Penang Increases Parking Rates By 50% To Combat Congestion

The Penang Island City Council (MBPP) recently declared that parking prices within its authority would be raised by 50% as part of a revision that would take effect this month. The parking cost increase, according to MBPP Mayor Datuk A Rajendran, is a component of the party's initiatives to enhance traffic flow and lessen island congestion.
Roadside parking fees on Penang Island have gone up from 40 sen to 60 sen per half hour and from 80 sen to RM1.20 per hour, according to the Penang State Government's monthly bulletin and website, Buletin Mutiara.
Furthermore, the daily parking charge has risen from RM6 to RM9. However, the monthly pass remains at the same price, RM150.

“Some motorists park their vehicles for 10 to 12 hours straight, making it difficult for others to find parking. This leads to drivers circling the area repeatedly, worsening congestion,” Rajendran says.
MBPP has taken stricter measures to curb traffic congestion at five locations on Penang Island: Jalan P. Ramlee, Jalan Dato' Keramat, Jalan Magazine, Jalan Burma, and Lebuhraya Tun Dr Lim Chong Eu. These measures include increased enforcement against illegal parking and a ban on roadside waiting.
In addition, the municipal council plans to enforce parking time limits at high-demand locations on Penang Island, such as areas within Little India and Lebuh Chulia in George Town.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQD7946
SELANGOR
BSK8796
JOHOR
JYM9079
PULAU PINANG
PRW6032
PERAK
APD4038
PAHANG
CFE4689
KEDAH
KGD4503
NEGERI SEMBILAN
NEH9170
KOTA KINABALU
SJP3046
KUCHING
QAB7484M
Last updated 17 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
MBPP Pioneers Strata Scheme For Abandoned Vehicles
Penang city council (MBPP) pioneer’s Strata Scheme for Abandoned Vehicles in housing areas using e-Dereg system.
22-09-2025
MOT, MBPP Setting Up Vehicle Disposal Facility In Penang
MOT and MBPP to set up an eco-friendly vehicle disposal hub in Penang to tackle the rising abandoned car problem.
28-07-2025
Penang Eyes 600 EVCBs This Year, Includes New ChargeSini DCFC
Penang state government targets to establish 600 EV charging bays by this year, includes new ChargeSini DCFC too.
13-03-2025
CNY 2025: 2.4 Million Vehicles Expected to Enter Penang
PDRM has estimated that over 2.4 million vehicles will enter Penang for this year’s Chinese New Year holidays.
27-01-2025
Old Tree Care In Dense Cities Crucial To Mitigate Risk
Both DBKL and MBPP have been called to improve old tree care procedures to mitigate risk of falling trees, which could result in fatalities.
14-05-2024
Two-Hour Parking Limit To Ease Traffic Congestion In Penang
Penang Island city council is considering a two-hour parking limit and smart traffic lights to ease traffic congestion.
19-03-2024
Latest News
Updated Fuel Prices From 18 To 24 December
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 18 to 24 December, 2025, the rates are as such.
17-12-2025
Perodua Traz Secures 5-Star ASEAN NCAP Crash Test Score
The newly-launched Perodua Traz has secured a full five-star rating for the ASEAN NCAP crash test.
17-12-2025
ECRL First EMU Trains, E-Locos Head To Malaysia For Testing
Malaysia’s East Coast Rail Link gears up as its first EMUs and electric locomotives arrive for testing and future service.
17-12-2025
Test Drive Any Chery PHEVs and Stand a Chance to Win Up to RM200K in Prizes
Test drive any of Chery’s new PHEVs from now until Jan 6 and stand a chance to win prizes worth up to RM200,000.
17-12-2025
Rapid KL Travel Pass Prices Increase from Jan 1, 2026
Rapid KL travel pass prices to rise in 2026; My50 and concession passes unchanged
17-12-2025
KTMB Expands ETS, East Coast Rail Services From Jan 1
KTMB expands train services nationwide with new ETS and East Coast routes starting Jan 1.
17-12-2025
KLIA Aerotrain Begins Trial Runs, Nightly Shutdown Remains
Malaysia Airports will start trial operations for the KLIA Aerotrain as part of a month-long plan to fix reliability issues.
17-12-2025
No More Heavy Vehicles On Kuala Terengganu Drawbridge From Jan 1
Heavy vehicles will no longer be allowed to use the Kuala Terengganu drawbridge from Jan 1.
16-12-2025
Show More
trending_flat