ENZHMS
Link Copiedcheck_circle
Auto News

Six More Highways to Implement Open Payment System – PLUS, SPE, etc.

Mukhlis Azman

Share via

Open-Payment-Toll.jpgPublic-Work-Minister-Datuk-Seri-Alexander-Nanta-Linggi-(1).jpg

Starting this September, six more highways are set to implement the open payment system for their tolls.

Another six highways in Malaysia are set to implement the Open Payment Toll Collection System (SPT), Bernama reports. According to Public Works Minister Datuk Seri Alexander Nanta Linggi, the SPT implementation on these six highways is set to commence later in September this year, bringing a total of 18 highways to run the SPT for their toll collection.

NSE-PLUS-Highway.jpg

The North-South Expressway (PLUS) are amongst the six new highways in Malaysia to adopt the SPT.

The six new highways are the North-South Expressway (PLUS), Seremban-Port Dickson Highway (SPDH), Linkedua Highway connecting Singapore and Malaysia, Grand Saga Highway, Grand Sepadu Highway, and Setiawangsa-Pantai Expressway (SPE).

Alexander further added that the OPS implementation will help to provide users with more payment alternatives on top of the existing methods such as Touch ‘n Go (TNG), SmartTag, and radio frequency identification (RFID).

NSE-PLUS-Highway.jpegPublic-Work-Minister-Datuk-Seri-Alexander-Nanta-Linggi-(3).jpg

“The participation of these six highways means that a total of 35 lanes will be opened for the convenience of using the open payment system,” the minister said during his visit to the construction site of Section 7 of the West Coast Expressway (WCE).

Penang-Bridge-Toll.jpg

Prior to this announcement, the SPT system was implemented on twelve highways, including the Duta-Ulu Kelang Expressway (DUKE), Damansara-Puchong Expressway (LDP), Western Kuala Lumpur Traffic Dispersion Scheme Expressway (Sprint), Shah Alam Expressway (Kesas), SMART tunnel, Maju Expressway (MEX), Sungai Besi Expressway (Besraya), New Pantai Expressway (NPE), Ampang-Kuala Lumpur Elevated Highway (Akleh), Guthrie Corridor Highway (GCE), Butterworth-Kulim Expressway (BKE), and Penang Bridge.

Source: Bernama


Gallery

Share This Article

Written By

Mukhlis Azman

An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman

Share via

JPJ Running Numbers

KUALA LUMPUR

VQK4064

SELANGOR

BSM1639

JOHOR

JYQ6303

PULAU PINANG

PRY2631

PERAK

APE7176

PAHANG

CFF295

KEDAH

KGE1443

NEGERI SEMBILAN

NEJ4096

KOTA KINABALU

SJQ281

KUCHING

QAB1507N

Last updated 30 Jan, 2026

Fuel Price

Petrol

RON 95

RM 2.54

+0.02

RON 97

RM 3.10

+0.02

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.88

+0.04

EURO 5 B7

RM 3.08

+0.04

Last updated 22 Jan, 2026

Related News

Auto News

08-11-2023

Latest News

Auto News

JPJ Rolls Out Flexible Road Tax Renewal For E-Hailing Vehicles

E-hailing drivers can now renew their road tax from one to 12 months, making compliance easier and more cost-effective.

30-01-2026
Auto News

Scrap Your Old Car, Get Up To RM4,000 For A New Proton

Scrap your old car and get up to RM4,000 towards a new Proton with trade-in incentives and a government grant.

Auto News

Traffic Diversions at 12 KL Intersections for 2026 Thaipusam

Traffic diversions at 12 KL intersections will be carried out in stages 2026 Thaipusam.

Auto News

Is GWM Seeking To Build Its Own Plant in Malaysia?

MITI raises prospects of a standalone GWM factory as newly launched Wey G9 begins production with 40% local content.

Auto News

BAS.MY Kota Bharu Sees Ridership Soar

Kelantan's BAS.MY Stage Bus Service records almost 84,000 passengers per month in the fourth quarter of 2025.

29-01-2026
Auto News

Honda Malaysia Shifted 72,301 Units in 2025, No. 1 Non-National Car Brand for 12 Years

Honda Malaysia sold 72,301 units in 2025, retaining its position as the number 1 non-national passenger car brand for the 12th consecutive year.

29-01-2026
Auto News

ETS To Run 24 Hours During Festive Peaks As Demand Surges

KTMB will operate 24/7 during festive periods to meet high passenger demand.

29-01-2026
Auto News

ECRL Launch Hinges On System Integration, Jan 2027 Target Maintained

The ECRL remains on schedule, with system integration and testing now the key focus ahead of its planned Jan 2027 launch.

29-01-2026

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2026 CariCarz.com. All Rights Reserved.