Report: Penang State Govt Considering Third Bridge Option

it appears that the Penang state govt is open to considering a third bridge option instead of an undersea tunnel previously proposed to serve as the island's third link. (Image: myPenang.gov.my)
In a recent report by local daily The Star published earlier this week, it appears that the Penang state government is taking a third bridge option into consideration. This will stand as an alternative towards a proposed undersea tunnel connecting the island state with the mainland.
The same report indicated that Penang infrastructure and transport committee chairman Zairil Khir Johari had expressed the state government’s consideration towards the proposal to have a bridge across the Penang Straits instead.
"The feasibility study was completed in 2023, covering the viability of the new design, namely a bridge, or other alternative designs,” remarked the committee head.
"The implementation study for this alternative design will be completed in the near future and the new design is expected to be finalised once the study is concluded," added Zairil further as part of his closing address during a state assembly sitting held on Wednesday, May 21.
Moreover, Zairil had also stressed that a Traffic Impact Assessment and any necessary evaluation would be carried out once the aforementioned study concludes.

Earlier this year, Chief Minister Chow Kon Yeow confirmed a "change in alignment" for Penang's third link, but didn't outright confirm if this was either a bridge or undersea tunnel project. (Image: penangbridge.com.my)
Talks of Penang’s third link has been on-going for sometime now. Earlier this year in Feb, the island state’s Chief Minister Chow Kon Yeow had confirmed “a change in alignment” for the island’s third link for vehicular movement between the island and Seberang Prai.
At the time, Chow did not reveal details nor did he specify if this third link would be an undersea tunnel or a bridge.
Going as far back as 2021, it was reported then that the Penang state government had not ruled out the possibility of a third bridge as a replacement for the proposed undersea tunnel project – part of a mega project that’s set to cost upwards of RM6.3 billion.
Presently, Penang is connected to the mainland via two active bridges.
Written By
Thoriq Azmi
Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/
JPJ Running Numbers
KUALA LUMPUR
VPK4861
SELANGOR
BSG3549
JOHOR
JYD3869
PULAU PINANG
PRS4490
PERAK
ANX8042
PAHANG
CFC6381
KEDAH
KGB4104
NEGERI SEMBILAN
NEG4758
KOTA KINABALU
SJL7356
KUCHING
QAB6917L
Last updated 18 Jul, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.21
+0.03
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
+0.03
EURO 5 B7
RM 3.11
+0.03
Last updated 17 Jul, 2025
Latest News
JPJ Plans Major Reform For Kejara System
JPJ is wrapping up its review of long-awaited improvements for the Kejara system.
18-07-2025
4-Vehicle Pile-Up On Besraya Partly Caused By Deployed Airbag
Deployed airbag partly to blame for viral four-vehicle pile-up on Besraya earlier this week.
17-07-2025
No SST-Linked Price Hike for Honda Models in 2025
Honda Malaysia commits to shielding customers from SST-related cost increases.
17-07-2025
Next-Gen Perodua Bezza Rendered Again, Could Launch Soon Too
Render artist extraordinaire Theottle (Chin Swee Hoe) gives us updated vision of upcoming new Perodua Bezza.
17-07-2025
Hydrogen Refuelling Facility In Batu Kawa Undergoing Testing
Sarawak begins testing its first green hydrogen station in Batu Kawa, advancing its clean energy push.
17-07-2025
Gamuda Gets Nod To Begin Work On Penang LRT
The Mutiara Line LRT has officially entered its construction phase after Gamuda Bhd received the Notice to Proceed (NTP).
17-07-2025
Selangor Smart Parking RM200 Million Revamp
A new smart parking system under MBI takes effect Aug 1 to modernise management and boost efficiency.
17-07-2025
Gangster Repo Agent Will Face Stern Action – KPDN
KPDN reminds all 3,869 MyEPS-registered vehicle repo agents to strictly follow the Hire-Purchase Act
17-07-2025
Show More
trending_flat