Are Malaysian Street Parking Space Sizes Regulated?

Street parking bays in city centres and dense suburban areas are an absolute luxury, especially during peak periods such as lunch and dinner. Apart from businesses illegally cordoning-off public parking lots for their personal use, there seems to be another issue at hand: the size of these lots.
If you glance at the image below, it would seem that the owner of the white BMW was being inconsiderate with his parking ethics by taking up extra space on the left. However, a closer look at both sides shows us that said BMW’s parking was perfect on the drivers side, yet he couldn't make it fit into the space provided.


How can this happen? Is the BMW, which happens to be a flagship 7-series model, simply too big for our Malaysian parking lot sizes? Not quite… By no means is this the fault of the car or its owner. Instead, either the municipal council, which in this case is Majlis Bandaraya Petaling Jaya (MBPJ), or their appointed contractors, or the developer, are perhaps to blame here.
-full.jpg)
By manufacturer's specification, the BMW pictured has a width of 1,902 MM, and that is with the side mirrors in open position. A parking lot size, in accordance with PLANMalaysia specification, should be 2,500 MM wide. Based on these figures, clearly the BMW should have nearly 600 MM of extra space to park properly. However, it is obvious that the parking spaces in Sunway Damansara pictured are much narrower than 1,902 MM.

One reason we reckon caused this is developers deliberately reducing the size of parking lots in dense locations as pictured. Based on PLANMalaysia’s requirement, there has to be a certain number of parking bays allocated by every developer for each area, be it housing or commercial types, based on the number of buildings and business lots present. Reducing the parking lot size is an easy workaround to meet this requirement, and we highly doubt anyone has actually gone to physically measure each parking lot to verify their sizes.
-GP011-A-GPP-Tempat-Letak-Kenderaan1024_21-full.jpg)
-GP011-A-GPP-Tempat-Letak-Kenderaan1024_22-full.jpg)
So, who should actually be blamed for this then? CariCarz.com managed to get in touch with PLANMalaysia officers about this. Based on their explanation via their guideline, the entire implementation and management of parking spaces is the responsibility of the local municipal council.
If so, why are the size guidelines not followed? Who is turning a blind eye on this? The officers are surely on ground daily issuing summons, hence it's highly unlikely they would have missed it. If the parking lines were drawn by a third party contractor, who signed-off on this considering how long these parking lots have existed for?
Gallery
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VRQ9827
SELANGOR
BST8963
JOHOR
JE5916J
PULAU PINANG
PSF7343
PERAK
APL6244
PAHANG
CFH7982
KEDAH
KGJ2151
NEGERI SEMBILAN
NEL9551
KOTA KINABALU
SJU2247
KUCHING
QAB6004P
Last updated 24 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Petaling Jaya Aims For 40% Public Transport Use By 2045
MBPJ aims to boost public transport use to 40% by 2045, up from the current 10%.
02-12-2025
MBPJ Standardises Reserved Bays into 24-Hour Parking
MBPJ converting 1,054 reserved and blue-lined bays into 24-hour spaces rented at RM400 monthly.
17-10-2025
New Concessionaire Set to Manage Parking Collection in Selangor from Aug 1
From Aug 1 onwards, a new concessionaire will manage the parking fee collection for MBPJ, MBSJ, MBSA, and MPS.
10-07-2025
MBPJ, EVC & Carput Zap Eyes 1,000 EV Chargers by 2030
MBPJ partners with EVC and Carput Zap, collectively targets to have 1,000 EV chargers across PJ by 2030.
01-07-2025
Petaling Jaya Road Closure, 17 & 18 June - PJ10K 2023 Run
MBPJ has announced a series of road closures to facilitate the PJ10K 2023 this weekend, 17 and 18 June 2023.
15-06-2023
MBPJ Enforce Two-Hour Parking Limit Zones In Section 52
The Petaling Jaya City Council (MBPJ) introduced a two-hour parking restriction in the commercial area of Section 52.
23-03-2023
MBPJ Closes Roads, Intersections For Contra Routes For Three Months Starting March 1st
MBPJ will close a number of roads and intersections in order to implement contra routes starting March 1st.
20-02-2023
PJ City Bus To Make QR Code Scanning Mandatory Effective 2023
Starting next year, customers will be required to scan a QR code twice when using the PJ City Bus according to the Petaling Jaya City Council (MBPJ).
01-01-2023
Latest News
Perodua Ativa X Is Now RM53K - Would You Still Buy A Myvi?
The Perodua Ativa X is now RM53,000 after a RM9,500 rebate, just RM1,900 below the Myvi 1.5 H. Here's what you get with each.
17-09-2026
BUDI Diesel Can Now Be Transferred Beyond Family - Here's How It Works
BUDI Diesel eligibility can now be transferred beyond immediate family to the actual vehicle user. Here's who qualifies, how to apply and the Sept 27 deadline.
17-09-2026
Puspakom Has More Rivals Now. So Why Aren't Car Inspections Getting Cheaper?
Puspakom now has rivals for M.V.15 ownership transfer inspections, but fees won't get cheaper. Here's why JPJ is keeping rates standardised.
15-09-2026
If You're In Penang And Eyeing A Suzuki, There's A New Showroom To Check Out
Suzuki has opened a new RM1 million dealership in Juru, Penang, expanding its Malaysian network to 14 sales outlets and 13 service centres.
14-09-2026
Malaysia Has More Car Brands Than Ever. So Why Do We Still Choose Proton And Perodua?
Proton and Perodua account for nearly 63% of Malaysia's new car registrations in 2026. Here's why national brands still dominate despite growing competition.
14-09-2026
40,595 Summonses, RM12.18 Million Unpaid. JPJ's Patience Is Running Out
JPJ has given 945 transport companies 14 days to settle 40,595 outstanding summonses worth RM12.18 million or face tougher enforcement.
11-09-2026
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Show More
trending_flat
