Link Copiedcheck_circle
Auto News

12 New Trains For KTM Komuter Utara, First Delivery In 22 Months

Anis

Share via

download-(7).jpg
Transport Minister Anthony Loke announced that the construction of 12 new electric train sets (ETS) for the Komuter Utara service will commence immediately. The delivery of the 12 ETS, according to Loke, will be carried out in phases over a period of 36 months.

As a medium-term measure, the government had issued a Letter of Acceptance to CRRC Rolling Stock Centre (Malaysia) Sdn Bhd through an open tender for the procurement of 12 Three Car Set (3CS) trains on March 20, he says. Untitled-design---2025-03-25T103713.933.png
According to a Bernama report, the minister stated that the project's initial train is scheduled for delivery within 22 months. The project, with a total expenditure of RM283 million, encompasses the design, construction, delivery, testing, and commissioning of the trains. Upon completion, the trains will be transferred to Keretapi Tanah Melayu Berhad (KTM) for full operational use.

“The procurement of these 12 new train sets is expected to improve the frequency of KTM Komuter Utara services, reducing passenger waiting times and providing a more comfortable, modern and efficient travel experience,” he said. Untitled-design---2025-03-25T103844.181.png


The Ministry of Transport, through KTM, has been upgrading services in the northern sector since 2023. According to Loke, these upgrades include redeploying train carriages from Subang Skypark to the north to increase the frequency of KTM Komuter Utara trains, and expanding KTM Komuter services from Butterworth-Padang Rengas to Ipoh.

The Ministry's initiatives proved to be effective, as evidenced by a 29% increase in the average daily ridership of KTM Komuter Utara services between 2023 and 2024, rising from 12,668 to 16,363 passengers.

Tagged:

Keretapi Tanah Melayu Berhad (KTMB)
KTM Komuter Utara
Minister of Transport YB Anthony Loke
Ministry Of Transport (MOT)
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.

Auto News

KTMB Adds 11,340 Extra ETS Seats for Aug - Sept Holidays

KTMB is adding 630 ETS seats daily from Aug 28 to Sept 21, totalling 11,340 extra seats across popular holiday period.

Auto News

KTMB Focuses On Service Over Profit - Loke

KTMB remains unprofitable due to subsidised fares, but profit isn’t the priority for now, says Transport Minister.

16-07-2025
Auto News

Loke: No ETS For East Coast

Transport Minister Loke confirms ETS will not be extended to the east coast due to single-track, unelectrified rail lines.

Auto News

KTMB Launches KITS Style SuperApp

KTMB has launched the KITS Style SuperApp, a revamped platform to establish a more efficient transport system.

14-07-2025
Auto News

KTM Shuttle Tebrau Ends 2027, Replaced By RTS Link

KTM Berhad’s Shuttle Tebrau service ends in 2027 and will be replaced by the RTS link.

25-06-2025
Auto News

KTMB Train Services Face Major Delays Due To Cable Theft

Recent cable thefts targeting KTMB have disrupted three northern routes, causing delays exceeding an hour yesterday.

10-06-2025
Auto News

Two Of 10 New ETS Train Sets Delivered To KTMB

Two of 10 new ETS sets, valued at RM400 million, have already been delivered to KTMB.

06-06-2025

Latest News

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.

Auto News

30 Kindergarten Kids, Teachers Involved In Bus Crash; JPJ To Launch Audit

JPJ will audit the bus operator after a crash near UPM injured kindergarten kids and a teacher.

04-08-2025