Link Copiedcheck_circle
Auto News

Penang Bridge Will Be Temporarily Closed On Dec 17 For Marathon

Anis

Share via

PBIM-Penang-Bridge-Closure.jpg Sunday, December 17, from 12.01 am to 10 am, will see a temporary closure of the Penang Bridge due to the 2023 Penang Bridge International Marathon.

After the marathon, at 10 a.m. on the same day, PLUS Malaysia Bhd (PLUS) said in a statement that the bridge would reopen and operate normally. PLUS advised people to follow all posted instructions and signboards and to use the Sultan Abdul Halim Muadzam Shah Bridge (Second Penang Bridge) as a backup.

download-(16).jpeg

The X @PLUSTrafik app, PLUS app, Chatbot PUTRI, and electronic message signs at specific locations are the ways that motorists can access the most recent traffic information, it continued.


In case of an emergency, drivers can also reach assistance by calling the PLUSLine at 1800-88-0000.


Tagged:

Penang bridge closure
penang bridge
2023 Penang Bridge International Marathon.
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Penang Bridge Closure On January 20 For Repair Work

The Penang Bridge's left and middle lanes will be closed for maintenance on Saturday, January 20, from 10 p.m. to 8 a.m.

19-01-2024
Auto News

Second Penang Bridge Closed This Friday Night For Police Fun Ride

Second Penang Bridge will be closed temporarily from 10pm on Friday (Dec 22) until 3am on Saturday (Dec 23) for PDRM fun ride programme.

18-12-2023
Auto News

No More 20% Discount For Second Penang Bridge Toll Due To Revenue Shortfall

The Second Penang Bridge would not be eligible for the 20% toll rate concession.

05-12-2024
Auto News

Both Penang Bridges Temporarily Closed for Fellowship Ride 2024 - 28 July

Both Penang bridges temporarily closed on July 28 for cycling event.

Auto News

Penang Bridge Begins To Accept Credit, Debit Cards For Toll Payments

The open payment system (OPS) at the toll plaza of the Penang Bridge has been activated, as announced by PLUS.

19-03-2024
Auto News

Penang Bridge Closure On January 20 For Repair Work

The Penang Bridge's left and middle lanes will be closed for maintenance on Saturday, January 20, from 10 p.m. to 8 a.m.

19-01-2024
Auto News

No Cracks On Penang Bridge - Penang Exco

The Penang government has denied a viral post that claimed the Penang Bridge was cracking.

30-10-2023
Auto News

Both Penang Bridges Closed Temporarily On Jan 8 For Cycling Event

Both Penang Bridges, as well as several other connecting roads, will be closed temporarily on Jan 8, 2023 (Sunday).

03-01-2023

Latest News

Auto News

KLIA Apologises After Aerotrain Breaks Down Again

KLIA’s Aerotrain stalled for 15 minutes due to a door glitch, prompting an apology and public frustration.

05-08-2025
Auto News

Amir Hamzah: PADU at the Core of RON95 Subsidy Implementation

With over 30 million individual profiles, PADU will guide MOF’s effort to roll out a more precise RON95 petrol subsidy.

Auto News

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.