Key road closures for PJ Half Marathon 2022 this Sunday, Sept 25

The PJ Half Marathon 2022 event takes place this Sunday, Sept 25, marking the landmark running event’s post-pandemic return too. With that, the event will see several key road closures in and around the vicinity of Petaling Jaya city for the 30 KM-long run.
The flag-off time for the race has been set for 4.30AM at Dataran PJ. Various road closures in the city will start from 4:00AM and should last until 12:00PM, some for the whole event, and others in stages. Both Police (PDRM) and City Hall (MBPJ) officers have been tasked on duty to manage traffic during the race too.
Starting with the slip road from Federal Highway to Jalan Timur (from KL), this will be closed from 4:00AM to 10:00AM. Alternative routes will be provided via Jalan Barat (Section 14 and Seapark bound) and Jalan 222 (PJ state bound). Take note that the Jalan Timur – Persiaran Barat stretch will also be closed until 10:00AM.
As for the event’s set up and tear down, it sees the Persiaran Barat – Jalan Timur stretch endure a partial closure from 6PMon Saturday (Sept 24) until 12:00PM on race day.




On race day, road closures in stages will last from 4.30AM to 11:00AM. This will cover almost every major road in and around PJ with either partial or full closures, and it involves the following streets:
- Jalan Timur
- Jalan Barat
- Jalan Utara
- Jalan Sultan
- Jalan Gasing
- Jalan Templer
- Jalan Harapan
- Jalan Semangat
- Jalan Kemajuan
- Jalan Universiti
Unless you’re taking part in the PJ Half Marathon 2022 in some form or way, we reckon it’s best for you to avoid any travel across PJ this Sunday.
Written By
Thoriq Azmi
Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/
JPJ Running Numbers
KUALA LUMPUR
VQC635
SELANGOR
BSK5054
JOHOR
JYM594
PULAU PINANG
PRW2413
PERAK
APC9749
PAHANG
CFE3195
KEDAH
KGD2548
NEGERI SEMBILAN
NEH7414
KOTA KINABALU
SJP1142
KUCHING
QAB6451M
Last updated 29 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.63
-0.02
RON 97
RM 3.26
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.08
-0.02
EURO 5 B7
RM 3.28
-0.02
Last updated 27 Nov, 2025
Related News
ASEAN 2025: Major Road Closures Across KL from Oct 26–28
Kuala Lumpur sees staged road and highway closures to accommodate official convoys during the ASEAN 2025 Summit.
14-10-2025
Lekas Highway To Close This Weekend For Cycling Event
The Lekas will be closed from 5PM Sat to 4AM Sun to make way for the RHB LEKAS Highway Ride 2025.
09-10-2025
Full Closure On Gua Musang–Lojing Due To Sinkhole
The Gua Musang–Lojing road at KM78 near Kampung Jekjok has been fully closed after a fifth sinkhole was discovered
17-09-2025
Road Closures In Seremban Ahead Of Merdeka
Several major roads in Seremban will close this week for National Day rehearsals and celebrations.
29-08-2025
Road Detours & Diversions In KL July 4-7 & 8-11 For ASEAN Meeting
PDRM issues list of road detours and diversions for selected KL roads for ASEAN meeting set for July 4-7 and July 8-11.
05-07-2025
Delayed - Overnight Closure At Sg Besi Toll For Gantry Works Canceled
KL–Seremban Highway near Sg Besi toll to close overnight (July 2–3) for gantry works delayed.
01-07-2025
PLUS: Lane Closure & Contraflow on Penang’s Tun Dr Lim Chong Eu Expressway
Full lane closure plus contraflow in effect on stretch of Tun Dr Lim Chong Eu expressway from Penang Bridge towards Georgetown until June 20.
19-06-2025
DBKL Announces Partial Closure Of Jalan Raja From June 9-15
DBKL has announced that Jalan Raja will undergo a week-long closure from June 9 to June 15.
09-06-2025
Latest News
Kia Sales Malaysia Announced As New Brand Principals
Kia Sales Malaysia announced as brand principals, takes over from distributors BAuto (Dinamikjaya Motors).
28-11-2025
First ECRL Trains Depart China, Remaining Units Arriving Through 2026
First ECRL trains depart China, with remaining units scheduled to arrive through 2026.
28-11-2025
Only 30% Of Malaysian Children Use Car Seats - MIROS
Despite CRS being mandatory for five years, many parents still ignore child safety rules, MIROS warns.
28-11-2025
MyJPJ Will Require MyDigital ID Login Starting Feb 2026
JPJ is making MyDigital ID the mandatory single sign-in for all MyJPJ users aged 18 and above.
28-11-2025
Review Underway For 12 Loss-Making Highways - Nanta
Works Ministry will conduct a detailed review of the issue involving 12 highway concessions that recorded losses last year.
28-11-2025
Proton Strengthens Local Supply Chain with RM3.2b in Local Parts
Proton local supply chain spend reached RM3.2b, highlighting a push to deepen Malaysia’s automotive parts sourcing.
28-11-2025
New 2026 Proton Saga Scores 4-Star ASEAN NCAP Rating
The new 2025 Proton Saga arrives safer than ever, with a 4-star ASEAN NCAP rating
27-11-2025
Aeroline Resumes Singapore-Malaysia Routes On Nov 28
Malaysian coach operator Aeroline is resuming its Singapore-Malaysia routes on Friday, Nov 28.
27-11-2025
Show More
trending_flat