ENZHMS
Link Copiedcheck_circle
Auto News

Partial Road Closure For 20 Months During Penang Hill Cable Car Project Construction

Anis

Share via

WhatsApp-Image-2024-10-09-at-3.10.25-PM-870x522.jpeg
Photo: Buletin Mutiara. Due to Penang Hill Cable Car project construction, Jalan Kebun Bunga will have a Partial road closure from October 15, 2024, to June 30, 2026. During this time, it is recommended that the public follow the Traffic Management Plan (TMP) and use caution.
The partial closure will begin at the intersection of Jalan Kebun Bunga and Lorong Air Terjun, before the Park Avenue apartments.

During the period, heavy vehicles will be using Jalan Kebun Bunga and the Jeep Track during non-peak hours on weekdays from 10am to noon and 2.30pm to 4pm.
Kebun Bunga assemblyman Lee Boon Heng encouraged visitors to the Penang Botanic Gardens to park in designated areas rather than along Jalan Kebun Bunga.

Environment_People_Penang_Hill_Bukit_Bendera_Cable_Car_Project.jpg

A temporary roundabout will be built, and traffic controllers will be stationed to help manage traffic flow along Jalan Kebun Bunga. In addition, a temporary hawker center has been established to accommodate hawkers from the Penang Botanic Gardens hawker complex.
The 2.7km cable car line, valued at RM245 million, is being built in collaboration between Penang Hill Corporation and Hartasuma Sdn Bhd under a public-private partnership with Doppelmayr Seilbahnen GmbHfor, an Austria-based ropeway manufacturer that will provide the cable car system.

Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VPM6307

SELANGOR

BSG8025

JOHOR

JYE5436

PULAU PINANG

PRT1287

PERAK

ANY7544

PAHANG

CFD964

KEDAH

KGB6538

NEGERI SEMBILAN

NEG6459

KOTA KINABALU

SJL9999*

KUCHING

QAB8573L

Last updated 05 Aug, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.17

-0.04

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.91

EURO 5 B7

RM 3.11

Last updated 31 Jul, 2025

Related News

Auto News

Road Detours & Diversions In KL July 4-7 & 8-11 For ASEAN Meeting

PDRM issues list of road detours and diversions for selected KL roads for ASEAN meeting set for July 4-7 and July 8-11.

05-07-2025
Auto News

Delayed - Overnight Closure At Sg Besi Toll For Gantry Works Canceled

KL–Seremban Highway near Sg Besi toll to close overnight (July 2–3) for gantry works delayed.

01-07-2025
Auto News

PLUS: Lane Closure & Contraflow on Penang’s Tun Dr Lim Chong Eu Expressway

Full lane closure plus contraflow in effect on stretch of Tun Dr Lim Chong Eu expressway from Penang Bridge towards Georgetown until June 20.

19-06-2025
Auto News

DBKL Announces Partial Closure Of Jalan Raja From June 9-15

DBKL has announced that Jalan Raja will undergo a week-long closure from June 9 to June 15.

09-06-2025
Auto News

PLUS Announces Several Road Closures For ASEAN Summit

PLUS announces several road closures on May 23-26 and May 28 for the ASEAN Summit 2025.

22-05-2025
Auto News

KLIA Transit Increased Train Frequency For President Xi Official Visit

Train frequency will increase on the KLIA Transit in preparation for President Xi's official visit.

15-04-2025
Auto News

Lekas Highway Will Close From Saturday To Sunday Morning

Lekas highway will be closed this Saturday from 5 p.m. to 4 a.m. on Sunday for the RHB Lekas Highway Ride 2024 cycling race.

08-10-2024
Auto News

Multiple Temporary Road Closures In KL For 2024 Standard Chartered Marathon

Over 30 roads in KL will be closed or diverted for the 2024 Kuala Lumpur Standard Chartered Marathon.

01-10-2024

Latest News

Auto News

JPJeID Registration Now Available at Driving Institutes

JPJeID registration is now available at all driving institutes, streamlining access to MySIKAP and MyJPJ services.

Auto News

Couple Killed In Ford Mustang Crash Near Segamat

A married couple died after their Ford Mustang crashed into an electric pole along Jalan Segamat-Kuantan.

05-08-2025
Auto News

Proton e.MAS 5 ‘MISI 5’ National Tour – Aug to Oct, Launching Soon?

The upcoming Proton e.MAS 5 is going on a ‘MISI 5’ national tour from August to October, 2025. Launch imminent?

05-08-2025
Auto News

MoF: Fuel Subsidy Rollout Under Testing, Launches End-Sept

MoF is finalising the targeted fuel subsidy system, with full rollout details expected by end-Sept.

Auto News

Ferraris, Lambos Among 1,000 Untaxed Vehicles - JPJ

JPJ flags over 1,000 luxury cars, including Ferraris and Lambos, for missing road tax and insurance.

05-08-2025
Auto News

KLIA Apologises After Aerotrain Breaks Down Again

KLIA’s Aerotrain stalled for 15 minutes due to a door glitch, prompting an apology and public frustration.

05-08-2025
Auto News

Amir Hamzah: PADU at the Core of RON95 Subsidy Implementation

With over 30 million individual profiles, PADU will guide MOF’s effort to roll out a more precise RON95 petrol subsidy.

Auto News

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.