 12 midnight. These bus services, however, are not free, and passengers will be charged according to their boarding and alighting locations.
The following routes have extended operating hours: 173 (Lebuh Ampang - Kg. Batu - Batu Caves - Taman Desa), MPS1 (Gombak LRT Station - Batu Caves - Selayang Mutiara), and T201 (Gombak LRT Station - Batu Caves - Wira Damai).
Although Rapid KL has announced the bus frequency, we would advise passengers to be more patient on these two days because the roads leading into and out of Batu Caves are likely to be congested, causing the buses to be delayed.
Tagged:
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQD7825
SELANGOR
BSK8756
JOHOR
JYM8964
PULAU PINANG
PRW6011
PERAK
APD4031
PAHANG
CFE4685
KEDAH
KGD4501
NEGERI SEMBILAN
NEH9159
KOTA KINABALU
SJP3024
KUCHING
QAB7469M
Last updated 17 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
LOKE: FREE Train Rides On 24 & 25 Jan For Thaipusam!
Government announces free KTM Komuter rides on 24 and 25 Jan in conjunction with upcoming Thaipusam holiday.
15-01-2024
Six Roads & Intersections Closed Off For Thaipusam At Batu Caves 2-8 Feb 2023
Batu Caves Thaipusam Festival road closures would happen from 2 to 8 Feb 2023.
01-02-2023
KTM Komuter Will Operate 24-Hours From 4-6 Feb For Thaipusam
For Thaipusam, KTM Komuter would be operating around the clock for 3 days and 2 nights from 4 to 6 Feb 2023 to Batu Caves.
27-01-2023
Latest News
No More Heavy Vehicles On Kuala Terengganu Drawbridge From Jan 1
Heavy vehicles will no longer be allowed to use the Kuala Terengganu drawbridge from Jan 1.
16-12-2025
OMODA & JAECOO Wrap Up 2025 With Season of Rewards
OMODA & JAECOO 2025 Season of Rewards offers extended service packages and practical ownership benefits.
16-12-2025
Overloaded Trucks Crackdown Showing Results, Transport Rates Remain Stable
Strict enforcement against overloaded trucks is paying off, improving road safety and transport efficiency without hiking rates.
16-12-2025
Gemas-JB ETS Needs Better Access To Curb City Traffic - Expert
Experts urge improved first-mile access, feeder buses, and park-and-ride options for the Gemas- JB ETS.
16-12-2025
SCS Adopts Advanced European Testing Systems
SCS raises the bar for vehicle inspections with advanced European testing technology.
16-12-2025
Shah Alam LRT Launch Delayed To Avoid Another 2021 Kelana Jaya Crash
Prasarana delays the Shah Alam LRT opening, prioritising passenger safety and thorough testing after past LRT mishaps.
15-12-2025
Federal Highway Won’t Be Upgraded, Costs Deemed Too High
Despite worsening traffic conditions, the Federal Highway will not be upgraded, with the government citing high costs.
15-12-2025
Bollards Are There for Your Safety, Not Decoration - DBKL
DBKL is reminding the public that bollards play a crucial role in keeping pedestrians safe.
15-12-2025
Show More
trending_flat
