Link Copiedcheck_circle
Auto News

Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours

Anis

Share via

ETS_Gemas_18.jpg Gemas-Johor Bahru electrified double-track rail line is officially up and running. This new line completes the north-south ETS network, meaning you can now travel from the top to the bottom of Peninsular Malaysia faster and more comfortably than ever.

The project, built by SIPP Rail and YTL Construction (SIPP-YTL), covers 11 stations along the route including Segamat, Genuang, Labis, Bekok, Paloh, Kluang, Mengkibol, Renggam, Layang-Layang, Kulai, and JB Sentral. 

ETS_Gemas_9.jpgETS_Gemas_11.jpgETS_Gemas_10.jpg
The operational launch at Kempas Baru Station was officiated by the Regent of Johor, Tunku Mahkota Ismail Sultan Ibrahim, in the presence of Prime Minister Datuk Seri Anwar Ibrahim, Transport Minister Anthony Loke Siew Fook, and Johor Menteri Besar Datuk Onn Hafiz Ghazi.

"Travel between KL Sentral and JB Sentral now takes just 4 hours and 20 minutes, down from seven hours, with trains cruising at up to 140 km/h," Anthony Loke said, noting that collaboration between the ministry, RAC, KTMB, and SIPP-YTL was key to making this happen.

ETS_Gemas_4.jpg
Prime Minister Anwar praised the line as a world-class infrastructure project that reflects the government’s commitment under the Madani agenda. "This initiative reflects the steadfast commitment of the Madani government to strengthening a modern, advanced and high-quality public transport system, one that delivers tangible benefits to the rakyat, in line with the aspirations of the 13th Malaysia Plan," he said.

SIPP-YTL’s managing director, Datuk Seri Yeoh Seok Hong, said the construction demanded high-precision engineering, from bridges to depots and stations, all built to world-class standards. 

ETS_Gemas_1.jpg
"The line doesn’t just make travel faster but it also supports economic growth, social mobility, and sustainable development in southern Malaysia," he stressed.

Tagged:

Gemas-JB electrified double-track rail line
Gemas-JB ETS
Keretapi Tanah Melayu Berhad (KTMB)
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Gemas-JB Rail Project Set To Start Full Service This Month

The Gemas-Johor Baru rail line nears completion with full train services expected this month.

21-11-2025
Auto News

Gemas-JB ETS Expected To Launch In Aug 2025

ETS between Gemas and JB is nearing completion and is expected to start running in August.

05-03-2025
Auto News

KTMB’s ETS3 To JB Sentral Launches Dec 12 with 30% Discount

KTMB will start operating its ETS3 to JB Sentral on 12 Dec 202 with a 30% discount for travel on this route.

09-12-2025
Auto News

KTMB Halts Klang-KL Sentral Route This Sunday for Track Upgrades

KTMB will temporarily suspend the Klang-KL Sentral service this Sunday (Dec 7) to allow for track and upgrade works.

04-12-2025
Auto News

KTMB Set To Launch Komuter Selatan in Feb with Fares Under RM3

Starting Feb, the 25 km Komuter Selatan line will slash Johor peak-hour travel to 30 minutes with fares under RM3.

02-12-2025
Auto News

KTMB Diverts Passengers From Arau Station As Floods Worsen In Perlis

Flooded roads have forced KTMB to temporarily shift ETS boarding and alighting from Arau to Kodiang Station.

25-11-2025
Auto News

ETS JB to KL Service Starts Dec 12, Royal Launch Set For Dec 11

ETS JB-KL service finally set to begin operations on Dec 12, official launch graced by the Sultan Ibrahim set for Dec 11.

Auto News

Over 1,300 hours Of Train Delays This Year Due To Cable Theft - Loke

Cable theft has caused major disruptions to KTM Komuter and ETS services this year, resulting in over 1,300 hours of delays.

21-11-2025

Latest News

Auto News

Govt Rules Out Tiered RON95 Pricing After 300 litres

Government rules out tiered RON95 prices under BUDI95, keeps RM1.99 for first 300 litres

12-12-2025
Auto News

Hyundai Partners EON, Expands Local Network

Hyundai and EON have signed a LOI to open two new dealerships in Klang Valley and Penang.

Auto News

Perodua Traz/Nexis D66B Set to Debut on December 17

The long-awaited Perodua Traz/Nexis D66B SUV is set to make its official debut later on December 17, 2025.

12-12-2025
Auto News

Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours

The new electrified Gemas-Johor Bahru train line slashes travel time from KL to Johor to just 4 hours 20 minutes.

12-12-2025
Auto News

PLUS and KEC Ink MoU to Advance Smart Mobility

PLUS and KEC Smart Mobility signs agreement to develop smarter, greener and more connected expressway operations.

Auto News

LRT3 Won’t Launch This Year As Glitches Persist, No New Date Set

The LRT3 faces another delay after 33 software glitches were discovered during fault-free tests and no new opening date has been fixed yet.

12-12-2025
Auto News

CKD GWM WEY G9 Rolls Out at New EPMB Plant

CKD GWM WEY G9 rolls out from EPMB’s new Phase 2 plant, strengthening Malaysia’s NEV localisation ecosystem.

Auto News

Proton Shifts 13,451 Units Throughout Nov 2025

Proton closes Nov 2025 by shifting 13,451 units, touts to be “on target” for record exports growth too.

11-12-2025