Link Copiedcheck_circle
Auto News

Highway Operators Instructed To Complete Maintenance Works A Week Before Eid

Anis

Share via

bp15-sk-cms-p1.jpg According to Sinar Harian, the Ministry of Works (KKR) has requested that highway concession companies in Malaysia conclude all maintenance and repair work on federal roads no later than two weeks prior to the 2024 Hari Raya Aidilfitri celebrations.

The Works Ministry Secretary-General Datuk Seri Hasnol Zam Zam stated that the ministry has directed all highway concession companies to finish maintenance projects that are technically complex and challenging to finish within the allotted time. This means that the projects must be finished one week ahead of the holidays.


The ministry will request that any construction or maintenance projects that take longer than expected be temporarily halted. This move is important to make sure that road users can easily plan their travels for the celebrations of Hari Raya Aidilfitri. IMG_20170105_145542_HDR.jpg

In areas under their jurisdiction that are affected by maintenance or construction projects, the works ministry has also requested that local governments and highway concession companies prepare traffic plans.

The minister further stated that one-way, contra-flow, bypass, and temporary bridges are essential to guaranteeing that drivers do not experience needless traffic jams during the holidays.


These guidelines also apply to businesses building new roads, such as the Lingkaran Tengah Utama, which connects Bentong, Pahang, with Kota Bharu, Kelantan. The ministry has also directed highway operators to make sure that there are no problems, like equipment malfunctions related to Touch 'n Go, SmartTag, and RFID lanes, that could cause inconvenience to drivers using the toll plaza facilities.


pavement-works-at-KM440-Sg-Buaya-Rawang-on-the-NSE-3-1.jpg

According to Hasnol, the works ministry has requested that any system problems with toll plaza lanes be fixed as soon as possible before the holiday season. Additionally, highway concession companies have been asked to make sure that staff are stationed to provide users with immediate assistance at every toll plaza.

Tagged:

Road Maintenance
Public Works Ministry (KKR)
2024 eid
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Budget 2026: RM13bil To Strengthen Road Infrastructure Nationwide

The government will channel RM13 billion to enhance road networks, improve safety.

12-10-2025
Auto News

Scheduled Maintenance Works On Besraya Highway Until Nov 30

Besraya highway reportedly set to see maintenance works performed nightly until Nov 30, prompting lane closures in stages.

05-06-2025
Auto News

Pothole Fix Time Reduced To 12 Hours For Road Safety - Minister

The time frame for addressing pothole complaints has been cut in half, from 24 hours to just 12 hours.

20-02-2025
Auto News

RM83.5 Million Allocated For Kelantan Road Maintenance

Kelantan has been granted RM83.5 million by the federal government to maintain the state's road infrastructure.

10-04-2024
Auto News

Temporary Road Closure In Cameron Highlands Due To Landslide

The local Public Works Department has announced the temporary closure of the key access road C156 on Jalan Boh from January 19 to February 2.

22-01-2024
Auto News

RM113 Million For Road Maintenance In Flood-Affected Areas

KKR has approved an application for RM113 million to maintain roads and slopes in flood-affected states.

22-01-2024
Auto News

WISE Highway Project May Get Six-Month Extension To Strengthen Financial

KKR may grant a six-month extension to the WISE Highway developer to secure funding and complete preparations.

02-02-2026
Auto News

Govt Announces 50% Christmas Toll Discount On Dec 23-24

Private car users will enjoy a 50% toll discount nationwide on Dec 23, 24 as the government rolls out festive travel relief for Christmas.

19-12-2025

Latest News

Auto News

9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works

Toyota Malaysia hits 9,556 sales in early 2026, proving the "Multi-Pathway" strategy works. From Vios Hybrid to Vellfire HEV, see why hybrids are winning the sales war.

12-03-2026
Auto News

Chery Tiggo 7 is Now the Safest Chinese SUV on the Planet, This Is Why

The Chery Tiggo 7 makes history as the only Chinese SUV to sweep 5-star ratings from Euro NCAP, ANCAP, and ASEAN NCAP. With a record 94.68 points, see why this is 2026’s safest family SUV.

11-03-2026
Auto News

Sepang Dates Confirmed: Catch Team Porsche Malaysia in Action on 21–23 August

While the 2026 Porsche Carrera Cup Asia (PCCA) season kicks off in Shanghai this weekend, Malaysian fans are already looking ahead to the highlight of the year: the homecoming.

10-03-2026
Auto News

Iran-US War Day 10: It’s Not Just Fuel — Malaysia’s Automotive Industry Faces New Risks

While the BUDI95 subsidy program is already feeling the heat of oil prices flirting with US$120 a barrel, the true threat to our automotive sector lies beneath the surface.

09-03-2026
Auto News

Prasarana to Reveal LRT3 Launch Date This April—Here’s Everything We Know So Far

The wait for the LRT3 Shah Alam Line is entering its final stretch. After months of "will they, won't they" speculation, Prasarana has officially pointed to April 2026 as the month of truth.

05-03-2026
Auto News

EV King is Here: How Proton e.MAS 5 Dethroned Popular Petrol Cars in 60 Days

PRO-NET has announced that the Proton e.MAS 5 has officially surpassed the 5,000-unit delivery milestone in just two months.

05-03-2026
Auto News

Wolfgang Egger’s Masterpiece: Denza Z9 GT Confirmed for Malaysia Launch in Q2 2026

BYD Malaysia has officially confirmed that the Denza Z9 GT is set to launch in the local market in early 2026 (expected Q2). As the flagship luxury "shooting brake" for the brand, the Z9 GT is designed to offer a tech-forward alternative to the Porsche Panamera and BMW 5 Series Touring.

03-03-2026
Auto News

Kelana Jaya LRT trains “out of service” but line running normally - RapidRail

Rapid Rail clarified that temporary train withdrawals on the Kelana Jaya LRT line are part of standard safety procedures.

27-02-2026