Link Copiedcheck_circle
Auto News

New Juru-Sungai Dua Highway Project - Q4 2025 Start, 2030 Completion

Kumeran Sagathevan

Share via

481900270_1045347884281966_8962089833125402567_n.jpg


The Juru-Sungai Dua Elevated Highway construction is set to begin in the final quarter (Q4) of this year (2025), and is expected to be fully completed by 2030.

Once complete this highway aims to address the heavy traffic congestion issue between the Juru and Sungai Dua toll plazas - key areas targeted are Penang Bridge, Prai, Permatang Pauh and Sungai Dua.

The highways which would span 17.4 KM long, with 9 KM of elevated roadway will be developed in eight phases. To improve traffic flow, it will feature intersections without traffic lights and two elevated U-turns.


481340131_1184486906380130_6110609291251030492_n.jpg


Several major interchanges, including the Juru Utara (Autocity) interchange, the Penang Bridge interchange and a new flyover at Jalan Tun Hussein Onn, will also be upgraded as part of the project.

State Infrastructure Committee chairman Zairil Khir Johari confirmed that the project has been carefully planned together with the Works Ministry, the Malaysian Highway Authority and PLUS.

Construction is scheduled to officially start in late 2025 and will take approximately three years to complete. While the final cost is still being determined, it is expected to be lower than the RM3 billion originally estimated.

481903738_1045347817615306_7259334006769051306_n.jpg

The project was initially estimated to cost only RM1.8 billion when first announced by Deputy Works Minister, Datuk Seri Ahmad Maslan.

The new highway will implement a system similar to the one in Ipoh, where local traffic is separated from through traffic to reduce congestion. A Traffic Management Plan will also be put in place to minimize disruptions during construction.

This project is a part of broader infrastructure upgrades for Penang, which also include the Penang Light Rail Transit (LRT), the expansion of Penang International Airport and the development of Batu Kawan Industrial Park 3. 


Source: NSTP

Tagged:

Juru–Sungai Dua Elevated Highway
Penang State Infrastructure Committee chairman Zairil Khir Johari
Deputy Works Minister, Datuk Seri Ahmad Maslan
Penang Light Rail Transit (LRT)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

Penang On Track And Well-Prepared For Large Scale Projects

Penang will implement extensive traffic management measures to mitigate disruptions from upcoming large-scale projects.

04-06-2025
Auto News

Maslan: 15 KM Juru-Sungai Dua Elevated Highway To Cost RM1.8B

The Juru-Sungai Dua Elevated Highway is set to cost RM1.8B, project will be undertaken by PLUS on a Public-Private Partnership basis.

Auto News

Penang Defends Mega Projects As Key To Tackling Traffic Woes

Penang’s transport councillor says flyovers, underpasses and the LRT are essential to ease congestion.

04-09-2025
Auto News

PLUS Eyes MLFF ANPR Toll Trials Using JustGo Digital App

PLUS will begin trials for automatic number plate recognition (ALPR) toll system with its JustGo Digital App, part of proposed MLFF system, across nine toll plazas this month.

Latest News

Auto News

JPJ: 2.3 Million Malaysians Have Expired Driving Licences

JPJ claims there are over 2.3 million Malaysians with driving licences that are expired beyond three-year renewal window.

Auto News

Petrol Cards And Civil Servant Perks On Offer By Jetour Malaysia This Month

Up to RM1 million worth of free petrol cards plus special perks for civil servants on offer from Jetour Malaysia this month.

20-09-2025
Auto News

TQ Wuling Bingo EV CKD Production Set to Begin in Dec 2025

The new SGMW-Tan Chong joint venture EV plant will start its local assembly efforts this Dec with the TQ Wuling Bingo.

19-09-2025
Auto News

MyKad Checks Urged Ahead of Fuel Price Drop

Home minister urges Malaysians to fix faulty MyKad chips early to enjoy the upcoming targeted fuel subsidy.

19-09-2025
Auto News

GAC Emkoo Awarded 5-star ASEAN NCAP Rating

Upcoming GAC Emkoo C-SUV earns coveted 5-star rating form ASEAN NCAP crash-testing regime.

19-09-2025
Auto News

KLCC Roads Closed Saturday For Sarong Music Run

Expect road closures and traffic delays around KLCC tomorrow for the Malaysia Sarong Music Run 2025.

19-09-2025
Auto News

Sand, Log Trucks Dominate Kelantan Roads - JPJ

Sand and log trucks make up most heavy vehicle traffic in Kelantan, with fewer overloaded cases.

19-09-2025
Auto News

Customs Seizes 32 Imported Cars Worth RM8.45 Million

Ops Purple uncovered vehicles stored beyond the legal limit, with unpaid duties and taxes totalling RM5.38 million.

19-09-2025