RTS Link: Key Road Closure in JB Until End of 2026
A full road closure will begin today, June 3, and remain in effect until Dec 31, 2026, in Johor Bahru as part of ongoing works for the Rapid Transit System (RTS) Link project.
The affected stretch runs along Jalan Johor Bahru - Endau, from Section 0.10 to Section 0.20 and will be fully closed for a total duration of eighteen months and twenty-eight days.
This extended closure is necessary to facilitate critical construction activities, including bore piling, pile cap installation, pier column construction, and other related works. These are part of the larger RTS Link initiative aimed at improving cross-border connectivity between Johor Bahru and Singapore.
To manage traffic during this period, a diversion plan has been implemented.
Motorists traveling from Jalan Tun Abdul Razak toward Danga Bay will be redirected to Jalan Station, then onto Jalan Wong Ah Fook, before continuing to Jalan Tebrau. This route is marked in green on the official map.
Alternatively, drivers coming from Jalan Tun Abdul Razak 1 can use the road in front of Masjid Habib Hassan Al-Attas, proceed toward Danga City Mall, make a U-turn, rejoin Jalan Tun Abdul Razak and turn left onto Jalan Lingkaran Dalam. This route is marked in purple.
All drivers are urged to follow traffic signs and instructions from on-site traffic controllers. Safety measures will be in place throughout the closure to ensure smooth traffic flow.
The concessionaire also advises motorists to plan ahead, expect delays, and consider alternative routes. For updates and further information, road users are encouraged to follow RTS Link’s official channels.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPS2415
SELANGOR
BSH7411
JOHOR
JYG6315
PULAU PINANG
PRT9853
PERAK
APB2049
PAHANG
CFD4677
KEDAH
KGC2695
NEGERI SEMBILAN
NEH1085
KOTA KINABALU
SJM5851
KUCHING
QAB1588M
Last updated 15 Sep, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.18
+0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.90
+0.02
EURO 5 B7
RM 3.10
+0.02
Last updated 11 Sep, 2025
Latest News
GWM Wey 80 Teased Again, Now Renamed ‘Wey G9’ Instead
Upcoming GWM Wey 80 teased on social media, now bearing new ‘Wey G9’ nameplate too.
15-09-2025
Proton Iriz Production Ends – No Successor Planned, But Should There Be One?
Proton Iriz hatch production ends without a successor, leaving automaker without a new hatch model since 1994.
12-09-2025
West Ipoh Span Expressway Construction Will Begin After 2026
Construction of the West Ipoh Span Expressway is set to start after 2026, providing an alternative to the busy Menora Tunnel route.
12-09-2025
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah
The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.
12-09-2025
Proton: We Are Prepared To Serve New X50 After Sales In East Malaysia
Proton reassures it is more than capable of handling after sales coverage for face-lifted new X50 model in East Malaysia.
12-09-2025
PLUS: Up to 2.2 Million Vehicles Daily This Malaysia Day Weekend
PLUS expects traffic to hit 2.2 million vehicles per day on Sept 12, 13, 19 and 20,motorists urged to plan journeys with the MyPLUS-TTA app.
12-09-2025
Prasarana Rail Reliability Hits Record High, Disruptions Halved
Prasarana reports its best rail performance yet, with service reliability more than doubling since 2024.
12-09-2025
Caricarz Automall Sunday Car Market Returns Sept 21 After Strong Debut
Caricarz Automall Sunday Car Market returns Sept 21 to help owners beat lowball trade-ins with direct sales.
12-09-2025
Show More
trending_flat