Link Copiedcheck_circle
Auto News

KLIA Aerotrain Logs 19 Glitches, Faces RM190k Monthly Fine

Anis

Share via

Untitled-design---2025-10-14T145550.590.png
The Kuala Lumpur International Airport (KLIA) Aerotrain system has experienced 19 minor glitches since returning to service in July, but operations have now stabilised, said Deputy Transport Minister Datuk Hasbi Habibollah.

Speaking in the Dewan Rakyat, Hasbi said the Aerotrain project, completed on June 30 and relaunched on July 1 is currently under a two-year defect liability period. 

“We want to ensure 100% operational efficiency. If they fail to meet this, a penalty of up to RM190,000 per month will be imposed. They must make sure the system is always tip-top,” he said. 297480.jpg
Hasbi explained that the original equipment manufacturer (OEM), Alstom, is responsible for maintaining the train’s performance with 100% availability required when operating a single train, and 99.5% when both are running.

He was responding to Khairil Nizam Khirudin (PN–Jerantut), who questioned the government on recurring breakdowns and the steps being taken to ensure the system’s reliability.

According to Hasbi, most of the 19 disruptions reported between July and September were due to signalling issues, while a few were caused by passengers trying to manually open the train doors.  PTJ_AEROTRAIN_1.jpeg
“Repairs were carried out immediately, with officers and technicians stationed on-site to ensure that all issues are rectified promptly,” he added.

Since resuming operations, the Aerotrain has carried more than 5.3 million passengers and covered nearly 40,000 kilometres. 

Operational availability stood at 99.19% as of October 8, and Hasbi said stability continues to improve with the system running at full efficiency in recent weeks.

KLIA-Aerotrain-breakdown-Caricarz-(T)-full_normal.jpg
Malaysia Airports Holdings Bhd (MAHB) is working closely with Alstom to ensure smooth operations and quick technical responses when problems arise.

“Currently, train performance is at 100%, and MAHB will continue collaborating with the manufacturer to sustain maximum operational standards,” Hasbi concluded.


Tagged:

KLIA Aerotrain breakdown
KLIA Aerotrain resume operation
KLIA Aerotrain scheduled maintenance
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

KLIA Aerotrain Begins Trial Runs, Nightly Shutdown Remains

Malaysia Airports will start trial operations for the KLIA Aerotrain as part of a month-long plan to fix reliability issues.

17-12-2025
Auto News

KLIA Aerotrain Problems Go Beyond Simple Technical Glitches - Analyst

Experts say aerotrain issues run far deeper than simple glitches as KLIA runs a month-long overhaul to address underlying problems.

01-12-2025
Auto News

Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.

17-11-2025
Auto News

KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance

KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.

10-11-2025
Auto News

Loke Orders MAHB To Keep Shuttle Bus Amid KLIA Aerotrain Woes

Transport minister says shuttle buses must stay as investigations continue into repeated aerotrain breakdowns.

31-10-2025
Auto News

Govt Won’t Suspend KLIA Aerotrain, MAHB Facing Action - Loke

Loke says the government won’t halt the KLIA Aerotrain, but MAHB is facing action.

30-10-2025
Auto News

MACC Open To Probing KLIA Aerotrain

MACC says it will investigate the KLIA Aerotrain project if corruption is found, following months of repeated breakdowns.

29-10-2025
Auto News

KLIA Aerotrain Breaks Down Again; MOT, APAD Step In

KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.

28-10-2025

Latest News

Auto News

Ferrari’s 16-Year Marketing Chief Stepped Down—But Was It Really His Choice?

Ferrari’s 16-year marketing lead has stepped down following the controversial Luce EV launch. Was this a planned exit or a high-profile design disaster casualty?

26-06-2026
Auto News

Foreigners Are Using Local MyKads to Buy Vehicles—And Leaving Locals With a Legal Nightmare

Think renting your car to a foreigner is easy money? Think again. JPJ's Ops PeWA is seizing vehicles and hauling local owners to court. Learn the risks.

26-06-2026
Auto News

From 80 Sen To RM4.30: A Simple Breakdown Of The New LRT3 Fares

Planning to ride the new LRT3? Get a simple breakdown of the Shah Alam Line fares.

25-06-2026
Auto News

BUDI Diesel Explained: 200L Quota, No Deadlines, And The New 'Approved Person' Rule You Need To Know

Confused by the new RM2.10 diesel subsidy? Our ultimate guide covers quotas, how to claim your extra 100L, and the latest 'Approved Person' rules.

25-06-2026
Auto News

RM500 Saman & Jail For Racing? 5 Massive Traffic Law Changes Coming To Malaysia

Transport Minister Anthony Loke tables the Road Transport (Amendment) Bill 2026. Here are 5 massive proposed traffic law changes coming to Malaysia.

24-06-2026
Auto News

Government Pouring RM25.2 Million To Light Up 32 Dangerous Stretches So We Don't Have To Drive Blind At Night

The Ministry of Works approved RM25.24 mil to install 3,000 solar LED streetlights at 32 hazardous highway blackspots by November 2026. Is your route on the list?

24-06-2026
Auto News

"Not Our Priority" — Minister Reveals The 4 Major Road Crimes JPJ Is Hunting Instead Of Sunshades

Transport Minister Anthony Loke clarifies that JPJ will not target motorists using removable car window sunshades, choosing instead to focus enforcement priorities on illegal racing, mat rempit, drunk driving, and reckless driving.

22-06-2026
Auto News

M'sia Is Moving Toward Barrier-Free Tolls, But Gov Just Dropped One Non-Negotiable Rule

Works Minister Datuk Seri Alexander Nanta Linggi reveals that while Malaysia's barrier-free MLFF toll system negotiations are advanced, the government has set a strict, non-negotiable condition: road users must not pay higher toll fares.

22-06-2026