LRT Peak Hours Extended Due To Service Disruption - Kinked Rail Tracks
Following up on the disruption of LRT services from Bandaraya LTR to Masjid Jamek LRT station caused by structural damage resulting in an misaligned/kinked rail tracks near the Bandaraya LRT station, Rapid KL the rail operator will extend the morning and evening peak operation hours for the Ampang/Sri Petaling Line LRT and Kuala Lumpur Monorail route starts today, Jan 30, 2023.
The extension of this peak hour is to provide convenience and comfort to all users, and they can plan their journeys in advance to reduce congestion at several rail stations, particularly at the Masjid Jamek LRT interchange station and the Hang Tuah LRT Station.
Morning peak hours would now begin from 6.30 am to 10.30 am compared to the original schedule of 7 am to 9.30 am. While the evening peak hour will be extended from 4.30 pm to 8.30 pm compared to the original schedule which is 5 pm to 7.30 pm.
The following are peak hour operations and train frequencies;
The number of free intermediate buses will also be increased with a frequency of 10 minutes depending on traffic conditions. The details of the free intermediate bus service are as below;
In order to facilitate the travel and movement of passengers, Rapid KL will increase the number of support staff to a hundred people in order to control and assist passengers who need assistance at rail stations.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPM5604
SELANGOR
BSG7745
JOHOR
JYE5042
PULAU PINANG
PRT1080
PERAK
ANY7246
PAHANG
CFD721
KEDAH
KGB6454
NEGERI SEMBILAN
NEG6404
KOTA KINABALU
SJL9999*
KUCHING
QAB8459L
Last updated 05 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Rapid Rail Suspends LRT Operations At Six Stations, Starting April 2
Rapid KL has announced six stations on the Ampang – Sri Petaling LRT line will be suspended starting April 2.
31-03-2023
Loke Directs Prasarana To Meet On Klang Valley Train Disruptions
Prasarana has been directed by Loke to hold a special meeting to find the source of the technical issues affecting the MRT and LRT lines.
29-03-2023
Sentul Timur - Bandaraya LRT Train Frequency Reduced Due To Maintenance Issue.
LRT service between Sentul Timur station and Bandaraya station will now operate at a delayed frequency of every 12 minutes.
24-02-2023
Bandaraya-Masjid Jamek LRT Line Closed For Two Weeks - Loke
Ampang LRT line will be closed between the Bandaraya and Masjid Jamek stations for about two weeks.
02-02-2023
Lightning Strike Caused Delay On Kelana Jaya LRT Line - Rapid Rail
According to Rapid Rail Sdn Bhd, a lightning strike on a Platform Intrusion Emergency Stop (PIES) component at the Kerinchi LRT station caused a delay in train frequencies along the Kelana Jaya LRT line earlier on Tuesday (Nov 29).
30-11-2022
LRT Service Could Resume Sooner, Problem Rectified, Said Wee
According to Wee Ka Siong, Services on the Kelana Jaya LRT line could be fully restored earlier than anticipated.
11-11-2022
Selangor contributes 20 buses to assist commuters after LRT service failure
Prasarana Malaysia Berhad (Prasarana) has added 20 free feeder buses for affected commuters that has now reached over 100 to accommodate passengers on five routes.
10-11-2022
Rapid Bus Adds Seven New Klang Valley Routes
Rapid KL adds seven new Klang Valley routes to improve links between On-Demand services and major rail networks.
29-04-2025
Latest News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor
KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.
04-08-2025
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
Show More
trending_flat