Solar Lights Transform Gerik-Jeli Highway After Crash Concerns
A stretch of the Gerik-Jeli East-West Highway (JRTB) is finally seeing light as newly installed solar-powered street lights brighten up the previously dim and dangerous route.
The installation of the solar-powered lamps is part of an ongoing effort by the Perak Public Works Department (JKR), with priority given to areas marked by recent accidents including a fatal crash involving a bus carrying Universiti Pendidikan Sultan Idris (UPSI) students and a Perodua Alza.
While questions have long surrounded the road’s safety, the Works Ministry says the highway itself isn’t to blame. A 2024 inspection found the road structurally sound. More importantly, national data shows that just 13% of road accidents are caused by infrastructure, while over 80% stem from human error.
Photo: Bernama.
“We’re not ignoring the concerns, but it’s clear that behaviour behind the wheel is the bigger risk,” the ministry said in a statement.
Its Minister Datuk Seri Alexander Nanta Linggi recently revealed that from 2023 to May 2024, the Public Works Department spent RM5.49 billion maintaining over 15,000 kilometres of federal roads including the JRTB.
This year alone, RM55 million has been allocated specifically for the Gerik-Jeli route.
The breakdown includes RM35 million for resurfacing, RM14.5 million for new safety features like guardrails and drainage, RM3.59 million for solar lighting, and RM1 million for pavement assessments across Perak.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPS2340
SELANGOR
BSH7400
JOHOR
JYG6278
PULAU PINANG
PRT9835
PERAK
APB2037
PAHANG
CFD4672
KEDAH
KGC2673
NEGERI SEMBILAN
NEH1073
KOTA KINABALU
SJM5849
KUCHING
QAB1586M
Last updated 15 Sep, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.18
+0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.90
+0.02
EURO 5 B7
RM 3.10
+0.02
Last updated 11 Sep, 2025
Related News
JRTB Gets RM55M for Repairs, Staged Rollout Planned
JKR to begin phased repairs on Gerik–Jeli stretch with RM55 million allocation.
23-06-2025
Gerik Tragedy: Survivor Recalls Bus Was Speeding Before Crash
A survivor of the Gerik bus accident recalled the bus traveling at high speed just before it veered off the road.
09-06-2025
PM Mourns Loss, Directs Aid For UPSI Students In Bus-MPV crash
PM Anwar expresses sorrow and orders assistance after 15 were killed in a Gerik-Jeli highway crash this morning.
09-06-2025
15 UPSI Students Killed In Tragic MPV-Bus Collision
15 killed in Gerik-Jeli Highway crash involving a bus transporting UPSI students and an MPV.
09-06-2025
Gerik Crash: No signs Of Brake, Steering Failure
Preliminary investigations into the fatal June 9 bus crash in Gerik, have not revealed any technical malfunctions.
15-06-2025
Gerik Crash: Motac Urges Return Of Authority Over Tourism Vehicles
In response to the fatal bus crash involving UPSI students, Motac aimed to regain control over tourism transport for safety reasons.
13-06-2025
Permit Of Bus Operator In Gerik Crash Revoked - Loke
The bus company involved in the fatal Gerik crash, which killed 15 UPSI students on Monday, has had its operating license revoked.
12-06-2025
MOT Developing Database System For Express, Tour Bus Drivers
MOT will establish a comprehensive database of express and tour bus drivers, including their histories.
12-06-2025
Latest News
GWM Wey 80 Teased Again, Now Renamed ‘Wey G9’ Instead
Upcoming GWM Wey 80 teased on social media, now bearing new ‘Wey G9’ nameplate too.
15-09-2025
Proton Iriz Production Ends – No Successor Planned, But Should There Be One?
Proton Iriz hatch production ends without a successor, leaving automaker without a new hatch model since 1994.
12-09-2025
West Ipoh Span Expressway Construction Will Begin After 2026
Construction of the West Ipoh Span Expressway is set to start after 2026, providing an alternative to the busy Menora Tunnel route.
12-09-2025
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah
The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.
12-09-2025
Proton: We Are Prepared To Serve New X50 After Sales In East Malaysia
Proton reassures it is more than capable of handling after sales coverage for face-lifted new X50 model in East Malaysia.
12-09-2025
PLUS: Up to 2.2 Million Vehicles Daily This Malaysia Day Weekend
PLUS expects traffic to hit 2.2 million vehicles per day on Sept 12, 13, 19 and 20,motorists urged to plan journeys with the MyPLUS-TTA app.
12-09-2025
Prasarana Rail Reliability Hits Record High, Disruptions Halved
Prasarana reports its best rail performance yet, with service reliability more than doubling since 2024.
12-09-2025
Caricarz Automall Sunday Car Market Returns Sept 21 After Strong Debut
Caricarz Automall Sunday Car Market returns Sept 21 to help owners beat lowball trade-ins with direct sales.
12-09-2025
Show More
trending_flat