Penang Still Waiting For Green Light From MOT For LRT project

Penang is ready to kick off full-scale construction of the Mutiara Line LRT but the state is still waiting for the official go-ahead from MRT Corp and the Transport Ministry.
According to Chief Minister Chow Kon Yeow, early-stage work like soil testing, land acquisition, and compensation talks is already underway. But actual construction by SRS Consortium, the appointed contractor for Package 1, can only begin once formal approval is granted.
-full-full_normal.jpg)
“We’ve done our part by handing over the LRT project to MRT Corp. It is now the federal government’s responsibility to issue the notice so construction can begin fully,” he says, clarifying that the state’s role with SRS Consortium now pertains solely to the Penang Transport Master Plan, as federal authorities have fully taken over the LRT project.
To avoid the kind of gridlock KL faced during its LRT construction, Chow said keeping roads open will be a top priority once the Mutiara Line project begins. He also assured that contractors will widen lanes near construction zones to reduce disruption for road users.
“Our focus is on making sure the project runs smoothly without creating traffic nightmares,” Chow said, adding that there are no plans to introduce any congestion charges.
The Mutiara Line will stretch 29.5km across Penang, linking the island’s southern tip to the northeast and extending all the way to the mainland. The RM10.5 billion project will feature 21 stations, designed to improve connectivity and ease daily commutes across the state.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQS9721
SELANGOR
BSN9358
JOHOR
JYU3534
PULAU PINANG
PSB2315
PERAK
APG4606
PAHANG
CFG1383
KEDAH
KGF1671
NEGERI SEMBILAN
NEJ9640
KOTA KINABALU
SJR2591
KUCHING
QAB5195N
Last updated 09 Apr, 2026
Fuel Price
Petrol
RON 95
RM 2.59
+0.05
RON 97
RM 3.15
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.04
+0.05
EURO 5 B7
RM 3.24
+0.05
Last updated 26 Feb, 2026
Related News
Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core
MRT Corp opens a three-month public review for the Penang Mutiara LRT, featuring a proposed six-kilometre cross-sea link to Penang Sentral.
23-02-2026
Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core
MRT Corp opens a three-month public review for the Penang Mutiara LRT, featuring a proposed six-kilometre cross-sea link to Penang Sentral.
23-02-2026
Ahmad Maslan: Gov. Mulling Further Cost-Reduction For MRT3
Deputy Finance Minister Ahmad Bin Maslan says that the government is mulling further cost-cutting measures in the MRT3 project.
31-03-2023
MRT Putrajaya Line Phase Two Operational March 2023, Total Line Spans 56.2KM
The 38.7 km-long section of the Phase Two alignment, which consists of 15 elevated stations and 9 underground stations, is expected to be operational in March 2023.
24-12-2022
Summons Discounts for Foreign Vehicles Will Be Reviewed – MOT
The Transport Ministry will review traffic summons discounts offered to foreign vehicles, says minister Anthony Loke.
30-01-2026
Govt Offers Up To RM4,000 To Replace 20-Year-Old Cars
Malaysians can now trade in vehicles over 20 years old for up to RM4,000 toward a safer Proton or Perodua.
28-01-2026
New RM22.7M JPJ Kajang Office Set for 2027
The new RM22.7M JPJ Kajang office will feature modern facilities and improved services for the public by 2027.
23-09-2025
Latest News
SUPER GT 2026 Malaysia Might Not Happen At All? Here’s What We Know So Far
Is SUPER GT 2026 Malaysia cancelled? Reports suggest the Malaysian round may be called off due to fuel concerns and high costs. Get the latest updates here.
07-04-2026
Is It Illegal To Borrow Your Parents' MyKad For Subsidised Petrol? Here’s What The Law Says
Can you use a family member's MyKad for Budi95 petrol? JPN warns that sharing IDs at the pump is prohibited and under investigation. Get the official rules here.
06-04-2026
Tough Times, But Everyone Still Wants a Saga: Sales Jump 38% Despite a Slow Market
Proton Saga defies the 2026 market slump with a 38% sales surge! Discover the new 1.5L engine, Level 1 ADAS, and tech upgrades making it Malaysia’s top choice.
03-04-2026
Malaysia Is Angry… But The World Is Already in Energy Crisis
Malaysia is cutting the BUDI95 quota to 200L. While we argue over liters, the world is in "Energy Survival Mode." Is an EV your secret to beating the 2026 crisis?
03-04-2026
GWM Malaysia Eyes Top 10 Spot by 2028: 6 New Models to Launch, Led by Tank 300 HEV
GWM Malaysia targets Top 10 status by 2028, launching 6 new SUVs starting with the Tank 300 HEV.
02-04-2026
Why Your Next Group Trip Costs 80% More: Diesel Hits Historic RM6.02 (April 2-8)
Malaysia's tour bus and van rates jump 80% as diesel hits a historic high.
01-04-2026
Bye-Bye RM1.99? Why Your Petrol Subsidy is Now a 'Timed' Reality
Will RON95 hit RM2.87? SERC warns of a "timed reality" for Malaysia's petrol subsidies. Break down the RM4 billion subsidy bill and what the 200L quota cut means for you.
01-04-2026
MITI Breaks Silence: The Truth Behind the '80% Export' Ultimatum
MITI breaks its silence on the viral BYD "80% export" rumors. From the RM100k EV price floor to the truth behind the BYD Shark "ban," here is the official clarification on Malaysia's automotive future.
31-03-2026
Show More
trending_flat