Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Drivers travelling along the North-South Expressway near Tangkak can expect traffic diversions starting August 5, as construction kicks off on a new bridge.
The affected stretch spans KM166.79 to KM168.26 between the Bukit Gambir and Tangkak Elevated Interchange, and the diversion will be activated in both directions.
The works are expected to continue until December 30.
PLUS Malaysia Berhad (PLUS) confirmed that the diversions will be introduced in stages to make way for bridge construction works carried out by contractors from the Public Works Department (JKR).
“Highway users are encouraged to plan their routes ahead and follow all traffic signs and directions from on-site personnel,” PLUS said in a statement on Sunday.
Real-time traffic updates will be available through the PLUS mobile app, the PUTRI Virtual Assistant, the @plustrafik account on X, and electronic message boards (VMS) along the highway.
For urgent help or emergencies, motorists can also call PLUSLine at 1800-88-0000.
PLUS is reminding drivers to stay alert in the area throughout the construction period and to be patient as the work progresses.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM5539
SELANGOR
BSG7726
JOHOR
JYE4987
PULAU PINANG
PRT1064
PERAK
ANY7209
PAHANG
CFD677
KEDAH
KGB6433
NEGERI SEMBILAN
NEG6396
KOTA KINABALU
SJL9999*
KUCHING
QAB8457L
Last updated 04 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Maintenance on NKVE & ELITE – KM 19.3 – KM 20.0, July 19 to Oct 14
PLUS has issued a statement regarding the maintenance works and contraflow activations on both the NKVE & ELITE.
21-07-2025
PLUS: Lane Closure & Contraflow on Penang’s Tun Dr Lim Chong Eu Expressway
Full lane closure plus contraflow in effect on stretch of Tun Dr Lim Chong Eu expressway from Penang Bridge towards Georgetown until June 20.
19-06-2025
Yinson GreenTech, PLUS Ink JV for Integrated EV Charging Hubs
Yinson GreenTech and PLUS join forces to develop full-service EV charging hubs along North-South Expressway.
12-06-2025
PLUS, LPT2 Remind Travellers to Brace for High Aidiladha Traffic
PLUS and LPT 2 expect high Aidiladha traffic, exceeding two million and 60,000 vehicles daily, respectively.
03-06-2025
PLUS Announces Several Road Closures For ASEAN Summit
PLUS announces several road closures on May 23-26 and May 28 for the ASEAN Summit 2025.
22-05-2025
PLUS Will Begin Trial Runs On MLFF In April
PLUS aims to commence testing a prototype of its MLFF system by April of this year.
12-02-2025
Ministry Seeks Inclusion Of 3rd Phase Of PLUS Widening Project In Budget 2025
Ahmad Maslan is hopeful that Budget 2025 would include the proposed third phase of the PLUS widening project.
18-09-2024
PLUS & Petronas Inks MoU To Roll-Out Hybrid Super Stations
PLUS partners Petronas to start rolling out 30,000 sq ft Hybrid Super Stations which will cater to ICE and EV users.
03-07-2024
Latest News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor
KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.
04-08-2025
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
Show More
trending_flat