- News
- Auto News
- SUKE Expressway Interchange Closure - Rain Water Drain Pipe Works, 24 & 25 July
SUKE Expressway Interchange Closure - Rain Water Drain Pipe Works, 24 & 25 July
Sungai Besi - Ulu Kelang Elevated Expressway (SUKE) has announced a temporary closure of the Shell Bandar Tasik Selatan interchange on MRR2 towards Sungai Besi to accommodate the scheduled repair works of the Rain Water Drain Pipe (RWDP) at the Shell Bandar Tasik Selatan Interchange.
The temporary closure of the Shell Bandar Tasik Selatan interchange on MRR2 towards Sungai Besi would take place on 24 and 25 July from 11PM to 5AM during the off-peak hours. This closure is a safety measure to allow for the execution of the aforementioned activities.
Users coming from Shell Bandar Tasik Selatan who wish to access MRR2 can utilise the exit route via Jalan Tasik Selatan 31 as an alternative route (Refer to the Green Alternative Route Map).
During the repair works, there would be movement of heavy machinery within the construction area and would be strictly controlled by safety personnel with warning signs placed along the routes.
Users are advised to adhere to the speed limit and follow the instructions of personnel to ensure smooth travel and exercise caution while driving in the construction area.
Tagged:
Written By
KS
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well! https://www.linkedin.com/in/kumeran-sagathevan/