ENZHMS
Link Copiedcheck_circle
EV

ChargeSini Inks MoU with KTC Arkz Group – 40 EVCB at Seri Iskandar Heights

Kumeran Sagathevan

Share via

ChargeSini-KTC-(12).jpg


ChargeSini has inked into a memorandum of understanding (MoU) with KTC Arkz Group Sdn Bhd (KTC) at Sungei Wang Plaza, KL recently for the rights to set up EV Charging stations at its forthcoming SOFO project, located at Seri Iskandar Heights about 40 km southwest of Ipoh, Perak.

Via this MoU, ChargeSini will be tasked to install 40 EV charging bays (EVCB) on the premises, comprising a mix of AC and DC chargers for the convenience of SOFO project residents and patrons. While the chargers will be operated and managed by ChargeSini, KTC would own and administer the whole parking system at the premise.


ChargeSini-KTC-(9).jpgChargeSini-KTC-(13).jpg


The two 20-storey high-rise buildings will be constructed on a 4.3-acre site which will cater for the needs of the growing township, which acts as Perak’s education hub with two university campuses – Universiti Teknologi PETRONAS and the branch campus of Universiti Teknologi MARA – and four other training institutes — Kolej Profesional MARA, Institut Kemahiran Belia Negara, Institut Latihan KEMAS and Kolej Vokasional MARA.

This project is only 17 KM from the nearest KTM station in Batu Gajah, 20 KM to entrance and exit of the West Coast Expressway, 38 KM from the PLUS Expressway, and 1 KM from the Ipoh-Lumut Highway.


ChargeSini-KTC-(6).jpgChargeSini-KTC-(7).jpg


The MoU was signed by ChargeSini CEO James Goh and KTC Group CEO Chong Khin Thin. During the MoU signing, it was also revealed that ChargeSini has already deployed 701 EVCBs across the country, with 24 of them now in the state of Perak.

Furthermore, under the terms of this MoU, ChargeSini would grant KTC access to its proprietary cloud-based control system, allowing KTC to access all aspects of the business from a CPO perspective, including the payment gateway, power distribution, management dashboard, and control centre.


ChargeSini-KTC-(11).jpg


The complete ecosystem described above would also be embedded in Seri Iskandar Heights' facilities management mobile application, allowing SOFO residents to easily access all of the building's features and services. 



Share This Article

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

JPJ Running Numbers

KUALA LUMPUR

VQE4498

SELANGOR

BSL671

JOHOR

JYN2750

PULAU PINANG

PRW7341

PERAK

APD4887

PAHANG

CFE5001

KEDAH

KGD5032

NEGERI SEMBILAN

NEH9637

KOTA KINABALU

SJP3703

KUCHING

QAB7805M

Last updated 22 Dec, 2025

Fuel Price

Petrol

RON 95

RM 2.64

-0.02

RON 97

RM 3.27

-0.02

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 3.06

-0.02

EURO 5 B7

RM 3.26

-0.02

Last updated 11 Dec, 2025

Related News

EV

No Rush, ChargeSini Extends Idle Grace Period to 30 Minutes

ChargeSini now gives EV users up to 30 minutes after charging ends before idle fees apply, offering more flexibility in busy areas.

EV

Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout

Meta Bright teams up with ChargeSini to scale EV charging infrastructure nationwide.

EV

Meta Bright Aligns with ChargeHere in Green Energy Push

Meta Bright and ChargeHere teams up, jointly seeking to accelerate EV charging infrastructure in Malaysia.

EV

PRO-NET Partners ChargeSini,Other CPOs, For EV Charging At Condos

PRO-NET partners ChargeSini and other leading CPOs to bring affordable, convenient EV charging to over 1,000 high-rises across Malaysia.

EV

Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC

Penang state government targets to establish 600 EV charging bays by this year, includes new ChargeSini DCFC too.

13-03-2025
EV

ChargeSini Partners UNITEN & Kevin Lab - Public EV Charger Usage Data Sharing

ChargeSini Inks MoU with UNITEN and Kevin Lab for joint data sharing and research to improve energy efficiency.

EV

ChargeSini To Set Up EV Chargers At KEB Properties New Developments

ChargeSini inks MOU with KEB Properties to develop new charging facilities in selected new developments.

EV

ChargeSini NU Empire Mall Subang DCFC Coming Soon - 2 x 60kW @ RM1.39/kWh

ChargeSini launches latest 60kW DCFC station at NU Empire Mall, Subang Jaya, offering a charging rate of RM1.39 per kWh.

Latest News

EV

ST Clarifies EV Charging Licences, Individual High-Rise Charging to Follow

ST clarifies EV charging licences policy, individual high-rise parking bays expected to be addressed next year.

EV

No Cash Rebates for EVs Under Budi95

No cash rebates for EVs Under Budi95, govt reminds again that targeted fuel assistance is for those who need it most.

EV

New Dedicated Electric Vehicle Test Center (EVTC) Opens In Kedah

Focus Applies Technologies opens region’s first dedicated Electric Vehicle Test Center (EVTC) in Kedah.

18-12-2025
EV

CBU EV Sales Surge Ahead of Dec 31 Tax Deadline

CBU EV sales jumped 33% in Nov as buyers moved quickly to secure tax-free pricing before incentives expire.

EV

Denza Malaysia Surpasses 1,000-unit Sales Milestone

Denza Malaysia reveal it has shifted 1,002 units of its D9 luxury EV MPV locally in less than a year.

16-12-2025
EV

smart #2 EV Begins Testing Ahead of 2026 Debut

The long-awaited smart ForTwo’s successor, the smart #2, begins testing ahead of its planned debut later in 2026.

16-12-2025
EV

EV Ambitions: Cheap Petrol, Costly Bottlenecks

With one charger for every 13.5 EVs, Malaysia’s EV ambitions face both a numerical and regulatory gap in its ecosystem.

EV

BYD Advances EV Efficiency with Variable-Flux Motor Patents

BYD reveal patents for variable-flux e-motors, aims to improve EV efficiency further through torque and driving range.

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.