Selangor Govt, MBSA Launching Campaign To Prevent Forgotten Baby Syndrome
Following the tragic cases of "forgotten baby syndrome" (FBS) that have occurred recently, the state of Selangor and a city council are taking proactive measures to prevent parents from abandoning their children in a parked car by launching a campaign called “Children’s Safety in Car and Family Wellbeing”
A few of the preventive measures implemented include the distribution of vehicle stickers and the posting of announcements on digital billboards and over public square speakers.
In the initial stage, 10,000 stickers would be given out at government agency locations. A second phase entails the distribution of fifty thousand stickers to businesses. Additionally, flyers about avoiding FBS will be given out.
“Our hearts go out to these parents who have lost a child this way, especially since it is preventable,” said Selangor women and family empowerment, welfare and care economy committee chairman Anfaal Saari during the campaign launch in Hospital Selayang.
The state government is also considering launching initiatives to supplement current policies. One solution is to provide designated parking spaces for parents at hotspots such as hospitals and government buildings.
The campaign's third phase, which will begin in October, focuses on identifying long-term solutions and addressing the underlying causes of the issue. It's time for automakers to mandate that all newly built cars have sensor technology installed that will notify the driver.
Inspector Natalie Anak Allin, a Selangor police officer, suggested that parents check the back seat or use their smartphones to send a reminder to drop their child off at the daycare center to lessen the possibility of inadvertently leaving a child in the car after they park the vehicle.
Public service announcements (PSA) will be launched by the Shah Alam City Council (MBSA) to remind drivers to "look behind" and make sure no child is in the back seat before getting out of the car.
To stop FBS, Mayor Cheremi Tarman told StarMetro that the city council would shortly begin playing a public service announcement over 50 loudspeakers that are connected to MBSA's closed-circuit television (CCTV) cameras.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM5604
SELANGOR
BSG7745
JOHOR
JYE5042
PULAU PINANG
PRT1080
PERAK
ANY7246
PAHANG
CFD721
KEDAH
KGB6454
NEGERI SEMBILAN
NEG6404
KOTA KINABALU
SJL9999*
KUCHING
QAB8459L
Last updated 05 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Latest News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor
KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.
04-08-2025
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
Show More
trending_flat