Link Copiedcheck_circle
Auto News

Motorcyclist Died After Hitting Road Divider On SUKE

Anis

Share via



On Saturday (Dec 3), a motorcyclist was killed in a late-night accident on the Sungai Besi-Ulu Kelang Elevated Expressway (SUKE).

Ampang Jaya OCPD Asst Comm Mohamad Farouk Eshak said in a statement on Sunday (Dec 4) that the victim, a man in his twenties, lost control of his motorcycle after a turn near KM18.9.

"He then entered the (oncoming) lane before colliding with a divider.

"The resulting fall left him with head and facial injuries.

"He was pronounced dead at the scene by medical officers from Hospital Ampang," he said.

According to ACP Mohamad Farouk, there are no CCTV cameras at the location.

"We ask witnesses to share information by contacting traffic investigation officer Insp Muhamad Yusaiful Muhamat Basir at 011-1307 8348," he added.


Gallery

Tagged:

SUKE
Sungai Besi-Ulu Kelang Elevated Expressway (Suke)
Road Accident
Malaysia’s Road Accident Rate
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Police Urges SUKE ‘Wire Trap’ Victim to Lodge Report

PDRM has urged motorcyclist hurt by ‘wire trap’ on SUKE highway to lodge a report.

15-05-2024
Auto News

Phase 2 Of SUKE Highway Opens At Midnight

SUKE highway Phase 2 will open to the public at midnight tonight.

15-06-2023
Auto News

SUKE Highway Phase 2 Teased

Prolintas teased a picture of the upcoming phase 2 of the SUKE highway, claiming that the journey from Ulu Kelang to Sri Petaling will take only 20 minutes.

06-06-2023
Auto News

SUKE Route Will Be Closed From Thursday To Friday Due To Road Paving Work

The Sungai Besi - Ulu Kelang Elevated Expressway Privatization Project (SUKE) will have temporary closures from 10 p.m. to 5 a.m. on April 6th (Thursday) and 7th (Friday).

05-04-2023
Auto News

SUKE Jalan Cheras exit ramp set for review

Prolintas set to review Jalan Cheras exit ramp on new Sungai Besi-Ulu Kelang Expressway (SUKE) following complaints by motorists.

27-09-2022
Auto News

SUKE Highway Registering Nearly 100,000 Vehicles

Recently reported by local media, nearly 100,000 vehicles were registered using the Sungai Besi-Ulu Kelang Elevated Expressway (SUKE), as soon as it was opened starting last Friday.

21-09-2022
Auto News

An accident has been reported two days after the SUKE Expressway commenced

An accident has been reported two days after the SUKE Expressway being open to the public.

19-09-2022
Auto News

The new SUKE highway is set to open very soon

New Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) will be opened to the public soon, and here’s what you ought to know.

15-09-2022

Latest News

Auto News

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.