Link Copiedcheck_circle
Auto News

Chery Malaysia Launches One-Year Anniversary Promo Campaign

Mukhlis Azman

Share via

thumb-CheryMalaysia-OneYearPromo.jpg

Chery Malaysia celebrates its first anniversary by offering free service packages and auto-side steps for the Tiggo 8 Pro.

It’s been a year since Chery Malaysia re-established itself in our market, marked by the launch of both the Omoda 5 and Tiggo 8 Pro in July last year. To celebrate the first anniversary of its re-establishment this month, Chery Malaysia is offering goodies in the form of complimentary service packages and free gifts.

Chery-OMODA5-H-EXT-7.jpgChery-Omoda-E5-Exterior-5.JPG

Starting now until July 31, buyers of new Chery cars will enjoy a complimentary 2-year free service package that covers both parts and labour charges. Note that this free service package is only applicable to  the Omoda 5, Tiggo 8 Pro, and Omoda E5, with the sole exception being the newly-launched Tiggo 7 Pro.

This free service package will be offered on top of the standard 7-year or 150,000 KM vehicle warranty and 5-year free labour service offered to all Chery models.

Chery-Tiggo8Pro-Ext-2.jpgChery-Tiggo8Pro-Ext-14.jpg

Besides the complimentary service package, Chery Malaysia is also offering free accessories in the form of the automated side steps for the Tiggo 8 Pro model. Worth RM2,999, these side steps can be engaged automatically when the car doors are opened, allowing easier access to the tall-riding Tiggo 8 Pro SUV.

It is also important to note that this promotional campaign is essentially a continuation of the marque’s previous campaign, which ended on June 30. With this campaign now being extended until the end of July this year, buyers of new Chery cars still have a chance to grab these freebies.


Gallery

Tagged:

Chery Tiggo 8 Pro
Chery Malaysia
Chery Omoda 5
Chery Omoda E5
Chery Malaysia One Year Anniversary Promo
Share This Article

Written By

Mukhlis Azman

An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman

Share via

Related News

Auto News

04-04-2025
Tech

20-12-2024
Auto News

18-09-2024
Review

15-07-2024
Auto News

03-04-2024
Auto News

21-09-2023
Videos
Chery Tiggo 8 Pro | A Left Field D-Segment Contender

Chery Tiggo 8 Pro | A Left Field D-Segment Contender

Chery Tiggo 8 Pro | A Left Field D-Segment Contender

06-09-2023
Auto News

30-08-2023

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.