Link Copiedcheck_circle
Auto News

Gemas-JB Double Tracking Project To Fully Complete in 2023

Jesica Sendai

Share via


Recently Bernama has reported that the Gemas Johor Bahru Electrified Double Tracking Project has reached 85% of its completion. According to Transport Minister Datuk Seri Dr Wee Ka Siong, he highlighted on the project which shall be fully completed by next year.

‘’Keretapi Tanah Melayu Bhd (KTMB) is waiting for someone for the completion of a depot in Kempas. Also, we will use the partial completion method to test the electric train service using that track,’’ he told the media after inspected KTM Kluang Station on November 14.

On top of that, the electrified double-tracking project which covers 192 kilometres of tracks will be going through 11 stations. Once completed, trains will be operated to cover the KL Sentral – JB Sentral route in three hours and 30 minutes at a speed of 140 km per hour.

Source: BERNAMA

 

 


Tagged:

KTM
JB
GEMAS
Share This Article

Written By

Jesica Sendai

from 9 to 5 grinder to 'racing' her way in the automotive industry through editorial work.

Share via

Related News

Auto News

Six In 10 Rail Users In Klang Valley Are Female - Loke

The Transport Ministry says 60% of peak-hour train commuters in the Klang Valley are women.

19-02-2025
Auto News

Public Transport Ridership In KL Hits New High In July - PRASARANA

The latest data from the Transport Ministry show that public transportation ridership in the Klang Valley increased by 11% in July.

26-08-2024
Auto News

Men Will Face Fines For Travelling In Women-Only Carriages - Loke

The government is now working on legislation that would penalize men for entering pink coaches on public transportation, says Anthony Loke.

15-08-2024
Auto News

No Bicycles On ETS And Intercity Trains - KTMB

Bicycles are not permitted on Keretapi Tanah Melayu Berhad (KTMB)'s ETS and KTM Intercity train services, the company announced.

03-04-2024
Auto News

Public Transport Ridership Records An Average of 1.1 Million Commuters Per Day - PRASARANA

Prasarana records a steady increase in the number of people using public transportation, with an average of almost 1.1 million users per day.

04-12-2023
Auto News

"Need To Optimise Space On Short Commuter Trains Greater Than Need For Special Women's Coaches" - Loke

There are no special coaches for women on the public transportations because space on such trains must be maximized, says Loke.

23-03-2023
Auto News

KTM East Coast Intercity Train Services Resume - Flood Condition Improves

Keretapi Tanah Melayu Berhad (KTMB) just announced that its Intercity KTM train services on the east coast route which was disrupted earlier in the week due to flood has been fully restored as of 11.50am.

Auto News

New KTM X-Bow GT-XR is a street-legal GT2 racer

New KTM X-Bow GT-XR is a street-legal GT2 racer, and it’s touted as the most extreme version of the KTM X-Bow yet.

08-09-2022

Latest News

Auto News

Leapmotor B10 Open For Bookings – Est. From RM110,000

Early bookings now opened for upcoming new Leapmotor B10 EV C-SUV with estimate starting price of RM110,000.

17-11-2025
Auto News

MTSB Memorandum Set to Be Presented to Cabinet Soon – Loke

The memorandum for the Malaysian Transport Safety Board will be presented to the Cabinet soon, says Transport Minister Anthony Loke.

17-11-2025
Auto News

Mitsubishi Destinator Earns 5 Stars ASEAN NCAP Rating

Mitsubishi’s all-new Destinator secures 5-star ASEAN NCAP rating, reinforcing its readiness for the region.

Auto News

Malaysia Autoshow Expands With Penang And Johor Editions In 2026

Malaysia Autoshow by MARii expands with Penang and Johor editions in 2026.

17-11-2025
Auto News

Three Laws To Be Updated For MLFF Toll System - Ahmad Maslan

The government will revise key road laws before launching the Multi-Lane Free Flow (MLFF) system.

17-11-2025
Auto News

Gua Musang-Jeli Road To Reopen By Month-End After Sinkhole Repairs

KM 11.95 of the Gua Musang-Jeli Road is being repaired after a sinkhole and landslide.

17-11-2025
Auto News

RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot

Train Set 02 has arrived at Wadi Hana Depot, marking the start of critical testing and commissioning.

17-11-2025
Auto News

Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.

17-11-2025