EV Charging Bays Need To Undergo Thorough Inspection For Safety - Fire & Rescue Dept
According to its director-general Datuk Seri Abdul Wahab Mat Yasin, the Fire and Rescue Department will examine the network of electric vehicle charging bays (EVCB) to make sure they comply with fire safety regulations and to find out if they have the required permits.
He stated that fire hazard abatement notices would be given to EVCBs installed without the department's consent. An abatement notice instructs the property owner to create defensible space and remove or minimise flammable materials or sources from the property in order to lower the risk of fires.
-full-full.jpg)
Owners of the property will be fined if they don't comply with the reasonable time frame provided to them to make the necessary corrections. The department assured that it would closely monitor the situation now that the government has announced guidelines to accelerate and standardise the development of EVCBs.
According to Abdul Wahab, his department was directly involved in the creation of the aforementioned guidelines. The department assured that it would closely monitor the situation now that the government has announced guidelines to accelerate and standardise the development of EVCBs.
According to Abdul Wahab, his department was directly involved in the creation of the aforementioned guidelines. "Some of the factors considered for EVCB placement include easy access by the Fire Department in the event of a fire." "This is why these charging bays will only be permitted to be installed in specific locations and levels, particularly when direct current (DC) charging is involved."
"These bays must be no more than 30m away from dry and wet risers, as this will speed up and simplify access for our personnel in the field."
Abdul Wahab stated that he was aware of some safety concerns raised by certain parties regarding the installation of these bays, particularly in condominiums, apartments, and commercial buildings.
"The public should also note that a huge number of EVCBs have been installed at certain buildings over the last 10 years.

"The charging points must follow the standards set by the respective local governments and must also be installed by competent individuals who have Energy Commission certification," he said, adding that the installation must also receive approval of the Fire and Rescue Department, with the department conducting regular inspections to ensure compliance.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPY6421
SELANGOR
BSK1093
JOHOR
JYK8570
PULAU PINANG
PRV5812
PERAK
APC4361
PAHANG
CFE1282
KEDAH
KGC9402
NEGERI SEMBILAN
NEH5763
KOTA KINABALU
SJN6172
KUCHING
QAB4986M
Last updated 11 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.02
+0.07
EURO 5 B7
RM 3.22
+0.07
Last updated 06 Nov, 2025
Related News
On Going Highway Construction Collapse Near Desa Tun Razak
Highway Construction Collapse Near Desa Tun Razak
03-03-2021
1,063 EV Charging Stations Currently Operational in Malaysia – MITI
The total EV charging stations in Malaysia just broke the 1,000 mark, with only 1,063 currently operational, says MITI
20-07-2023
Latest News
LATAR Interchange Opens, Direct Access To Eco Grandeur
The Eco Grandeur Interchange and Toll Plaza has officially opened, offering direct access through Exit 2502 to Eco Grandeur.
11-11-2025
Penang Sentral Set to Become Mainland’s Integrated Transport Hub
The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.
11-11-2025
Six Bidders Eye Barrier-Free MLFF Toll System - Report
Six consortiums are reportedly competing to roll out Malaysia’s long-awaited MLFF toll system.
11-11-2025
EV Ownership Risky, Battery Leasing Could Ease Depreciation Risks - Analysts
EVs can lose nearly half their value in five years, while high battery costs and limited infrastructure keep ownership risky.
11-11-2025
PLUS To Close Two Bangi Ramps Nightly Until Nov 28
PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.
10-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient
JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.
10-11-2025
JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams
JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.
10-11-2025
Show More
trending_flat