Link Copiedcheck_circle
Auto News

ART Trackless Trams Trial Run In Putrajaya Till 31 July - Free Rides Offered

Kumeran Sagathevan

Share via

ART-(3).jpg


Putrajaya Corporation (PPj), in partnership with the Ministry of Transport (MOT), is running a free trial of the Automated Rapid Transit (ART) trackless tram till July 31. If successful, the ART tram service, which uses CRRC technology from China, will begin operations permanently by end of this year.


ART-(1).jpg


Muhammad Masrizal Saad, an engineer from the PPj Engineering and Maintenance Department (Traffic and Public Transport Division), indicated that the tram will travel on two routes throughout the testing. Route 1 will run Monday through Friday, while Route 2 will operate on Saturdays and Sundays.

"Route 1 starts at the Putrajaya Sentral MRT station and runs through the government administrative areas of Precincts 2, 3, and 4. Meanwhile, Route 2 begins at Putrajaya Sentral MRT Station and continues to IOI City Mall," he stated at a recent media event.


ART-(4).jpg


Masrizal further stated that the electric tram can handle up to 307 passengers at once, and that rides are free during the testing period. However, passengers must scan the QR codes provided at the pick-up points.



Source: BERNAMA

Tagged:

autonomous rapid transit (ART)
ART Putrajaya
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

Kuching Urban Transportation System Anticipated To Commence In 2028

Full operation of the Kuching Urban Transport System (KUTS) project is expected to commence in 2028.

21-05-2025
Auto News

Faizal: Johor ART Necessary To Minimise RTS Station Congestion

The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.

Auto News

Johor State Govt Mulls ART System Alongside RTS Link

The Johor state government proposes the implementation of the ART system to combat congestion alongside the RTS Link.

Auto News

Sarawak Set To Become Asia's First Hydrogen-Powered Economy!

Sarawak to begin large-scale commercial production of green hydrogen by 2027 to promote renewable energy and minimise the region's carbon footprint.

Auto News

Sarawak State Govt. To Endorse Hydrogen-Powered ART Vehicles Including Buses

Sarawak state government has announced its plans to promote hydrogen-powered public vehicles among locals.

23-03-2023

Latest News

Auto News

RM20 Million Allocated to Upgrade Federal Highway Motorcycle Lanes – KKR

A total of RM20 million will be allocated to upgrade the motorcycle lanes on the Federal Highway, the Works Ministry says.

08-08-2025
Auto News

Over 39,000 Road Issues Flagged On MyJalan App Since Launch

MyJalan app logs over 39,000 complaints, but most fall outside federal jurisdiction, says Deputy Works Minister.

07-08-2025
Auto News

PLUS Eyes MLFF ANPR Toll Trials This Month - JustGo Digital App

PLUS will begin trials for automatic number plate recognition (ALPR) toll system with its JustGo Digital App, part of proposed MLFF system, across nine toll plazas this month.

Auto News

Kelana Jaya Line Signalling Works Delayed, Phase 2 Work Starts Sept 6

Kelana Jaya Line Phase 2 and 3 signalling works will now begin on Sept 6, with select stations opening later on affected dates.

Auto News

UMW Toyota Jul y2025 Sales Total At 8,877 Units

UMW Toyota sees its sales for July 2025 total at 8,877 units, YTD total now up to 53,163 units.

07-08-2025
Auto News

RM25 Million Allocated to Light Up Dark Federal Roads – KKR

The Works Ministry has allocated RM25 million to light up dark federal roads to prevent future accidents.

07-08-2025
Auto News

Ops Pengarah: 252 Fined, One With Road Tax Expired For 2 Years

JPJ’s Ops Pengarah nabs dozens driving without licence, including one with road tax expired for two years.

07-08-2025
Auto News

Aerotrain Disruption A Minor Glitch, ETS3 Project On Track - Loke

KLIA’s Aerotrain glitch was a minor software bug, not a breakdown, while ETS3 to Johor Bahru is on track, says Transport Minister.

07-08-2025