Perodua Traz/Nexis D66B Teased Online – Launching Soon?

Perodua has published a short video teaser featuring the upcoming Traz/Nexis D66B SUV. Launch imminent?
After launching its first-ever EV model—the Perodua QV-E—earlier this month, Perodua has now teased its next model via a short video published on its official social media channels. From said video, we are certain that the teased model could be P2’s long-awaited B-segment SUV crossover, the Perodua Nexis.
Codenamed D66B, the Nexis—also known as the Perodua Traz from rumours circulating online—is essentially Perodua’s version of the DNGA-based Toyota Yaris Cross, which was developed specifically for the Southeast Asian market, and not to be confused with its nameplate twin in Japan and Europe.

From the shadow-draped image, there’s not much we can extract from it, except that the D66B Nexis/Traz will feature the same sporty SUV crossover bodystyle as its Toyota twin, while at the same time featuring what appears to be the Cranberry Red exterior colour that is offered on many other Perodua models.

Another image unveiled in said teaser video showcases the front grille part of the car, where it gets a slightly different grille insert design compared to the Yaris Cross, featuring segmented horizontal slats finished in gloss black. Naturally, the D66B wears a chromed Perodua badge instead of a Toyota one.

Beneath its bonnet, we simply don’t know what powertrain will be offered for the Nexis/Traz, but we know that the DNGA Yaris Cross is offered in both full combustion (ICE) and parallel hybrid (HEV) options. The former comes in the form of a 1.2-litre 4-cyl 2NR-VE naturally-aspirated petrol engine rated at 106 PS and 138 Nm, which is then mated to either a five-speed manual or a CVT gearbox that sends power to the front wheels (FWD).


Meanwhile, the hybrid version gets a larger 1.5-litre 4-cyl nat-asp 2NR-VEX petrol engine rated at 91 PS and 121 Nm, which is then augmented with an e-motor producing 80 PS and 141 Nm. Power is also sent to the front wheels, this time via an e-CVT automatic gearbox.
-full_normal.jpg)
-full_normal.jpg)
Rendered images of the Perodua Nexis by Theophilus Chin (@theottle)
Talks of Perodua launching the Nexis D66B/Traz started way back in 2024, although the original plan was eventually delayed and pushed back to give way for the development of the QV-E EV. Mind you, this short teaser video is also the first official release made by Perodua to outright feature the mysterious D66B, so perhaps it won’t be long before we get to see this B-segment SUV crossover in the flesh.
Gallery
Written By
Mukhlis Azman
An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman
JPJ Running Numbers
KUALA LUMPUR
VRQ1030
SELANGOR
BST6848
JOHOR
JE2469J
PULAU PINANG
PSF5412
PERAK
APL4621
PAHANG
CFH7304
KEDAH
KGJ1094
NEGERI SEMBILAN
NEL8362
KOTA KINABALU
SJU1209
KUCHING
QAB5610P
Last updated 16 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Latest News
Puspakom Has More Rivals Now. So Why Aren't Car Inspections Getting Cheaper?
Puspakom now has rivals for M.V.15 ownership transfer inspections, but fees won't get cheaper. Here's why JPJ is keeping rates standardised.
15-09-2026
If You're In Penang And Eyeing A Suzuki, There's A New Showroom To Check Out
Suzuki has opened a new RM1 million dealership in Juru, Penang, expanding its Malaysian network to 14 sales outlets and 13 service centres.
14-09-2026
Malaysia Has More Car Brands Than Ever. So Why Do We Still Choose Proton And Perodua?
Proton and Perodua account for nearly 63% of Malaysia's new car registrations in 2026. Here's why national brands still dominate despite growing competition.
14-09-2026
40,595 Summonses, RM12.18 Million Unpaid. JPJ's Patience Is Running Out
JPJ has given 945 transport companies 14 days to settle 40,595 outstanding summonses worth RM12.18 million or face tougher enforcement.
11-09-2026
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Would You Trust Malaysia's MLFF System To Charge The Right Car, Every Time?
Malaysia's MLFF is moving forward, but how will barrier-free tolls identify and charge the right car? Here's how RFID, ANPR and the system could work.
09-09-2026
Is "Adjusting" Used-Car Mileage Really Normal In Malaysia?
A Bro Wong-SCRUT dispute has put used-car mileage adjustment back in focus. How common is odometer tampering in Malaysia, and are buyers protected?
09-09-2026
Show More
trending_flat