KTM ETS Express Service from KL to Ipoh to Commence in Aug 2024
-full_normal.webp)
KTM’s ETS express service from Kuala Lumpur to Ipoh is poised to start from August 2024 onwards.
Keretapi Tanah Melayu Berhad (KTMB) has announced a new express service for its Electric Train Service (ETS) line. From Aug 1, 2024 onwards, travellers from Kuala Lumpur to Ipoh or vice versa can take the non-stop express service, which shortens the travel time to less than two hours.
-full_normal.webp)
-full_normal.webp)
Compared to the current KL-Ipoh normal ETS services, which take about two hours and 40 minutes, this new KL-Ipoh express service skips a few stations such as Sungai Buloh, Tanjung Malim, Kampar, and more. This express service embarks on either KL Sentral station or the old Kuala Lumpur train station before continuing its journey non-stop to Ipoh, Perak.
Take note that this new express service won’t outright replace the current service from KL to Ipoh, which is part of the main ETS line going all the way to Padang Besar, Perlis.
“This is an improvement from us for passengers from KL to Ipoh, in line with upgrading the system and infrastructure in the Klang Valley Double Tracking (KVDT) Phase 1 project, which is being completed in stages,” said KTMB COO Mohd Zain Mat Taha.
-full_normal.webp)
Besides the new KL-Ipoh express service, KTMB has also introduced several other new ETS express services from KL Sentral to Butterworth, Penang, and Padang Besar, Perlis. These new express services allow travellers from KL to go to Penang in just three hours and 30 minutes, while the express service from KL to Padang Besar will take four hours and 50 minutes instead.
For more information regarding the schedule and ticketing for these new KTM ETS express services, you can visit KTMB’s official ticketing portal.
Gallery
Written By
Mukhlis Azman
An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman
JPJ Running Numbers
KUALA LUMPUR
VQD6048
SELANGOR
BSK8429
JOHOR
JYM7703
PULAU PINANG
PRW5607
PERAK
APD3708
PAHANG
CFE4579
KEDAH
KGD4329
NEGERI SEMBILAN
NEH8948
KOTA KINABALU
SJP2843
KUCHING
QAB7423M
Last updated 15 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
New KTM Komuter Timetable Starts Jan 1 Amid Track Works
KTMB will roll out a revised KTM Komuter schedule from Jan 1 due to ongoing KVDT2 works.
15-12-2025
Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours
The new electrified Gemas-Johor Bahru train line slashes travel time from KL to Johor to just 4 hours 20 minutes.
12-12-2025
KTMB’s ETS3 To JB Sentral Launches Dec 12 with 30% Discount
KTMB will start operating its ETS3 to JB Sentral on 12 Dec 202 with a 30% discount for travel on this route.
09-12-2025
KTMB Halts Klang-KL Sentral Route This Sunday for Track Upgrades
KTMB will temporarily suspend the Klang-KL Sentral service this Sunday (Dec 7) to allow for track and upgrade works.
04-12-2025
KTMB Set To Launch Komuter Selatan in Feb with Fares Under RM3
Starting Feb, the 25 km Komuter Selatan line will slash Johor peak-hour travel to 30 minutes with fares under RM3.
02-12-2025
KTMB Diverts Passengers From Arau Station As Floods Worsen In Perlis
Flooded roads have forced KTMB to temporarily shift ETS boarding and alighting from Arau to Kodiang Station.
25-11-2025
ETS JB to KL Service Starts Dec 12, Royal Launch Set For Dec 11
ETS JB-KL service finally set to begin operations on Dec 12, official launch graced by the Sultan Ibrahim set for Dec 11.
24-11-2025
Over 1,300 hours Of Train Delays This Year Due To Cable Theft - Loke
Cable theft has caused major disruptions to KTM Komuter and ETS services this year, resulting in over 1,300 hours of delays.
21-11-2025
Latest News
Shah Alam LRT Launch Delayed To Avoid Another 2021 Kelana Jaya Crash
Prasarana delays the Shah Alam LRT opening, prioritising passenger safety and thorough testing after past LRT mishaps.
15-12-2025
Federal Highway Won’t Be Upgraded, Costs Deemed Too High
Despite worsening traffic conditions, the Federal Highway will not be upgraded, with the government citing high costs.
15-12-2025
Bollards Are There for Your Safety, Not Decoration - DBKL
DBKL is reminding the public that bollards play a crucial role in keeping pedestrians safe.
15-12-2025
Experts Call For Stricter Rules, Defensive Driving As Road Deaths Rise
Negligent driving caused over 1,200 fatalities this year, prompting calls for tougher enforcement and smarter driver education.
15-12-2025
New KTM Komuter Timetable Starts Jan 1 Amid Track Works
KTMB will roll out a revised KTM Komuter schedule from Jan 1 due to ongoing KVDT2 works.
15-12-2025
Govt Rules Out Tiered RON95 Pricing After 300 litres
Government rules out tiered RON95 prices under BUDI95, keeps RM1.99 for first 300 litres
12-12-2025
Hyundai Partners EON, Expands Local Network
Hyundai and EON have signed a LOI to open two new dealerships in Klang Valley and Penang.
12-12-2025
Perodua Traz/Nexis D66B Set to Debut on December 17
The long-awaited Perodua Traz/Nexis D66B SUV is set to make its official debut later on December 17, 2025.
12-12-2025
Show More
trending_flat