Major Delays On MRT Putrajaya Line Caused By Trespassers - Rapidrail
The MRT Putrajaya Line experienced a service disruption this morning between the Taman Naga Emas and Sungai Besi stations due to a trespassing incident.
In an official statement, @askrapidkl or Rapidrail reported that the disruption was caused by an individual trespassing onto the railway tracks at Taman Naga Emas and Sungai Besi stations at 4.56am.
Rapid Rail's auxiliary police officers were dispatched to the scene in a timely manner by Rapid KL, the operator of the MRT Putrajaya Line. The staff found the intruder right away and reported the incident to the Operations Control Center (OCC).
The affected area's power supply was promptly turned off to protect passenger safety and aid in the intruder's capture.
Then, at 6:30 a.m., a rescue team made up of members of the Royal Malaysia Police (PDRM), the Malaysian Fire and Rescue Department, and medical personnel arrived at Taman Naga Emas Station. At 7:11 a.m., the intruder was successfully removed from the railroad tracks and placed under arrest.
Rapid Rail provided complimentary feeder buses at the Kuchai and Serdang Raya Utara stations as well as an alternate rail service during this time. The OCC was required by SOPs and safety concerns to inspect the track before resuming power. At 7.36 am, the MRT Putrajaya Line started operating normally again.
Expressing regret for the inconvenience to commuters, Rapid Rail promised that it would improve safety protocols to avert such incidents in the future.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM4953
SELANGOR
BSG7526
JOHOR
JYE4650
PULAU PINANG
PRT798
PERAK
ANY6913
PAHANG
CFD492
KEDAH
KGB6367
NEGERI SEMBILAN
NEG6324
KOTA KINABALU
SJL9999*
KUCHING
QAB8407L
Last updated 04 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
My50 Pass Renewal Coming To PULSE App For Queue-Free Access
Prasarana is set to launch My50 pass purchase and activation via PULSE app soon.
19-06-2025
LRT Fatality: Train Runs Over Taiwanese Man
Emergency services confirms Taiwanese national man died at the scene after falling onto LRT tracks.
04-06-2025
Rapid KL Bus Lane Hours Extended — Now From 4.30 PM to 7 PM
Rapid KL has extended the operating hours of its bus lane in Jalan Ampang, now going from 4.30 PM to 7 PM.
16-05-2025
My50 Pass Renewal Temporarily Suspended Starting Dec 23
Rapid KL has announced that the renewal of the My50 pass will be temporarily suspended from Dec 23, 2024 to Jan 31, 2025.
18-12-2024
New Payment Options For My50 Pass Holders Next Year
My50 pass users will no longer be required to use their MyKad next year, as alternative payment options will be introduced.
11-11-2024
RapidKL Launches MyTourist Pass For KL Visitors
RapidKL has launched the MyTourist Pass to give visitors easy access to public transportation throughout KL.
11-11-2024
Loke Hopes My50 Initiative Extends Into 2025, Daily Users Exceed 1.1 Million
Loke hopes the Ministry of Finance will approve extending the My50 initiative in the 2025 Budget.
21-08-2024
LOKE: Prasarana Must Conduct Tree Fall Risk Analysis Along Its Rail Lines
Transport Minister Loke moots Prasarana to double efforts in identifying potential tree fall risks along its rail lines.
10-05-2024
Latest News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
30 Kindergarten Kids, Teachers Involved In Bus Crash; JPJ To Launch Audit
JPJ will audit the bus operator after a crash near UPM injured kindergarten kids and a teacher.
04-08-2025
Show More
trending_flat