Govt Open To Reviving KL-SG HSR With Private Sector Involvement - PM Anwar
The government has decided that the Kuala Lumpur-Singapore High-Speed Rail (HSR) project can be resurrected with little government engagement and full private sector participation, according to Prime Minister Datuk Seri Anwar Ibrahim.
Anwar, who is also the finance minister, stated that the government's present position is to welcome private sector engagement due to budget constraints and the need to await potential proposals.
“We have to put the issues of poverty alleviation, flood mitigation, basic infrastructure, education and public health as our priority, at least for the next one or two years, so the mega projects have to be deferred because of the commitment to settling some outstanding issues.
“We are still waiting for some promising and positive contribution or participation by the private sector to proceed when necessary... there have been proposals and the task force is looking at it,” he said during a joint press conference with Singapore’s Prime Minister Lawrence Wong in conjunction with Wong’s two-day official visit to Malaysia which started yesterday. Even though there have been preliminary plans for the HSR, Anwar added that no decision would be taken until all factors have been carefully considered. The project won't proceed unless the private sector is fully involved and requires little government funding. Singapore's prime minister, Lawrence Wong, stated that the city-state is prepared to talk about the issue while awaiting another proposal from Malaysia in the event that the train project is to be revived. “As far as the HSR is concerned, it’s unfortunate that we could not proceed with it originally. However, we are open to reviewing new proposals from Malaysia. From our perspective, greater connectivity between our two countries is always a plus,” Wong said. Since the first agreement on the Kuala Lumpur-Singapore HSR project was reached in 2013, negotiations have been going on for 12 years, with postponements and cancellations in 2021. Signed in December 2016, the first bilateral agreement was expected to be completed in 2025 and go into effect in 2026.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPN1040
SELANGOR
BSG9057
JOHOR
JYE7283
PULAU PINANG
PRT2141
PERAK
ANY9472
PAHANG
CFD1466
KEDAH
KGB7052
NEGERI SEMBILAN
NEG6782
KOTA KINABALU
SJM192
KUCHING
QAB8847L
Last updated 10 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.94
+0.03
EURO 5 B7
RM 3.14
+0.03
Last updated 07 Aug, 2025
Related News
Govt Finalising Key Parameters For KL-SG HSR Project - MOT
MOT announced that the government is in the process of finalizing key parameters for the KL-SG HSR project.
18-02-2025
KL-SG HSR Project: MRCB Withdraws from MyHSR Corp
Berjaya led MyHSR consortium now better aligned with project target following MRCB’s exit.
19-12-2024
KL-SG HSR Project Will Cost 30% Less Than Projected RM110 Billion
The KL-SG HSR project will cost roughly RM70 billion, roughly 30% lesser than the initial projected RM110 Billion.
19-04-2024
HSR Project Receives 7 Concept Proposal, Govt Needs Two Months To Review
The Transport Ministry announced on parliament’s website that the HSR Project has received 7 Concept Proposals.
05-03-2024
Why Japanese Companies Not Interested On Malaysia's Bullet Train Project
Japanese companies are not keen on Malaysia’s HSR project due to worries about the Malaysian government's lack of funding.
26-01-2024
KL-Bangkok Line Possible - MyHSR Corp Head
According to MyHSR Corporation chairman Datuk Seri Fauzi, there is a chance that the bullet train will be extended to Malaysia's northern region.
08-01-2024
KL-Singapore High Speed Rail Project Is Back On
yHSR Corp, has called for concept proposals for the long-shelved HSR project.
13-07-2023
Johor Ready To Collaborate On Potential KL-Singapore HSR Project Revival - State Exco
The state government of Johor has declared its willingness to work with the federal government to resurrect the Kuala Lumpur-Singapore High-Speed Rail (HSR) project.
14-12-2022
Latest News
Report: Hap Seng Drops smart Automobiles Brand
Renowned legacy local dealership firm Hap Seng star quietly drops smart Automobiles brand from its portfolio.
08-08-2025
230km Southern WCE Feasibility Study To Conclude By Dec
Study underway on 230km WCE from Banting to Gelang Patah to ease North-South Expressway jams.
08-08-2025
Bateriku Launches SIRIM-Certified Astra Batteries
Astra batteries from Bateriku are now SIRIM-certified, free insurance and warranty assist on offer too.
08-08-2025
Agong Gets To Grips With Aurus Senat In Russia
Agong Sultan Ibrahim gets behind the wheel of the Aurus Senat - Russia’s homegrown presidential limo.
08-08-2025
JPJ Will Seize Vehicles From Firms Hiring Foreign Commercial Drivers
JPJ will get tougher on companies hiring foreigners to drive commercial vehicles, with the possibility of vehicle seizure.
08-08-2025
Loke: Accessibility, Safety Upgrades Coming To LRT Stations
Prasarana studying plans to install barriers at older LRT stations for enhanced passenger safety.
08-08-2025
Grab Halts Mandarin Driver Option After Backlash
Grab has paused its Mandarin-speaking driver option after backlash, saying it was only a test to help Chinese tourists.
08-08-2025
RM20 Million Allocated to Upgrade Federal Highway Motorcycle Lanes – KKR
A total of RM20 million will be allocated to upgrade the motorcycle lanes on the Federal Highway, the Works Ministry says.
08-08-2025
Show More
trending_flat