ENZHMS
Link Copiedcheck_circle
Auto News

5 Game-Changing Upgrades Coming To The New RM100M Seremban Sentral Station By March 2027

Sofea Najmi

Share via

Seremban-Sentral-5.png


Artist’s impression of Seremban Sentral Transit-Oriented Development (TOD) mega project.


Commuters and residents in Negeri Sembilan have a major infrastructure milestone to look forward to! The construction of the new Seremban Sentral railway station has reached 35% progress, marking a huge leap forward in turning Seremban into a modern transit hub.


Transport Minister Anthony Loke confirmed that the hardest phase of the project, which involved delicate underground piling, positioning, and relocating heavy utility cables, is officially complete. Construction is now accelerating toward a targeted completion date of March 2027.


Integrating with the original 100-year-old historic station, the RM100 million makeover aims to make travel smoother, safer, and far more convenient for decades to come. Here are 5 massive upgrades coming to the new station.

⚡ QUICK SUMMARY TLDR: WHAT YOU NEED TO KNOW
  • Construction Milestone: The project is currently 35% complete, with challenging piling and underground utility work finished. Full completion is targeted for March 2027.
  • Massive Capacity Boost: Designed to serve 30,000 daily commuters initially, with expandable infrastructure to support up to 120,000 passengers across 6 total platforms.
  • Iconic Minangkabau Design: Features green building elements, a daylight-optimizing glass roof, new commercial spaces, and full integration with the 100-year-old historic station.
  • Solving Floods & Jams: Equipped with dual entrances (Jalan Tunku Antah and rear drop-off) to cut traffic congestion, plus a new dedicated culvert line to prevent platform flash floods.
  • Faster Commutes Ahead: Works run alongside KVDT2 to pave the way for increased KTM Komuter and ETS train frequencies once completed.


1. Minangkabau architecture meets a modern glass roof 


The new station is designed around a green building concept that blends Negeri Sembilan’s cultural heritage with futuristic aesthetics.

  • Minangkabau Elements: The roof structure takes clear inspiration from traditional Minangkabau architecture, celebrating local identity.
  • Glass & Daylight Optimization: The main concourse will feature glass roof structures designed to maximize natural sunlight during the day, significantly reducing electricity consumption.
  • Commercial Spaces: Passengers can look forward to new retail and dining outlets inside the concourse while waiting for their trains.

🕰️ Preserving 100 Years Of History

Old-Seremban-Railway-Station.png

While the new modern hub is being built, conservation work on the century-old historic Seremban station has been completed! This included restoring the famous roof clock tower and rewiring electrical systems to keep the heritage building safe and functioning.


2. Platform expansion to handle up to 120,000 passengers daily 


Designed to meet public transport demand for the next 30 to 50 years, the station's capacity is getting a massive boost.


Initially, the station will feature 3 platforms catering to 30,000 passengers per day. However, the structural blueprint includes provision for 3 additional platforms (making 6 platforms in total), allowing the station to comfortably expand up to 120,000 passengers daily as rider demand grows.


3. Dual entrances & drop-off zones to cut town traffic 


Seremban-Sentral-6.png


Artist’s impression of Seremban Sentral Transit-Oriented Development (TOD) mega project.


Anyone who has picked up a passenger at the old station knows the single-lane bottleneck can get chaotic during peak hours.


To solve this, the new station will feature two separate entrances and passenger drop-off points:

  • Front Entrance: Situated along Jalan Tunku Antah.
  • Rear Entrance: Located at the back of the station, dispersing traffic away from the main town center roads.
  • This dual-entrance layout will smoothly integrate with the upcoming RM2 billion Seremban Sentral Transit-Oriented Development (TOD) mega project directly behind the station.

4. Brand new drainage system to eliminate platform flash floods 


Heavy downpours have historically caused frustrating flash floods along the platform and tracks, bringing train operations to a standstill.


As part of the project's additional scope, workers are constructing a brand-new dedicated culvert system. This new drainage line will divert stormwater directly into Sungai Temiang without passing through station grounds, ensuring tracks remain dry and functional even during monsoon storms.


5. Higher KTM Komuter & ETS train frequencies on the horizon 


seremban-ktm-komuter-station-005.jpg


Commuters have noticed reduced midday train frequencies recently. Anthony Loke clarified that one track was temporarily closed to allow workers to safely accelerate construction on both the station and the Klang Valley Double Track Phase 2 (KVDT2) project, which is now 55.8% complete.


Once both projects are completed, train schedules will be revamped. Commuters can expect higher frequencies and shorter waiting times for KTM Komuter and ETS services, making daily commuting between Seremban and Kuala Lumpur faster and far more reliable.


Watch: Seremban Sentral TOD



Share This Article

Written By

Sofea Najmi

A Bachelor of English Language and Literature graduate with an obsession for the finer details. Sofea uses her background in translation to decode the technicalities of automotive innovation. She is dedicated to delivering impactful, meticulously researched articles that provide a narrative far beyond the spec sheet. LinkedIn: https://bit.ly/3C018vv

Share via

JPJ Running Numbers

KUALA LUMPUR

VRU6994

SELANGOR

BSU5161

JOHOR

JG1390J

PULAU PINANG

PSG5987

PERAK

APM3957

PAHANG

CFJ1762

KEDAH

KGJ5290

NEGERI SEMBILAN

NEM3477

KOTA KINABALU

SJU6302

KUCHING

QAB7870P

Last updated 21 Oct, 2026

Fuel Price

Petrol

RON 95

RM 3.97

+1.38

RON 97

RM 4.90

+1.75

RON 100

RM 7.20

+2.20

VPR

RM 8.23

+2.00

Diesel

EURO 5 B10

RM 5.12

+2.08

EURO 5 B7

RM 5.32

+2.08

Last updated 30 Apr, 2026

Latest News

Auto News
6,537 Road Deaths In 2025 - Can Malaysia's New Safety Push Make A Difference?

6,537 Road Deaths In 2025 - Can Malaysia's New Safety Push Make A Difference?

Malaysia recorded 6,537 road deaths in 2025. With a new MOT-MIROS proposal underway, can the country meet its target to halve fatalities by 2030?

20-10-2026
Auto News
ECRL Vs Driving To Kota Bharu: Petrol, EV Or Train, Which Costs Less?

ECRL Vs Driving To Kota Bharu: Petrol, EV Or Train, Which Costs Less?

ECRL fares to Kota Bharu start at RM125. We compare train tickets with petrol and EV energy costs to see which option makes more sense.

19-10-2026
Auto News
"We'd Love To Go Back": Mercedes Eyes Sepang Return As F1 Night Race Idea Emerges

"We'd Love To Go Back": Mercedes Eyes Sepang Return As F1 Night Race Idea Emerges

Mercedes-AMG Petronas F1 wants to return to Sepang, while Signify says a night race is technically possible. Could Malaysia's next F1 race be after dark?

19-10-2026
Auto News
RM52,000 In Car Rebates? Sime Motors' 3-Day Sale Is Now On!

RM52,000 In Car Rebates? Sime Motors' 3-Day Sale Is Now On!

Sime Motors' 3-day sale runs from 16 to 18 October 2026 in Ara Damansara, with car rebates up to RM52,000, test drives and special offers.

16-10-2026
Auto News
RM950 Million From F1 At Sepang. So Why Is Malaysia Still Hesitating?

RM950 Million From F1 At Sepang. So Why Is Malaysia Still Hesitating?

F1 at Sepang generated nearly RM950 million in economic impact. But a five-year Malaysian GP deal could cost RM1.5 billion. Here's why.

16-10-2026
Auto News
35 Cars Daily! BYD's New Miri 3S Centre Puts Aftersales In Focus

35 Cars Daily! BYD's New Miri 3S Centre Puts Aftersales In Focus

BYD's new Miri 3S Centre can service up to 35 cars daily. Here's how the latest Sarawak expansion strengthens aftersales support for EV owners.

15-10-2026
Auto News
Chery Omoda 5 Recall: 600 Cars In 2024, 8,878 In 2026. What Changed?

Chery Omoda 5 Recall: 600 Cars In 2024, 8,878 In 2026. What Changed?

Chery's Omoda 5 recall covers 8,878 vehicles, compared with 600 in 2024. Here's what changed, what remains unknown and what owners should do.

15-10-2026
Auto News
BYD Was Supposed To Build Its Own Factory. So Why Inokom Now?

BYD Was Supposed To Build Its Own Factory. So Why Inokom Now?

BYD has chosen Inokom for Malaysian CKD assembly after changing its Tanjung Malim plans. Here's why the Kulim facility makes sense.

15-10-2026

Show More

trending_flat

Malaysia First Used Car and EV Consignment Platform

This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

I want to consign my car! Trade-in price too low.

CariCarz Automall

Understanding CariCarzAutomall Consignment Plan

Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge

Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2026 CariCarz.com. All Rights Reserved.