Link Copiedcheck_circle
Auto News

Section 11 Of the West Coast Expressway Will Complete By Year End

Anis

Share via

caricarz-19.jpg

Number of vehicles passing through the WCE has increased by 30%, to 50,000 to 60,000 vehicles per day.

West Coast Expressway Sdn Bhd (WCESB) plans to open four more sections of the West Coast Expressway by the end of the year, including the SKVE, Banting, Assam Jawa, and South Taiping sections.

WCE Highway operations manager Syed Muhd Naguib Syed Mohd told Bernama that the 35-kilometer (km) Section 11, Beruas-South Taiping section is 88% complete and will be operational by the end of the year. According to Naguib, the construction involves elements of engineering, toll, slope, and mechanical work at the moment. He also stated that WCE will construct an animal box culvert as an environmental conservation measure because the route will pass through Bubu Forest Reserve.


“WCE also intended to build two electric vehicle charging stations at Lekir and Teluk Intan, as well as four Rest and Service Areas (R&R) — Teluk Intan R&R (north and south), Sungai Wangi R&R (south), Ayer Tawar R&R (north), and Sg Nyior R&R (north and south)”, he added.
He also stated that the number of vehicles passing through the WCE has increased by 30%, to 50,000 to 60,000 vehicles per day.
“During the recent Aidilfitri celebrations, traffic volume reached 100,000 vehicles a day and 85,000 for Raya Aidiladha,” he said.

caricarz-20.jpg




Tagged:

West Coast Expressway (WCE)
West Coast Expressway Sdn Bhd (WCESB)
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

West Coast Expressway On Track For 2027 Completion

The West Coast Expressway is on track for full completion by 2027, with eight of its 11 sections already open.

27-08-2025
Auto News

Hauliers Demand Swift WCE Land Fix

Association of Malaysian Hauliers urges swift resolution of land disputes delaying completion of the WCE Section 3.

11-08-2025
Auto News

230km Southern WCE Feasibility Study To Conclude By Dec

Study underway on 230km WCE from Banting to Gelang Patah to ease North-South Expressway jams.

08-08-2025
Auto News

WCE Sec 2 Toll Enabled; Responds to Klang Eviction Claims

WCE starts toll operations in Seksyen 2 and clarifies illegal evictions claims.

Auto News

Hari Raya 2025: Over 140K Vehicles Expected Daily on WCE

Over 140,000 vehicles are expected to use the WCE daily during this upcoming Hari Raya Aidilfitri festive season.

24-03-2025
EV

WCE Section 2 Opens with 240 kW DC Handal Charging Station

WCE Section 2 opens today toll free till 22 Feb, features 240 kW DCFC station by DC Handal.

Auto News

ECRL Kelantan LIne 87.8% Complete, On Track for 2026 Completion

ECRL project makes swift progress to reach 87.8% completion, and it appears on track for planned 2027 launch.

Auto News

WCE Sees 83% Increment In Traffic & 128% Increment In Toll Collection

WCE sees increased average daily traffic volume by 83% supported by a boost in toll income by 128%.

Latest News

Auto News

Petrol Cards And Civil Servant Perks On Offer By Jetour Malaysia This Month

Up to RM1 million worth of free petrol cards plus special perks for civil servants on offer from Jetour Malaysia this month.

20-09-2025
Auto News

TQ Wuling Bingo EV CKD Production Set to Begin in Dec 2025

The new SGMW-Tan Chong joint venture EV plant will start its local assembly efforts this Dec with the TQ Wuling Bingo.

19-09-2025
Auto News

MyKad Checks Urged Ahead of Fuel Price Drop

Home minister urges Malaysians to fix faulty MyKad chips early to enjoy the upcoming targeted fuel subsidy.

19-09-2025
Auto News

GAC Emkoo Awarded 5-star ASEAN NCAP Rating

Upcoming GAC Emkoo C-SUV earns coveted 5-star rating form ASEAN NCAP crash-testing regime.

19-09-2025
Auto News

KLCC Roads Closed Saturday For Sarong Music Run

Expect road closures and traffic delays around KLCC tomorrow for the Malaysia Sarong Music Run 2025.

19-09-2025
Auto News

Sand, Log Trucks Dominate Kelantan Roads - JPJ

Sand and log trucks make up most heavy vehicle traffic in Kelantan, with fewer overloaded cases.

19-09-2025
Auto News

Customs Seizes 32 Imported Cars Worth RM8.45 Million

Ops Purple uncovered vehicles stored beyond the legal limit, with unpaid duties and taxes totalling RM5.38 million.

19-09-2025
Auto News

MAA: Aug 2025 Sales Up 4.2%, YoY Growth Modest at 0.6%

Latest MAA Aug 2025 sales figures see PVs contribute 67,302 units, with CVs taking the remaining 5,739.