EV Charging Bays Need To Undergo Thorough Inspection For Safety - Fire & Rescue Dept
According to its director-general Datuk Seri Abdul Wahab Mat Yasin, the Fire and Rescue Department will examine the network of electric vehicle charging bays (EVCB) to make sure they comply with fire safety regulations and to find out if they have the required permits.
He stated that fire hazard abatement notices would be given to EVCBs installed without the department's consent. An abatement notice instructs the property owner to create defensible space and remove or minimise flammable materials or sources from the property in order to lower the risk of fires.
-full-full.jpg)
Owners of the property will be fined if they don't comply with the reasonable time frame provided to them to make the necessary corrections. The department assured that it would closely monitor the situation now that the government has announced guidelines to accelerate and standardise the development of EVCBs.
According to Abdul Wahab, his department was directly involved in the creation of the aforementioned guidelines. The department assured that it would closely monitor the situation now that the government has announced guidelines to accelerate and standardise the development of EVCBs.
According to Abdul Wahab, his department was directly involved in the creation of the aforementioned guidelines. "Some of the factors considered for EVCB placement include easy access by the Fire Department in the event of a fire." "This is why these charging bays will only be permitted to be installed in specific locations and levels, particularly when direct current (DC) charging is involved."
"These bays must be no more than 30m away from dry and wet risers, as this will speed up and simplify access for our personnel in the field."
Abdul Wahab stated that he was aware of some safety concerns raised by certain parties regarding the installation of these bays, particularly in condominiums, apartments, and commercial buildings.
"The public should also note that a huge number of EVCBs have been installed at certain buildings over the last 10 years.

"The charging points must follow the standards set by the respective local governments and must also be installed by competent individuals who have Energy Commission certification," he said, adding that the installation must also receive approval of the Fire and Rescue Department, with the department conducting regular inspections to ensure compliance.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPY2637
SELANGOR
BSJ9437
JOHOR
JYK6402
PULAU PINANG
PRV4748
PERAK
APC3558
PAHANG
CFD9915
KEDAH
KGC8690
NEGERI SEMBILAN
NEH5392
KOTA KINABALU
SJN5584
KUCHING
QAB4799M
Last updated 05 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.02
+0.07
EURO 5 B7
RM 3.22
+0.07
Last updated 06 Nov, 2025
Related News
On Going Highway Construction Collapse Near Desa Tun Razak
Highway Construction Collapse Near Desa Tun Razak
03-03-2021
1,063 EV Charging Stations Currently Operational in Malaysia – MITI
The total EV charging stations in Malaysia just broke the 1,000 mark, with only 1,063 currently operational, says MITI
20-07-2023
Latest News
Updated Fuel Prices From 6 To 12 November
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 6 to 12 November, 2025, the rates are as such.
05-11-2025
UMWT Shifted 9,141 Units in Oct 2025, YTD Now at 79,559 Units
UMW Toyota Motor closes October 2025 on a high note by shifting 9,141 units, bringing its YTD sales to 79,559 units.
05-11-2025
Budi95: Govt Delays Subsidy Cut For T15 Until System Fully Ready
Removal of RON95 subsidies for the T15 income group will wait until the BUDI95 system is stable.
05-11-2025
ECRL Hits 88% Milestone As Key C1B Stretch Completed
The ECRL project has hit 88% completion with the C1B Segment now successfully completed.
05-11-2025
Govt Mulls Expanding FLYSiswa Aid To Private University Students
MOT is studying ways to extend the RM400 flight subsidy to private university students.
05-11-2025
Massive Sinkhole Opens In Bayan Lepas, Road Closed For Safety
A huge sinkhole measuring nearly two metres deep has opened near SMK Sungai Ara in Bayan Lepas.
05-11-2025
Touch ‘n Go Announces Titan Flow Multi-Lane Fast Flow Platform
In conjunction with MyARTTE 2025, Touch ‘n Go introduces its own multi-lane fast flow platform known as Titan Flow.
04-11-2025
BUDI95: Fuel Quota For E-Hailing Drivers Raised To 800 Litres
The govt has approved an 800-litre monthly RON95 quota for full-time e-hailing drivers under BUDI95.
04-11-2025
Show More
trending_flat