Link Copiedcheck_circle
Auto News

HSR Project Receives 7 Concept Proposal, Govt Needs Two Months To Review

Kumeran Sagathevan

Share via

IMG_4509.jpg


The Transport Ministry has stated that the assessment of seven Concept Proposals from interested firms/consortiums for the Kuala Lumpur-Singapore (KL-Singapore) High Speed Rail (HSR) project is expected to take two months.

According to a statement released by the ministry on the Parliament's website, MyHSR Corporation Sdn Bhd (MyHSR Corp) is currently reviewing the Concept Proposals received. After which the government will determine which consortiums will be shortlisted for the Request for Proposal (RFP) phase.


993590.jpg


In response to Lim Lip Eng's (PH-Kepong) inquiries about potential government loan guarantees for the RM100 billion project, the Transport Ministry stated that no such guarantees would be provided as it has been divulged prior that the entire project needs to be funded through Private Fund Investment (PFI).

Furthermore, the ministry clarified that MyHSR Corp carried out the Request for Information (RFI) process, which ended on Jan 15.


LRT3-(THUMB).jpg


In response to Captain Azahari Hasan's (PN-Padang Rengas) inquiry about the cost details associated with the revival of the five Light Rail Transit 3 (LRT3) stations, the ministry stated that the cost details have yet to be finalised.

This furthermore also portrays the government emphasis to improve the project, which had previously been shelved. During the Budget 2024 presentation, Prime Minister Datuk Seri Anwar Ibrahim announced an additional RM4.7 billion allocation to restore the scope of the LRT3 project.




Tagged:

Kuala Lumpur-Singapore high-speed rail (HSR)
High Speed Train
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
Govt Finalising Key Parameters For KL-SG HSR Project - MOT

Govt Finalising Key Parameters For KL-SG HSR Project - MOT

MOT announced that the government is in the process of finalizing key parameters for the KL-SG HSR project.

18-02-2025
Auto News
Govt Open To Reviving KL-SG HSR With Private Sector Involvement - PM Anwar

Govt Open To Reviving KL-SG HSR With Private Sector Involvement - PM Anwar

The government has decided that the KL-SG HSR project can be resurrected with full private sector participation.

08-01-2025
Auto News
KL-SG HSR Project: MRCB Withdraws from MyHSR Corp

KL-SG HSR Project: MRCB Withdraws from MyHSR Corp

Berjaya led MyHSR consortium now better aligned with project target following MRCB’s exit.

Auto News
KL-SG HSR Project Will Cost 30% Less Than Projected RM110 Billion

KL-SG HSR Project Will Cost 30% Less Than Projected RM110 Billion

The KL-SG HSR project will cost roughly RM70 billion, roughly 30% lesser than the initial projected RM110 Billion.

Auto News
Why Japanese Companies Not Interested On Malaysia's Bullet Train Project

Why Japanese Companies Not Interested On Malaysia's Bullet Train Project

Japanese companies are not keen on Malaysia’s HSR project due to worries about the Malaysian government's lack of funding.

26-01-2024
Auto News
KL-Bangkok Line Possible - MyHSR Corp Head

KL-Bangkok Line Possible - MyHSR Corp Head

According to MyHSR Corporation chairman Datuk Seri Fauzi, there is a chance that the bullet train will be extended to Malaysia's northern region.

08-01-2024
Auto News
KL-Singapore High Speed Rail Project Is Back On

KL-Singapore High Speed Rail Project Is Back On

yHSR Corp, has called for concept proposals for the long-shelved HSR project.

13-07-2023
Auto News
Johor Ready To Collaborate On Potential KL-Singapore HSR Project Revival - State Exco

Johor Ready To Collaborate On Potential KL-Singapore HSR Project Revival - State Exco

The state government of Johor has declared its willingness to work with the federal government to resurrect the Kuala Lumpur-Singapore High-Speed Rail (HSR) project.

14-12-2022

Latest News

Auto News
Budi95 Subsidy Portal Goes Live For Eligibility Checks

Budi95 Subsidy Portal Goes Live For Eligibility Checks

Malaysians can now check their fuel subsidy eligibility as the Budi95 portal officially goes live.

Auto News
Malaysians With Expired Dirivng Licences Not Eligible for Budi95

Malaysians With Expired Dirivng Licences Not Eligible for Budi95

Close to 2.4 million Malaysians remain ineligible for Budi95 because their driving licences are expired, says MOT.

24-09-2025
Auto News
Updated Fuel Prices From 25 To 29 September

Updated Fuel Prices From 25 To 29 September

The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 25 to 29 September, 2025, the rates are as such.

24-09-2025
Auto News
Govt Will Tighten RON95 Subsidy Checks For E-Hailing Drivers

Govt Will Tighten RON95 Subsidy Checks For E-Hailing Drivers

Govt will cap subsidised RON95 at 300L per month and verify e-hailing drivers’ eligibility through platform records.

24-09-2025
Auto News
SEL MB: Chery’s RM2.2b Bet on Selangor Will Drive Auto Ecosystem

SEL MB: Chery’s RM2.2b Bet on Selangor Will Drive Auto Ecosystem

Selangor MB sees firsthand Chery’s robotic production lines as carmaker commits to building its high-tech hub in Malaysia.

Auto News
Slowing Car Sales May Spark Price War - Analysts

Slowing Car Sales May Spark Price War - Analysts

Analysts warn 2025’s weaker auto market may spark intense price cuts, making now a great time for buyers to grab deals.

24-09-2025
Auto News
Five Major Roads to Close for Sultan of Selangor Cup 2025

Five Major Roads to Close for Sultan of Selangor Cup 2025

Five major roads in KL will close on Sept 27 from 2 pm for the Sultan of Selangor Cup.

24-09-2025
Auto News
Budi95: Malaysians Save Up to RM228 Monthly, Govt Up to RM4 Billion

Budi95: Malaysians Save Up to RM228 Monthly, Govt Up to RM4 Billion

Budi95 will see Malaysians save up to RM228 per month, while the government trims RM2.5–4 billion off subsidy costs.