ENZHMS
Link Copiedcheck_circle
Auto News

LPT3 Construction Cost Rises Three-Fold To RM9.8 Billion

Kumeran Sagathevan

Share via

LPT-3-(7).jpg



The estimated cost of constructing the East Coast Expressway 3 (LPT3), connecting Kampung Gemuroh in Kuala Terengganu to Kampung Tunjong in Kota Bharu, Kelantan, is now projected at RM9.8 billion. This is a significant increment from the RM2.867 billion initially estimated in 2009. 


According to Deputy Works Minister Datuk Seri Ahmad Maslan this three-fold increment is the reason for the shift in the financing model, which will now rely entirely on toll collection as opposed to LPT1 and LPT2. Both LPT1 and LPT2, were federally funded and charged tolls solely for maintenance whereas LPT3 will operate on a profit-return toll system. 



LPT-3-(2).jpg



Maslan further added, “The cost for LPT1, from Karak to Jabor, was RM1.477 billion, and toll charges were limited to maintenance. LPT2, opened in 2015, cost RM4.37 billion, running from Jabor to Kuala Telemong with tolls set at RM0.984/km, also for maintenance.” In contrast, LPT3 will be entirely toll-funded, with a projected toll rate of RM0.60/km and an end-to-end toll cost of RM70.


Ahmad further detailed that the construction proposal for LPT3 is now being reviewed by the Public-Private Partnership Unit (UKAS) under the PM’s Department. If approved, it will proceed to the Cabinet for final consideration. 



LPT-3-(8).jpg



The LPT3 project which will be modelled via a public-private partnership (PPP) model will undergo a transparent competitive request for proposal (RFP) process.


The Public Works Department (JKR), has been refining alignment and cost since 2020 due to the outdated nature of the original 2009 feasibility study. LPT3, if approved, would become a key infrastructure project to enhance connectivity and drive economic growth in the East Coast region.



Source: BERNAMA
Share This Article

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

JPJ Running Numbers

KUALA LUMPUR

VPY2637

SELANGOR

BSJ9437

JOHOR

JYK6402

PULAU PINANG

PRV4748

PERAK

APC3558

PAHANG

CFD9915

KEDAH

KGC8690

NEGERI SEMBILAN

NEH5392

KOTA KINABALU

SJN5584

KUCHING

QAB4799M

Last updated 05 Nov, 2025

Fuel Price

Petrol

RON 95

RM 2.60

RON 97

RM 3.20

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 3.02

+0.07

EURO 5 B7

RM 3.22

+0.07

Last updated 06 Nov, 2025

Related News

Auto News
KL-Karak Highway Road Widening Set to Begin in Jan 2025

KL-Karak Highway Road Widening Set to Begin in Jan 2025

KL-Karak Highway road widening exercise to begin in Jan 2025 at the cost of RM2.1 Billion.

Auto News
KKR Seeking RM20 Million To Build R&R Along LTU Highway

KKR Seeking RM20 Million To Build R&R Along LTU Highway

Works Ministry seeks RM20 million budget allocation to set-up R&R along LTU Highway.

Auto News
Use AI To Solve Highway Traffic Woes - Ahmad Maslan

Use AI To Solve Highway Traffic Woes - Ahmad Maslan

Ahmad Maslan says that instead of using the increase in vehicles or traffic as an excuse, efforts should be made to curb congestion problems using AI.

18-09-2024
Auto News
Additional RM100 Million Allocated To Maintain, Fix Federal Roads

Additional RM100 Million Allocated To Maintain, Fix Federal Roads

Govt. reportedly approves additional allocation of RM100 million to maintain and fix federal roads across Peninsular Malaysia.

02-09-2024
Auto News
Maslan: 15 KM Juru-Sungai Dua Elevated Highway To Cost RM1.8B

Maslan: 15 KM Juru-Sungai Dua Elevated Highway To Cost RM1.8B

The Juru-Sungai Dua Elevated Highway is set to cost RM1.8B, project will be undertaken by PLUS on a Public-Private Partnership basis.

Auto News
KKR Claims To Achieve 100% Pothole Patching Rate From MYJalan Reports

KKR Claims To Achieve 100% Pothole Patching Rate From MYJalan Reports

KKR has received 14,031 reports via the MYJalan App and has resolved 86% of it.

Auto News
Maslan : 100 EV Charging Points On Highways By 2025 & Christmas Toll Waiver!

Maslan : 100 EV Charging Points On Highways By 2025 & Christmas Toll Waiver!

Announcement on toll waiver for christmas expected on Friday (December 22), says Ahmad Maslan.

20-12-2023
Auto News
Maslan : Toll Exemption For Deepavali Holidays Still Being Discussed

Maslan : Toll Exemption For Deepavali Holidays Still Being Discussed

Proposal to grant toll exemption in conjunction with the upcoming Deepavali celebration this weekend is still in the process of being discussed

Latest News

Auto News
Updated Fuel Prices From 6 To 12 November

Updated Fuel Prices From 6 To 12 November

The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 6 to 12 November, 2025, the rates are as such.

05-11-2025
Auto News
UMWT Shifted 9,141 Units in Oct 2025, YTD Now at 79,559 Units

UMWT Shifted 9,141 Units in Oct 2025, YTD Now at 79,559 Units

UMW Toyota Motor closes October 2025 on a high note by shifting 9,141 units, bringing its YTD sales to 79,559 units.

05-11-2025
Auto News
Budi95: Govt Delays Subsidy Cut For T15 Until System Fully Ready

Budi95: Govt Delays Subsidy Cut For T15 Until System Fully Ready

Removal of RON95 subsidies for the T15 income group will wait until the BUDI95 system is stable.

05-11-2025
Auto News
ECRL Hits 88% Milestone As Key C1B Stretch Completed

ECRL Hits 88% Milestone As Key C1B Stretch Completed

The ECRL project has hit 88% completion with the C1B Segment now successfully completed.

05-11-2025
Auto News
Govt Mulls Expanding FLYSiswa Aid To Private University Students

Govt Mulls Expanding FLYSiswa Aid To Private University Students

MOT is studying ways to extend the RM400 flight subsidy to private university students.

05-11-2025
Auto News
Massive Sinkhole Opens In Bayan Lepas, Road Closed For Safety

Massive Sinkhole Opens In Bayan Lepas, Road Closed For Safety

A huge sinkhole measuring nearly two metres deep has opened near SMK Sungai Ara in Bayan Lepas.

05-11-2025
Auto News
Touch ‘n Go Announces Titan Flow Multi-Lane Fast Flow Platform

Touch ‘n Go Announces Titan Flow Multi-Lane Fast Flow Platform

In conjunction with MyARTTE 2025, Touch ‘n Go introduces its own multi-lane fast flow platform known as Titan Flow.

04-11-2025
Auto News
BUDI95: Fuel Quota For E-Hailing Drivers Raised To 800 Litres

BUDI95: Fuel Quota For E-Hailing Drivers Raised To 800 Litres

The govt has approved an 800-litre monthly RON95 quota for full-time e-hailing drivers under BUDI95.

04-11-2025

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.