Link Copiedcheck_circle
Auto News

Selangor Rail Line To Connect With ECRL For Better Connectivity

Anis

Share via

uses-artificial-intelligence-(AI)-to-detect-paint-flaws-on-the-cars-it-assembles-at-its-facilities-in-the-United-States.-(38).png
Photo: Selangor Journal.
The Selangor government intends to improve and expand public transportation connectivity by connecting the proposed Selangor Rail Line with the East Coast Rail Link (ECRL) alignment sometime after 2026, Selangor Journal has reported.

According to Menteri Besar Dato' Seri Amirudin Shari, this is on top of the ECRL Gombak station, which will connect to the current light-rail transit (LRT) network and function as an integrated terminal after the project is completed.

“The Gombak station is already an integrated terminal, allowing connectivity with the current LRT alignment. 

“In the future, Selangor plans to introduce what we call the Selangor Rail Line. Our plan includes at least two stations, one in Kuala Selangor and possibly one in Klang, that will connect with the existing ECRL alignment. 

uses-artificial-intelligence-(AI)-to-detect-paint-flaws-on-the-cars-it-assembles-at-its-facilities-in-the-United-States.-(37).png
Photo: Selangor Journal.
“This will link the entire rail network after 2026,” he said during a press conference after the ECRL Gombak Tunnel breakthrough ceremony yesterday..

Amirudin expressed optimism that the Selangor Rail Line will be realized, citing its significant potential to drive economic growth along the west coast.

Excavation for the Gombak tunnel began in June of last year, with a breakthrough scheduled for the fourth quarter of this year. All civil works for the Gombak Tunnel are expected to be completed by March 2025.

Tagged:

Selangor rail
East Coast Rail Link (ECRL)
Selangor MB
public transportation sector
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

The 13th Malaysia Plan focuses on better connectivity through buses, trains, roads, and smarter planning.

Auto News
ECRL Extension from Kota Bharu to Pasir Mas Under Review

ECRL Extension from Kota Bharu to Pasir Mas Under Review

Kelantan is pushing for the ECRL to extend to Rantau Panjang, eyeing cross-border rail links with Thailand.

23-07-2025
Auto News
ECRL Set To Receive First Two EMU Trains, E-Locos By Year-End

ECRL Set To Receive First Two EMU Trains, E-Locos By Year-End

ECRL is expected to receive its first two EMU trains and two E-Loco by the end of this year.

16-07-2025
Auto News
ECRL Breakthrough: Genting Tunnel Becomes SEA’s Longest Rail Tunnel

ECRL Breakthrough: Genting Tunnel Becomes SEA’s Longest Rail Tunnel

The 16.39KM Genting Tunnel is now Southeast Asia’s longest rail tunnel, marking a major leap for ECRL.

Auto News
Kuantan-Bound KL-Karak Lanes Diverted For ECRL Work Until Aug 31

Kuantan-Bound KL-Karak Lanes Diverted For ECRL Work Until Aug 31

Kuantan-bound lanes (KM25.75–KM26.39) are being diverted for ECRL works until Aug 31.

10-07-2025
Auto News
ECRL Project 85% Completed

ECRL Project 85% Completed

The ECRL is 85% complete and on track to start operations by early 2027, says Chief Secretary.

09-07-2025
Auto News
RM300K Lost To Cable Thefts At Terengganu ECRL Sites

RM300K Lost To Cable Thefts At Terengganu ECRL Sites

Police recorded 22 theft-related cases at Terengganu ECRL sites, costing an estimated RM300,000 in losses.

25-06-2025
Auto News
ECRL Could Extend to Sungai Golok After KTMB Revival – MRL CEO

ECRL Could Extend to Sungai Golok After KTMB Revival – MRL CEO

MRL is not discontinuing the proposal to extend the ECRL line from its current final station in Kota Bharu to Sungai Golok.

24-06-2025

Latest News

Auto News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.

Auto News
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?

02-08-2025
Auto News
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.

01-08-2025
Auto News
Govt Looking To Revive MEX II Highway With New Completion Plan

Govt Looking To Revive MEX II Highway With New Completion Plan

The government is working with bondholders to restart the long-delayed MEX II Highway.

01-08-2025
Auto News
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.

01-08-2025
Auto News
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.

01-08-2025
Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.