ENZHMS
Link Copiedcheck_circle
EV

ChargeSini Inks MoU with KTC Arkz Group – 40 EVCB at Seri Iskandar Heights

Kumeran Sagathevan

Share via

ChargeSini-KTC-(12).jpg


ChargeSini has inked into a memorandum of understanding (MoU) with KTC Arkz Group Sdn Bhd (KTC) at Sungei Wang Plaza, KL recently for the rights to set up EV Charging stations at its forthcoming SOFO project, located at Seri Iskandar Heights about 40 km southwest of Ipoh, Perak.

Via this MoU, ChargeSini will be tasked to install 40 EV charging bays (EVCB) on the premises, comprising a mix of AC and DC chargers for the convenience of SOFO project residents and patrons. While the chargers will be operated and managed by ChargeSini, KTC would own and administer the whole parking system at the premise.


ChargeSini-KTC-(9).jpgChargeSini-KTC-(13).jpg


The two 20-storey high-rise buildings will be constructed on a 4.3-acre site which will cater for the needs of the growing township, which acts as Perak’s education hub with two university campuses – Universiti Teknologi PETRONAS and the branch campus of Universiti Teknologi MARA – and four other training institutes — Kolej Profesional MARA, Institut Kemahiran Belia Negara, Institut Latihan KEMAS and Kolej Vokasional MARA.

This project is only 17 KM from the nearest KTM station in Batu Gajah, 20 KM to entrance and exit of the West Coast Expressway, 38 KM from the PLUS Expressway, and 1 KM from the Ipoh-Lumut Highway.


ChargeSini-KTC-(6).jpgChargeSini-KTC-(7).jpg


The MoU was signed by ChargeSini CEO James Goh and KTC Group CEO Chong Khin Thin. During the MoU signing, it was also revealed that ChargeSini has already deployed 701 EVCBs across the country, with 24 of them now in the state of Perak.

Furthermore, under the terms of this MoU, ChargeSini would grant KTC access to its proprietary cloud-based control system, allowing KTC to access all aspects of the business from a CPO perspective, including the payment gateway, power distribution, management dashboard, and control centre.


ChargeSini-KTC-(11).jpg


The complete ecosystem described above would also be embedded in Seri Iskandar Heights' facilities management mobile application, allowing SOFO residents to easily access all of the building's features and services. 



Share This Article

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

JPJ Running Numbers

KUALA LUMPUR

VPR3804

SELANGOR

BSH5709

JOHOR

JYG3012

PULAU PINANG

PRT7643

PERAK

APA9434

PAHANG

CFD4020

KEDAH

KGC1643

NEGERI SEMBILAN

NEG9463

KOTA KINABALU

SJM4804

KUCHING

QAB1165M

Last updated 04 Sep, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.16

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.88

EURO 5 B7

RM 3.08

Last updated 04 Sep, 2025

Related News

EV

Meta Bright, ChargeSini JV to Fast-Track EV Charger Rollout

Meta Bright teams up with ChargeSini to scale EV charging infrastructure nationwide.

EV

Meta Bright Aligns with ChargeHere in Green Energy Push

Meta Bright and ChargeHere teams up, jointly seeking to accelerate EV charging infrastructure in Malaysia.

EV

PRO-NET Partners ChargeSini,Other CPOs, For EV Charging At Condos

PRO-NET partners ChargeSini and other leading CPOs to bring affordable, convenient EV charging to over 1,000 high-rises across Malaysia.

EV

Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC

Penang state government targets to establish 600 EV charging bays by this year, includes new ChargeSini DCFC too.

13-03-2025
EV

ChargeSini Partners UNITEN & Kevin Lab - Public EV Charger Usage Data Sharing

ChargeSini Inks MoU with UNITEN and Kevin Lab for joint data sharing and research to improve energy efficiency.

EV

ChargeSini To Set Up EV Chargers At KEB Properties New Developments

ChargeSini inks MOU with KEB Properties to develop new charging facilities in selected new developments.

EV

ChargeSini NU Empire Mall Subang DCFC Coming Soon - 2 x 60kW @ RM1.39/kWh

ChargeSini launches latest 60kW DCFC station at NU Empire Mall, Subang Jaya, offering a charging rate of RM1.39 per kWh.

EV

Refreshed ChargeSini MINI Malaysia EV Charging Station @ Four Seasons Place

ChargeSini MINI Malaysia EV charging station at The Shoppes, Four Seasons Place gets refreshed.

Latest News

EV

VW Polo Reborn as an EV Hatch with a Hotter GTI Version

Volkswagen has revived the Polo nameplate for its new subcompact EV hatch, which will include a hotter GTI version.

04-09-2025
EV

Chery QQ3 Reborn as an All-Electric City Hatch in China

The Chery QQ3 has been reborn as an all-electric city car, set to go against the popular Geely Geome Xingyuan.

03-09-2025
EV

Govt Revises Sept AFA Rebate, Now Lower at 1.10 sen/kWh

TNB’s latest adjustment offers bigger relief than expected, trimming tariffs beyond the earlier projection to 1.10 sen.

EV

You Don’t Need A Helmet To Ride This New BMW Concept EV Scooter

New BMW Motorrad Vision CE is a concept EV scooter that promises you don’t need a helmet to ride it…

02-09-2025
EV

New smart #2 Supermini Teased – Same Bones As Proton e.MAS 5?

Upcoming new smart #2 teased, will succeed signature Fortwo supermini, possibly using same bones as Proton e.MAS 5.

02-09-2025
EV

2026 MG4 EV Debuts in China With, Semi-Solid Battery Option

2026 MG4 EV launched in China offering five trims, fast charging and a semi-solid-state battery option.

EV

GWM Ora Good Cat GT Sighted In Merdeka Day Parade - Launch Soon?

GWM Ora Good Cat GT makes surprise appearance in Merdeka Day Parade, fuelling speculations of local launch soon.

EV

Camouflaged Proton e.MAS 5 Enters Merdeka Day Parade

Upcoming Proton e.MAS 5, enters 68th Merdeka Parade in Putrajaya ahead of planned launch.

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.