RM600 Million Super Magnet Plant Set to Power Malaysia’s EV Ambitions
-full_normal.jpg)
Prime Minister Datuk Seri Anwar Ibrahim revealed South Korea’s JS Link and Australia’s Lynas Malaysia will jointly invest RM600 million to develop a super magnet manufacturing facility in Kuantan, Pahang.
The high-impact project is expected to process up to 3,000 tonnes of neodymium-iron-boron (NdFeB) permanent magnets annually, a critical component in the production of electric vehicles (EVs) and wind turbines. It is also seen as a major step toward positioning Malaysia as a global hub in the rare earth supply chain.
Anwar said both companies have completed preliminary preparations, with land already acquired and groundwork set to begin soon. “This is no longer just a memorandum of understanding. The investment is in, the land is ready, and we are now moving to accelerate the process,” he said.
-full_normal.jpg)
The Prime Minister will meet with Pahang Chief Minister Datuk Seri Wan Rosdy Wan Ismail to discuss project coordination, while Investment, Trade and Industry Minister Tengku Datuk Seri Zafrul Abdul Aziz will review and monitor its progress.
Anwar highlighted that the collaboration reflects growing investor confidence in Malaysia’s advanced materials and clean technology ecosystem, supporting the global transition toward a sustainable and resilient critical minerals supply chain, essential for EVs, renewable energy, and high-tech manufacturing.
-full_normal.jpg)
Under the earlier agreement signed in July, Lynas will collaborate with JS Link to develop the facility near Lynas’ Advanced Materials Plant in Kuantan, expanding the company’s downstream operations into high-value rare earth magnet production. JS Link, meanwhile, is deepening its role in the global rare earth magnet industry as it works to build a more sustainable supply chain.
The RM600 million project underscores Malaysia’s strategic intent to move further downstream in the rare earth industry, capturing more value from processing and high-tech manufacturing linked to EV and clean energy sectors.
There are growing calls for the Pahang state government to ensure that at least 30% of employment opportunities at the new facility are reserved for local residents, ensuring that economic benefits directly reach the state’s workforce.
Source: Bernama
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPY762
SELANGOR
BSJ9016
JOHOR
JYK5764
PULAU PINANG
PRV4429
PERAK
APC3163
PAHANG
CFD9712
KEDAH
KGC8509
NEGERI SEMBILAN
NEH5261
KOTA KINABALU
SJN5354
KUCHING
QAB4754M
Last updated 03 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
+0.06
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.95
+0.06
EURO 5 B7
RM 3.15
+0.06
Last updated 30 Oct, 2025
Latest News
RTS Link 65% Complete, First Train Arriving This Month
RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.
03-11-2025
Toyota Skill Contest 2025 Winners Announced
Winners for the Toyota Skill Contest 2025 organised by UMW Toyota Motor have been announced.
03-11-2025
Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border
Only 0.6% hit the 300L limit under BUDI95 programme with most recipients using only about 98 litres in Oct.
03-11-2025
RM600 Million Super Magnet Plant Set to Power Malaysia’s EV Ambitions
RM600 million JS Link–Lynas investment drives Malaysia’s push in downstream REE processing for EV and clean energy sectors.
03-11-2025
Datuk Abdul Rashid Musa Returns To Proton As Deputy CEO
Datuk Abdul Rashid Musa returns to Proton as Deputy CEO, succeeding Roslan Abdullah.
03-11-2025
ETS3 To Johor Bahru Set To Roll Out by Mid-December
The ETS3 line is set to launch by mid-Dec, extending the Electric Train Service from Gemas to JB.
03-11-2025
Selangor Govt Will Decide Fate Of 19 WCE-Affected Residents
The Selangor govt is set to decide soon on the fate of 19 Kampung Jawa residents affected by the West Coast Expressway project.
03-11-2025
APAD Orders Aeroline To Halt Services Over Repeated Non-Compliance
Aeroline was directed to halt trips from Nov 6 to Dec 5 after failing to relocate to approved terminals as required by APAD.
03-11-2025
Show More
trending_flat
