ChargeSini 60 kW DC & 22 kW AC Chargers Now Available At Menara Takaful, KL
-full.webp)
ChargeSini sees its network of charging locations grow this week as it announces new AC and DC chargers located in Menara Takaful, Kuala Lumpur.
With this addition, ChargeSini now boasts 638 charging points nationwide (data from AGMO), 118 of which are fast charging DC. ChargeSini continues to hold third place among CPOs deploying EV chargers across the country.
-full.webp)
Back to their latest chargers at Menara Takaful, ChargeSini has placed a Sangitech 60 kW DC Fast Charger (DCFC) primed with two (2) CCS2 charging guns that serve two electric vehicle charging bays (EVCB). This DCFC is located at said building’s ground floor near its main entrance.
-full.webp)
Next to which, ChargeSini has also placed two (2) 22 kW AC Chargers. These are housed in the building's outdoor parking area and, according to the ChargeSini app, the charging rate on both chargers are based on per-kWh drawn, with the AC units set at RM1.09/kWh whilst the DC charger levies RM1.19/kWh.
-full.webp)
As usual, these EV charging bays are outfitted with ChargeSini's automated parking barrier system. Lowering these barriers, which are intended to deter 'ICEing', must be done through the ChargeSini app.
-full.webp)
Users are also subjected to an RM5 minimum charging fee and a 15-minute grace period to relocate their vehicles once the charging is complete. Failing the latter would see users charged an RM1 idle fee for each subsequent 5-minute block.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQA2295
SELANGOR
BSK1947
JOHOR
JYL1663
PULAU PINANG
PRV7058
PERAK
APC5290
PAHANG
CFE1648
KEDAH
KGD146
NEGERI SEMBILAN
NEH6065
KOTA KINABALU
SJN6723
KUCHING
QAB5209M
Last updated 15 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.65
+0.05
RON 97
RM 3.25
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.07
+0.05
EURO 5 B7
RM 3.27
+0.05
Last updated 13 Nov, 2025
Related News
No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes
ChargeSini now gives EV users up to 30 minutes after charging ends before idle fees apply, offering more flexibility in busy areas.
04-11-2025
Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout
Meta Bright teams up with ChargeSini to scale EV charging infrastructure nationwide.
12-07-2025
Meta Bright Aligns with ChargeHere in Green Energy Push
Meta Bright and ChargeHere teams up, jointly seeking to accelerate EV charging infrastructure in Malaysia.
23-05-2025
PRO-NET Partners ChargeSini,Other CPOs, For EV Charging At Condos
PRO-NET partners ChargeSini and other leading CPOs to bring affordable, convenient EV charging to over 1,000 high-rises across Malaysia.
07-05-2025
Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC
Penang state government targets to establish 600 EV charging bays by this year, includes new ChargeSini DCFC too.
13-03-2025
ChargeSini Partners UNITEN & Kevin Lab - Public EV Charger Usage Data Sharing
ChargeSini Inks MoU with UNITEN and Kevin Lab for joint data sharing and research to improve energy efficiency.
20-11-2024
ChargeSini To Set Up EV Chargers At KEB Properties New Developments
ChargeSini inks MOU with KEB Properties to develop new charging facilities in selected new developments.
31-10-2024
ChargeSini NU Empire Mall Subang DCFC Coming Soon - 2 x 60kW @ RM1.39/kWh
ChargeSini launches latest 60kW DCFC station at NU Empire Mall, Subang Jaya, offering a charging rate of RM1.39 per kWh.
27-09-2024
Latest News
Tan Chong Will Support Perodua’s First National EV Production
Tan Chong will provide assembly capacity and key processes as Perodua readies its first fully Malaysian-made EV this month.
15-11-2025
Zafrul: AI and EVs Drive Malaysia’s Next Industrial Leap
With AI, localisation and new industrial strategies, Malaysia is reshaping its role in the regional mobility landscape.
14-11-2025
Swift Bridge, ChargeSini Inks MOUs To Localise EV Charger Production
Swift Bridge signs MOUs with ChargeSini, EV Plus, Ideal Property Group & SDEC Karuna to localise EV charger production.
13-11-2025
Govt Approves National e-Mobility Service Platform, Blockchain-Based EV Charging Network
Malaysia greenlights a blockchain-enabled National e-Mobility Platform, developed by MARii, ACO Tech, and Geno.
12-11-2025
Proton e.MAS 7 Sales Charges Past 7,400 Units, Over 10,000 e.MAS 5 Bookings Placed
Proton (PRO-NET) continues to lead EV segment as e.MAS 7 sales charges past 7,400 units whilst e.MAS 5 sees over 10,000 bookings placed.
11-11-2025
PMX: Perodua EV Launch Confirmed This Month, Set to Be “National Agenda”
PMX confirms Perodua’s first EV will launch by month-end, and will be elevated to a “national agenda”.
11-11-2025
BYD Atto 3 Set For Another Update With Increased 650 KM Range
Updated 2026MY BYD Atto 3 leaks via China’s MIIT filing, promises extended 650 KM range thanks to bigger battery.
11-11-2025
Xpeng X9 Ultra Specs Revealed – Turing AI Chips, Minor Design Updates
A filing with China’s MIIT reveals a new Xpeng X9 Ultra variant, featuring some minor design updates and new hardware.
11-11-2025
Show More
trending_flat