Link Copiedcheck_circle
Auto News

KTMB Provides Extra KTM ETS Trains For Raya

Anis

Share via

KITS-KTMB-ETS-Train-Ticket-Official-Website-e1655367565594.jpg
Keretapi Tanah Melayu Berhad (KTMB) will be adding four Electric Train Service (ETS) trains to its schedule between March 28 and April 6 in order to meet the increased travel demand expected for the Hari Raya Aidilfitri festival.

Two of the additional trains will run on the KL Sentral-Padang Besar-KL Sentral route, and the other two will operate on the KL Sentral-Butterworth-KL Sentral line, according to a statement released by KTMB.

“This move is to meet the high demand since existing tickets for the ETS have been sold out,” it said. The extra ETS trains will provide 1,260 seats per day, including business class seats, during their operating time, for a total of 12,600 seats to accommodate the increasing passenger demand. The extra ETS tickets will be available for purchase today, March 4, starting at 10 am.

Tickets can be purchased via cashless payment via the KTM Mobile (KITS) app, the official KTMB website (www.ktmb.com.my), or KTMB kiosks. For further information, the public can call the KTMB Call Centre at 03-9779 1200 or visit the KTMB's official social media pages.


3-Class-93-at-Butterworth-Platform-2.jpg

Tagged:

Keretapi Tanah Melayu Berhad (KTMB)
KTMB Ticket
KTM ETS Express Service
KTMB EXtra Raya Trains
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.

Auto News

KTMB Adds 11,340 Extra ETS Seats for Aug - Sept Holidays

KTMB is adding 630 ETS seats daily from Aug 28 to Sept 21, totalling 11,340 extra seats across popular holiday period.

Auto News

KTMB Focuses On Service Over Profit - Loke

KTMB remains unprofitable due to subsidised fares, but profit isn’t the priority for now, says Transport Minister.

16-07-2025
Auto News

Loke: No ETS For East Coast

Transport Minister Loke confirms ETS will not be extended to the east coast due to single-track, unelectrified rail lines.

Auto News

KTMB Launches KITS Style SuperApp

KTMB has launched the KITS Style SuperApp, a revamped platform to establish a more efficient transport system.

14-07-2025
Auto News

KTM Shuttle Tebrau Ends 2027, Replaced By RTS Link

KTM Berhad’s Shuttle Tebrau service ends in 2027 and will be replaced by the RTS link.

25-06-2025
Auto News

KTMB Train Services Face Major Delays Due To Cable Theft

Recent cable thefts targeting KTMB have disrupted three northern routes, causing delays exceeding an hour yesterday.

10-06-2025
Auto News

Two Of 10 New ETS Train Sets Delivered To KTMB

Two of 10 new ETS sets, valued at RM400 million, have already been delivered to KTMB.

06-06-2025

Latest News

Auto News

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.