Link Copiedcheck_circle
Auto News

Bukit Chagar RTS Link Station Roof Completed, Final Facade Works Underway

Anis

Share via

download---2025-11-17T111703.469-(3).jpeg The Johor Bahru–Singapore RTS Link has taken another big step forward, with MRT Corp confirming that the main roof structure at Bukit Chagar station is now complete, marking a key transition into the project’s final construction phase.

The roof, made up of large steel facade bands, now provides permanent protection over the station platforms. 

With this in place, contractors have been able to remove temporary shelters above the tracks, opening up the site and allowing work on platforms, architectural elements and system installations to move ahead more smoothly.




This development also signals the start of the last phase of facade works, with external cladding and glass installation already under way. Once finished, the station is expected to become a standout landmark for Johor Bahru, both visually and functionally.

“This milestone goes beyond completing a physical structure. It reflects how national infrastructure can promote Malaysian capability, collaboration and excellence,” said MRT Corp chief executive Datuk Mohd Zarif Hashim.

He noted that the station’s facade carries special meaning, as its final design, fabrication and installation were entirely handled by Malaysian contractors.

The facade itself was conceived as a gateway into Johor Bahru and a symbol of the close ties between Malaysia and Singapore. Its design was selected through a national architectural competition in 2020, with MRT Corp and an international consultant later confirming its feasibility.

In terms of scale, the structure is substantial. The roof stands about 50 metres high, stretches 200 metres long and spans 50 metres wide, featuring 16 steel bands, along with a rainscreen system, skylights and a spire. 

"Fabrication works were carried out across facilities in Bentong, Seremban and Tapah, covering more than 40,000 square metres to meet engineering and quality requirements," he added.

620490810_18553490176013646_8362182722101763070_n.jpg
With major structural works now in place, MRT Corp said the focus is firmly on operational readiness, ensuring the RTS Link is completed safely and on schedule.

Once operational, the 4km RTS Link shuttle will connect Bukit Chagar station in Johor Bahru to Woodlands North station in Singapore, and is expected to handle up to 10,000 passengers per hour in each direction during peak periods, easing cross-border travel significantly.

Tagged:

MRT corp
Rapid Transit System Link (RTS Link)
Johor Bahru-Singapore Rapid Transit System (RTS)
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

MRT Putrajaya Line Phase Two Operational March 2023, Total Line Spans 56.2KM

The 38.7 km-long section of the Phase Two alignment, which consists of 15 elevated stations and 9 underground stations, is expected to be operational in March 2023.

24-12-2022
Auto News

Johor–Singapore RTS Link Fare Expected at RM15 to RM22 Per Trip

Transport Minister Anthony Loke says the RTS Link could cost between RM15 and RM22 per journey, with fares to be announced in 2H2026.

23-02-2026
Auto News

First RTS Link Train Set Delivered Ahead of 2026 Launch

The first train set for the Johor Bahru-Singapore RTS Link was unveiled today and will begin testing soon.

30-06-2025
Auto News

Johor–Singapore RTS Link Fare Expected at RM15 to RM22 Per Trip

Transport Minister Anthony Loke says the RTS Link could cost between RM15 and RM22 per journey, with fares to be announced in 2H2026.

23-02-2026

Latest News

Auto News

Prime, Premium, Or Premium Plus? 4 Major Differences Between The 3 Proton e.Mas 7 Tiers

Prime, Premium, or Premium Plus? We break down the 4 massive differences in battery range, price, and luxury features across the new Proton eMas 7 EV tiers.

12-06-2026
Auto News

15 Drug Records But Still Driving?! Malaysians Are Furious Over The Viral Penang Highway Triton Rampage

Shocking details emerge on the viral Mitsubishi Triton highway crash in Penang. The drugged driver has 17 prior convictions, leaving 18 cars damaged.

10-06-2026
Auto News

Don't Buy A Car Full Price! Perodua Just Quietly Slashed Prices On 5 Models & The Discounts Vanish After June 30

Perodua just quietly slashed prices on 5 popular models for June 2026! Check out the exact cash rebates for the Myvi, Ativa, Aruz, Bezza, and Axia here.

09-06-2026
Auto News

Upgraded e.MAS 7 & A Spicy X50?! 5 Things To Check Out At Proton’s KLIMS 2026 Booth This June 12–21

Proton is bringing an upgraded long-range e.MAS 7, a humanoid robot, and new FutureMotion hybrid tech to KLIMS 2026 at MITEC. Here is what to look out for.

09-06-2026
Auto News

1,400 hp SUV? 3 Wildest Things To See At Zeekr’s KLIMS 2026 Booth This 12-21 June

Looking for ultimate luxury? Discover why you should hold your premium vehicle booking until KLIMS 2026 as Zeekr previews the insane 1,400hp Zeekr 9X PHEV, the 4-seat 009 Grand, and the handle-less 2026 Zeekr X facelift.

09-06-2026
Auto News

Holding A Showroom Pen? Freeze Your SUV Deposit Until You See Mazda's Booth At KLIMS 2026

Thinking of buying a new SUV? Discover why you should freeze your deposit until KLIMS 2026 as Mazda previews the bigger 3rd-gen Mazda CX-5 and launches the straight-six CX-60 3.3G AWD.

09-06-2026
Auto News

Heartbreaking Dashcam Footage Reveals Final Moments Before Tragic Collision That Wiped Out 3 Generations Of A Family

A brand-new Proton X50 turned into a nightmare just hours after delivery, as a tragic head-on collision claimed the lives of 6 family members, including a baby.

08-06-2026
Auto News

RM200k Rebates?! Test Drive 9 Brands At The Sime Motors MotorExpo 2026 This Weekend

Hit up the free-entry Sime Motors MotorExpo 2026 at XOX Arena this weekend for massive RM200,000 rebates and test drives from 9 major brands.

05-06-2026