Link Copiedcheck_circle
Auto News

Penang On Track And Well-Prepared For Large Scale Projects

Anis

Share via

3002819.jpeg
Penang Chief Minister Chow Kon Yeow revealed today that the state government plans to enact comprehensive traffic management solutions to lessen disturbances from upcoming large-scale construction.

Drawing on insights gained from a past visit to Gamuda in Kuala Lumpur, particularly their traffic management strategies during LRT construction, the government is well prepared, he says.

While acknowledging that projects like the Penang South Islands (PSI), Mutiara Line LRT, and the Juru–Sungai Dua Elevated Highway will likely lead to temporary traffic congestion, Chow affirmed that such disruptions are an expected element of development.
SRS_Penang-Island_img1.jpg

“I believe all contractors involved in these major projects in Penang will take traffic dispersal into account. The key consideration is to maintain the original number of lanes during construction

“Even if parts of the road need to be closed to vehicles, additional space must be created to ensure that the same number of lanes remains available,” he says, adding that proper state management could ease traffic and improve travel.

Chow also confirmed the Juru-Sungai Dua Elevated Highway construction would begin by year's end, and the Penang LRT project, starting in Q3, would be completed in six to seven years.

Untitled6-3-(2).jpg

In addition, significant progress has also been made on the Penang South Islands (PSI) project, with 60.71ha of land reclaimed over the last 18 months. Looking ahead, the state administration anticipates positive announcements from the federal government regarding incentives for industrial property buyers.

During the October 2024 budget announcement, Prime Minister Anwar Ibrahim announced several key Penang projects, including the Juru–Sungai Dua Elevated Highway, enhancements to Penang International Airport, and the new Batu Kawan Industrial Park 3.
juru-sungai-dua-elevated-highway.jpeg
Photo: Penang Property Talk.
Notably, the 29.5km Mutiara Line LRT, featuring 21 stops, aims to significantly improve transportation links between Penang island and the mainland, addressing both general accessibility and road congestion issues.


Tagged:

Penang traffic management
Penang South Islands (PSI)
Mutiara Line LRT
Juru–Sungai Dua Elevated Highway
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
Penang Expects 2.2M Vehicles This Christmas, School Holidays

Penang Expects 2.2M Vehicles This Christmas, School Holidays

More than 2.2 million vehicles are expected to enter Penang during the Christmas season and school holidays.

24-12-2025
Auto News
Penang Traffic Woes Persist Despite PTMP - Penang Gerakan

Penang Traffic Woes Persist Despite PTMP - Penang Gerakan

Penang Gerakan urges an independent review of the PTMP, saying poor planning has worsened traffic instead of easing it.

29-09-2025
Auto News
Flyovers Won’t Fix Penang’s Traffic - Analysts

Flyovers Won’t Fix Penang’s Traffic - Analysts

Analysts warn Penang’s congestion can’t be solved by endless flyovers, urging better management.

08-09-2025
Auto News
Penang LRT: Major Road Diversions in Bayan Lepas from Jan 2026

Penang LRT: Major Road Diversions in Bayan Lepas from Jan 2026

Traffic along Jalan Sultan Azlan Shah will be cut from three lanes to two for Penang LRT construction, with works stretching until 2028.

Auto News
Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

The 13th Malaysia Plan focuses on better connectivity through buses, trains, roads, and smarter planning.

Auto News
Mutiara Line LRT: Penang’s RM8.3 Billion Connectivity Investment

Mutiara Line LRT: Penang’s RM8.3 Billion Connectivity Investment

Penang’s RM8.31 billion Mutiara Line LRT project begins with the first phase contract signing.

Auto News
Penang Mutiara Line LRT Won’t Be Like Kelana Jaya LRT

Penang Mutiara Line LRT Won’t Be Like Kelana Jaya LRT

Penang’s Mutiara Line LRT would run only 2-car train when it begins and would scale up if required.

Auto News
Penang Mutiara Line LRT Project Set to Complete in 2030

Penang Mutiara Line LRT Project Set to Complete in 2030

The cabinet has approved the construction of the Penang Mutiara Line LRT Project, with completion expected by 2023.

Latest News

Auto News
The RM5,000 Raya Flex: Why Malaysians are Risking a Monthly Salary to Rent an Alphard

The RM5,000 Raya Flex: Why Malaysians are Risking a Monthly Salary to Rent an Alphard

Is renting an Alphard for RM5,000 a waste or a genius move? We break down the 'Raya Flex' cost, from RM10k insurance premiums to the 'Executive Lounge' comfort that saves your back on an 18-hour East Coast jam.

27-03-2026
Auto News
Safe Passage at Hormuz: Why Malaysia’s Special Deal with Iran Won't Lower Your Petrol Price

Safe Passage at Hormuz: Why Malaysia’s Special Deal with Iran Won't Lower Your Petrol Price

PM Anwar secured safe passage for Malaysian ships, so why is RON95 hitting RM3.87/L? We decode the 400% insurance surge and the new 200L BUDI95 quota.

27-03-2026
Auto News
Fuel Subsidy Update: Your 300L Monthly Quota Could Drop to 200L This April

Fuel Subsidy Update: Your 300L Monthly Quota Could Drop to 200L This April

If you rely on subsidised RON95 petrol to get to work, take note: a major change is coming to your monthly fuel budget.

26-03-2026
Auto News
Fuel Price Shock: Diesel Spikes to RM5.52, Unsubsidised RON95 Jumps 60 Sen

Fuel Price Shock: Diesel Spikes to RM5.52, Unsubsidised RON95 Jumps 60 Sen

Massive 80-sen spike for Diesel (RM5.52) and 60-sen jump for unsubsidised RON95 (RM3.87). Learn how the Budi Madani RM300 aid and BUDI95 quota protect Malaysian drivers this week.

26-03-2026
Auto News
Strait of Hormuz to Malaysia: Why We’re Paying for a War 6,000km Away

Strait of Hormuz to Malaysia: Why We’re Paying for a War 6,000km Away

Why is RON97 at RM4.55/L? We decode the Strait of Hormuz conflict, the May 2026 subsidy deadline, and why Malaysia imports oil despite being a producer.

19-03-2026
Auto News
From 82 Minutes to 8: How the Mutiara Line is Giving Penangites Their Time Back

From 82 Minutes to 8: How the Mutiara Line is Giving Penangites Their Time Back

Is the 80-minute Penang Bridge crawl finally ending? The Mutiara Line LRT links Butterworth to Komtar in just 8 minutes. Get the latest 2026 project updates, station lists, and more.

17-03-2026
Auto News
The 2026 Proton X90 Buyer’s Warning: 5 Critical Safety Features You Are No Longer Getting

The 2026 Proton X90 Buyer’s Warning: 5 Critical Safety Features You Are No Longer Getting

ASEAN NCAP revokes Proton X90’s 5-star rating. The 2026 facelift is downgraded to 1-star after stripping critical ADAS features. Is your family safe? Get the full safety specs here.

16-03-2026
Auto News
9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works

9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works

Toyota Malaysia hits 9,556 sales in early 2026, proving the "Multi-Pathway" strategy works. From Vios Hybrid to Vellfire HEV, see why hybrids are winning the sales war.

12-03-2026