Parking Solutions Being Studied For Future Seri Kembangan Market
Plans are underway to tackle the parking crunch near the upcoming Seri Kembangan market, with a consultant appointed to study options for additional parking around Jalan Pasar, Kampung Baru Seri Kembangan, The Star has reported.
Puchong DAP Youth deputy chief and MBSJ Zone 22 councillor Tey Boon Kiat said the study was aimed at ensuring enough parking is available once the new market building opens.
“The current design has roughly 80 bays, but we know that won’t be enough, especially on market days,” he said.
Tey explained that part of the study includes looking at Dewan Serbaguna Seri Kembangan, a multipurpose hall about 230m from the old market site, to see if its grounds could be upgraded to support more parking.

“We are working with the consultant to survey available land and assess if the hall space can be modified to create more parking. If it’s feasible, we will propose it as a separate infrastructure project with its own funding and timeline,” he added.
Parking woes have worsened since April 2023 when traders were relocated to a temporary site along Jalan SK6/1. The old 0.28ha car park on Jalan SK10/3 remains fenced up for a planned three-storey commercial development.
Seri Kembangan assemblyman Wong Siew Ki previously said that design and technical approvals for the new market are complete, with construction targeted to begin by late 2025.
“The market rebuild will take two years, and we aim to have it ready by the end of 2027,” she said, adding that all 196 licensed traders currently operating at the temporary site will be accommodated at the new market.
Wong also noted that future stall allocations will follow MBSJ licensing rules and that the council is reviewing licences that are either inactive or sublet.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQA1749
SELANGOR
BSK1860
JOHOR
JYL1422
PULAU PINANG
PRV6805
PERAK
APC5142
PAHANG
CFE1594
KEDAH
KGC9865
NEGERI SEMBILAN
NEH6011
KOTA KINABALU
SJN6648
KUCHING
QAB5170M
Last updated 15 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.65
+0.05
RON 97
RM 3.25
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.07
+0.05
EURO 5 B7
RM 3.27
+0.05
Last updated 13 Nov, 2025
Related News
New Concessionaire Set to Manage Parking Collection in Selangor from Aug 1
From Aug 1 onwards, a new concessionaire will manage the parking fee collection for MBPJ, MBSJ, MBSA, and MPS.
10-07-2025
Litrak Should Reconsider Puchong Selatan U-Turn Closure
Subang Jaya Mayor opposes U-Turn closure at Puchong Selatan toll.
27-03-2025
MBSJ RM10 Fine Promotion, 1st Oct To 31 Dec - Don't Pay Your Parking Fines Till Then
The Subang Jaya City Council (MBSJ) has announced a special RM10 flat rate promotion for selected parking and traffic fines that will run for a three-month period starting from October 1st to December 31st
24-08-2023
Latest News
BYD Sees 2025 YTD Sales Total Reach 11,097 Units – 70% YoY Up From 2024
BYD Cars Malaysia discloses its 2025 YTD toral sales have reached 11,097 units, marking a 70% YoY increase from 2024.
14-11-2025
KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades
KLIA’s Aerotrain will be suspended nightly from 9PM to 7AM starting Nov 15 for reliability upgrades.
14-11-2025
Kelana Jaya LRT Weekend Disruptions For Upgrades
Rapid KL will upgrade the Kelana Jaya Line signalling system on Nov 15–16 and 29–30.
14-11-2025
GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain
GWM Malaysia strengthens local partnerships and production to support the nation’s new-energy mobility ambitions.
14-11-2025
Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka
Mitsubishi Motors Malaysia, together with Eon Auto Mart, announces the relocation and upgrade of its outlet in Melaka.
14-11-2025
PLUS Implements Night Contra-Flow On Elite Highway For Pipe Work
Motorists on the Elite Highway should expect a contra-flow from Nov 17–20 for pipe work.
14-11-2025
Flat Rate, Rule of 78, Reducing Balance: How Hire-Purchase Loans Really Work
We break down a RM100,000 loan over seven years to show how reducing balance interest saves you money.
14-11-2025
Genting Highlands Set To Introduce Vehicle Fee to Boost Safety
Motorists heading to Genting Highlands will soon pay a fee to fund maintenance and safety on the 24 km private road.
13-11-2025
Show More
trending_flat

