Link Copiedcheck_circle
Auto News

JPJ Merges Motorcycle and Car Theory Modules

Kumeran Sagathevan

Share via

491395408_1075427811280294_7231335314145000488_n.jpg


During the recent celebration of the Road Transport Department's (JPJ) 77th Anniversary, Minister of Transport YB Anthony Loke, announced a significant enhancement to the driver’s licencing process in Malaysia.

Currently, all candidates applying for a driving licence are required to complete and pass the Kurikulum Pendidikan Pemandu (KPP) Module 01. This module covers essential areas such as road regulations, safe driving practices, road safety, vehicle management, and common traffic offences.


mytest_kpp01.jpg


Under the present system, the KPP01 theory module is conducted separately for motorcycle and car licence classes. This means candidates who already hold a motorcycle licence and wish to apply for a car licence must retake the KPP01 module, even though the content overlaps in several areas.

To streamline the process, Loke highlighted that this requirement will soon be abolished. As part of the policy improvement first introduced in 2023, both motorcycle and car KPP01 modules will now be consolidated into a single, integrated theory module starting Aug, 2025.


491810600_1075497417940000_4015376595107619319_n.jpg


The introduction of this integrated module aims to strengthen the emphasis on safe driving practices, while also reducing duplication in learning materials. Candidates pursuing both classes of vehicle licences will only need to attend one theory class under this improved structure.

In addition to improving the learning experience, this change is expected to help reduce the overall cost of obtaining a driving licence. The integrated approach will also ensure candidates receive more focused and effective instruction on key safety elements applicable to both motorcycles and cars.

The new integrated module is expected to be implemented by the end of this year. JPJ will release further details on the conditions, implementation methods, and operational procedures in due course.



Tagged:

Kurikulum Pendidikan Pemandu (KPP) Module 01
Kurikulum Pendidikan Pemandu Module 01 (KPP01)
KPP01 Module
Minister of Transport YB Anthony Loke
Road Transport Department (JPJ)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
LRT3 Hits 99% Completion - Loke

LRT3 Hits 99% Completion - Loke

LRT3, which will connect Bandar Utama to Johan Setia, is 99% complete and on track for launch, says Transport Minister.

30-07-2025
Auto News
Bas.My Launched with Focus on Accessibility and Affordability

Bas.My Launched with Focus on Accessibility and Affordability

Loke: 48 brand-new buses and 13 routes, Bas.My is setting a new standards for stage buses in Kedah.

Auto News
Turun Anwar Rally: Loke Urges Train Use, PDRM May Divert 16 Roads

Turun Anwar Rally: Loke Urges Train Use, PDRM May Divert 16 Roads

Transport Minister and PDRM urges public to plan ahead and use public transportation to ease congestion caused by Turun Anwar rally.

Auto News
MRT3 Gets MOT Approval, Completion Set for 2026

MRT3 Gets MOT Approval, Completion Set for 2026

The 51.6 KM MRT Circle Line is officially approved, full rollout expected by end of 2026.

Auto News
JPJ Plans Major Reform For Kejara System

JPJ Plans Major Reform For Kejara System

JPJ is wrapping up its review of long-awaited improvements for the Kejara system.

Auto News
Loke: No ETS For East Coast

Loke: No ETS For East Coast

Transport Minister Loke confirms ETS will not be extended to the east coast due to single-track, unelectrified rail lines.

Auto News
Prasarana Adds 310 Diesel Buses While Waiting for Electric Fleet

Prasarana Adds 310 Diesel Buses While Waiting for Electric Fleet

Prasarana updates its fleet with 310 new diesel buses to manage demand while awaiting the rollout of electric buses.

Auto News
ECRL Breakthrough: Genting Tunnel Becomes SEA’s Longest Rail Tunnel

ECRL Breakthrough: Genting Tunnel Becomes SEA’s Longest Rail Tunnel

The 16.39KM Genting Tunnel is now Southeast Asia’s longest rail tunnel, marking a major leap for ECRL.

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.