New Concessionaire Set to Manage Parking Collection in Selangor from Aug 1
From Aug 1 onwards, a new concessionaire will manage the parking fee collection for MBPJ, MBSJ, MBSA, and MPS.
The Selangor state government has just appointed a new concessionaire, Rantaian Mesra Sdn Bhd, to manage parking fee collection in four of its local councilors (PBTs) from Aug 1, 2025, onwards. According to Bernama, those four PBTs are the Petaling Jaya city council (MBPJ), Subang Jaya city council (MBSJ), Shah Alam city council (MBSA), and Selayang municipal council (MPS).
According to Selangor local government and tourism EXCO Datuk Ng Suee Lim, the appointment of the new concessionaire is part of the state government’s efforts to boost parking revenue, which currently has a collection rate of only 30% from 1,000 designated bays.
Selangor local government and tourism EXCO Datuk Ng Suee Lim
“The concessionaire will handle both fee collection and enforcement, under close supervision from the councils and the state government.
“We target a collection rate of over 60% and hope to reduce double parking in busy areas,” he told Bernama during a press conference at the Selangor state assembly sitting earlier today.
The EXCO further added that revenues from the parking fee collection will be split equally, with the concessionaire receiving 50%, while the remaining 50% will go to the state—40% to the local councils and 10% to MBI Selangor.
While a new concessionaire has been appointed, Ng assured that the new system will not lead to an increase in parking rates, which will remain between 40 and 60 sen per hour.
He also denied claims of a closed tender process when picking this new concessionaire, stressing that a total of 26 companies had responded to a Request for Proposal (RFP) before three were shortlisted.
“The final company was selected based on strict performance conditions. If targets are not met, the 10-year contract can be terminated at any time,” Ng insisted.
Source: Bernama
Gallery



Written By
Mukhlis Azman
An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman
JPJ Running Numbers
KUALA LUMPUR
VPV2970
SELANGOR
BSJ4490
JOHOR
JYJ2621
PULAU PINANG
PRU7561
PERAK
APB7310
PAHANG
CFD7358
KEDAH
KGC5946
NEGERI SEMBILAN
NEH3630
KOTA KINABALU
SJN1267
KUCHING
QAB3415M
Last updated 15 Oct, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.18
-0.03
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.93
EURO 5 B7
RM 3.13
Last updated 09 Oct, 2025
Related News
MBPJ, EVC & Carput Zap Eyes 1,000 EV Chargers by 2030
MBPJ partners with EVC and Carput Zap, collectively targets to have 1,000 EV chargers across PJ by 2030.
01-07-2025
Petaling Jaya Road Closure, 17 & 18 June - PJ10K 2023 Run
MBPJ has announced a series of road closures to facilitate the PJ10K 2023 this weekend, 17 and 18 June 2023.
15-06-2023
MBPJ Enforce Two-Hour Parking Limit Zones In Section 52
The Petaling Jaya City Council (MBPJ) introduced a two-hour parking restriction in the commercial area of Section 52.
23-03-2023
MBPJ Closes Roads, Intersections For Contra Routes For Three Months Starting March 1st
MBPJ will close a number of roads and intersections in order to implement contra routes starting March 1st.
20-02-2023
Are Malaysian Street Parking Space Sizes Regulated?
Are public street parking space sizes in Malaysia regulated? Here’s what we found out…
26-01-2023
PJ City Bus To Make QR Code Scanning Mandatory Effective 2023
Starting next year, customers will be required to scan a QR code twice when using the PJ City Bus according to the Petaling Jaya City Council (MBPJ).
01-01-2023
Parking Solutions Being Studied For Future Seri Kembangan Market
Studies are underway to add more parking near the future Seri Kembangan market.
11-09-2025
Litrak Should Reconsider Puchong Selatan U-Turn Closure
Subang Jaya Mayor opposes U-Turn closure at Puchong Selatan toll.
27-03-2025
Latest News
JPJ: Zero Tolerance Towards Overloading Includes Body Cam & Firearms Adoption
JPJ deploys body cam and small arms (pistols) as part of a nationwide crackdown on overloaded commercial vehicles.
14-10-2025
PCJB Completes First Full Classic Porsche Restoration In Malaysia
Porsche Centre Johor Bahru (PCJB) completes first full Classic Porsche restoration project in Malayia through pristine 911 T from 1975.
14-10-2025
ECRL Theft Case: 32nd Incident Recorded, RM3 Million in Cumulative Losses
The ECRL project has recorded its 32nd case of theft or vandalism along its alignment from Kota Bharu to Port Klang.
14-10-2025
KLIA Aerotrain Logs 19 Glitches, Faces RM190k Monthly Fine
The KLIA Aerotrain recorded 19 minor issues since its relaunch, with the manufacturer facing fines of up to RM190,000 a month.
14-10-2025
ASEAN 2025: Major Road Closures Across KL from Oct 26–28
Kuala Lumpur sees staged road and highway closures to accommodate official convoys during the ASEAN 2025 Summit.
14-10-2025
Full-Time E-Hailing Drivers Can Now Get 600 Litres Under BUDI95
The Finance Ministry has doubled the monthly RON95 quota to 600 litres for full-time e-hailing drivers.
14-10-2025
JPJ Pahang Cracks Down On Illegal Touting in Genting Highlands
Pahang JPJ ramped up enforcement in Genting Highlands, targeting illegal touts pressuring visitors to use unlicensed transport services.
14-10-2025
Singapore Probes Kummute’s Cross-Border “CB Taxi” Service
Singapore’s transport authority is investigating Malaysian e-hailing firm Kummute’s new cross-border taxi service.
13-10-2025
Show More
trending_flat