Link Copiedcheck_circle
Auto News

Loke Urged To Probe PN's Decision To Terminate KL-SG High Speed Rail

Anis

Share via



The decision to halt construction on the Kuala Lumpur-Singapore high-speed rail (HSR) project by the Perikatan Nasional-led (PN) government has been called for Loke Siew Fook, minister of transportation, to look into.

When the HSR was unveiled by the Najib Razak administration, Aziz Kaprawi was the deputy transport minister. He said that several studies indicated the project would have helped the populace and the economy.

It was predicted that the HSR would reduce the distance between KL and Singapore's airport to just 90 minutes.



On January 1, 2021, the railway project was abandoned, and as part of its commitment under the bilateral agreement, Malaysia was required to compensate Singapore with RM320 million.

Later, it was revealed that Singapore had refused Putrajaya's request to oust the HSR's systems provider and network operator, who would have had to answer to both nations.

A complete lack of transparency was present (from the PN government). What research was used by the government at the time to make its decision?

"Has the Cabinet offered or debated a replacement (for the HSR)?" said Aziz.

It was in the best interest of the public to be aware of all the specifics surrounding the cancellation of the HSR, thus he hoped Loke would unearth them.

He said that such an investigation should be "thorough and transparent."

After the project was scrapped, Mustapa Mohamed, who was then the minister of economic affairs, disclosed that a study into a potential KL-Johor Bahru HSR had been finished and submitted to the Cabinet.

Aziz said that this study's specifics should be made public as well, pointing out that experts had expressed concern that a KL-Johor Bahru route wouldn't be financially viable.

There needs to be responsibility. Who profited from the KL-Singapore HSR's cancellation? Why was such a terrible choice made? he said.

The KL-Singapore HSR project has received numerous requests to be reactivated.



Among those who believe the project should be continued are former finance minister Lim Guan Eng because it would benefit states like Johor, Melaka, Negeri Sembilan, and the Klang Valley economically.










Gallery

Tagged:

Ministry of Transport
GE15
Kuala Lumpur-Singapore high-speed rail (HSR)
Loke Siew Fook
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Bas.My Launched with Focus on Accessibility and Affordability

Loke: 48 brand-new buses and 13 routes, Bas.My is setting a new standards for stage buses in Kedah.

Auto News

Proton Xchange Programme Launched To Woo Older Car Owners To Trade-in And Up

New Proton Xchange Programme sees national automaker wooing older car owners to trade-in and up.

15-05-2025
Auto News

Heavy Vehicles Banned from Using Right Lane on Highways – MoT

Heavy vehicles like buses and lorries are banned from using the right lane on highways, the Transport Ministry says.

18-03-2025
Auto News

Report: Special Number Plates Generated RM45.9 million For B40

The government reportedly collected RM45.9 million to assist B40 groups from sale of special number plates in 2024.

24-02-2025
Auto News

JPJandora Investigation Report On Alleged JPJ Misconduct Ready Says Loke

Transport Minister Loke says investigation report papers detailing alleged misconduct by JPJ officials now ready.

14-05-2024
Auto News

Transport Ministry Will Introduce DRT Service To Improve Public Transport

Transport Ministry will implement demand-responsive transit (DRT) or on-demand transit van service in the Klang Valley.

18-12-2023
Auto News

Total Number Of Registered Vehicles In Malaysia Now At 36.3 Million Units - Loke

The number of registered vehicles in Malaysia has surpassed the population of the nation, with a total of over 36.3 million vehicles.

07-12-2023
Auto News

Several Private Sectors Submitted Bids To Fund KL-SG HSR Project

The Malaysian government has announced there are several project proposals from the private sector to fund KL-HSR.

28-03-2023

Latest News

Auto News

Updated Fuel Prices From 13 To 19 November

The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 13 to 19 November, 2025, the rates are as such.

12-11-2025
Auto News

RM1.7b NPE2 Extension To Ease KL Congestion By 2029 - Nanta

The NPE2 will connect Pantai Dalam to Jalan Istana, cutting travel time by up to 25 minutes and improving traffic flow across KL.

12-11-2025
Auto News

BYD Shark PHEV Pick-Up Truck Teased by BYD Cars Malaysia – Coming Soon?

BYD Cars Malaysia has dropped a teaser for the BYD Shark PHEV pick-up truck. Coming to Malaysia soon?

12-11-2025
Auto News

Malaysia Scraps Rule of 78, Car Loan Savings Ahead - Analysts

Malaysia ends the Rule of 78, letting car loan borrowers save more with fairer interest.

12-11-2025
Auto News

Govt Not Forcing Aeroline To TBS, Corus KLCC Stop Unsuitable

Express bus operators aren’t forced to use TBS or TBG but must run from safe, licensed terminals.

12-11-2025
Auto News

Oct 2025 Vehicle Sales Up 30%, xEV Share at 8.7%

Malaysia’s car market surged in Oct 2025 with 81,413 new registrations, up 30% from Sept’s 62,598 units.

Auto News

LATAR Interchange Opens, Direct Access To Eco Grandeur

The Eco Grandeur Interchange and Toll Plaza has officially opened, offering direct access through Exit 2502 to Eco Grandeur.

11-11-2025
Auto News

Penang Sentral Set to Become Mainland’s Integrated Transport Hub

The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.