Cable Theft Paralyzes Rail Services, Prasarana Urges Action From Govt
Cable theft along rail lines has become a growing headache for Prasarana Malaysia Berhad, with the company warning that the problem can no longer be tackled by operators alone.
Over the past three years, cable theft has cost Prasarana an estimated RM20.6 million, while incidents have surged sharply this year, directly affecting train services used by millions in the Klang Valley.
According to the rail operator, 69 cable theft cases have already been recorded so far this year, up from 41 cases in 2024, marking a 68% increase. The rise is largely driven by organised syndicates taking advantage of high copper prices, making stolen cables highly profitable on the scrap market.
-full_normal.jpg)
While the financial losses are significant, Prasarana stressed that passengers bear the biggest impact. Each theft damages critical signalling systems, forcing immediate repairs and often resulting in train delays, service disruptions and safety concerns.
“Every theft incident disrupts operations, and passengers are the ones who suffer,” said Prasarana group chief for health, safety, security, environment and sustainability, Idzqandar Abu Bakar.
To curb the problem, Prasarana has stepped up security across its 200km-plus rail network, deploying security personnel, conducting joint patrols with the police, installing high-tech CCTV systems and even testing the use of sniffer dogs on certain lines.

It is also working with MRT Corp to strengthen physical security at vulnerable locations.
"However, these measures are still not enough given the scale of the network and the organised nature of the crime," he stated, calling for a coordinated national approach, including stricter regulation of the scrap metal industry and heavier penalties for offenders.
Prasarana also warned that cable theft does not only affect its rail operations, but poses risks to other rail operators and telecommunications infrastructure, making it a broader threat to the country’s critical systems.
-full_normal.jpg)
“This is not something Prasarana can solve alone. The cooperation from enforcement agencies, lawmakers, industry players and the public is crucial to stop the problem from worsening," Izqandar concluded.
Source: Bernama.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQR2265
SELANGOR
BSN4792
JOHOR
JYT4741
PULAU PINANG
PSA6781
PERAK
APG1484
PAHANG
CFF8543
KEDAH
KGE8425
NEGERI SEMBILAN
NEJ8190
KOTA KINABALU
SJQ8840
KUCHING
QAB4319N
Last updated 25 Mar, 2026
Fuel Price
Petrol
RON 95
RM 2.59
+0.05
RON 97
RM 3.15
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.04
+0.05
EURO 5 B7
RM 3.24
+0.05
Last updated 26 Feb, 2026
Related News
Rapid Bus to Roll Out 1,600 Electric Buses from 2026
Rapid Bus will deploy up to 1,600 electric buses nationwide from 2026 as part of a major fleet modernisation drive.
13-01-2026
Public Transport Ridership Surges, Safety Delays Remain A Challenge
Prasarana’s record-breaking passenger numbers in 2025 show that public confidence in public transport is back on track.
08-01-2026
Prasarana Ridership Jumps 11% in 2025
Prasarana ridership jumps 11% in 2025 hitting 1.31 million users.
07-01-2026
Rapid KL Travel Pass Prices Increase from Jan 1, 2026
Rapid KL travel pass prices to rise in 2026; My50 and concession passes unchanged
17-12-2025
Prasarana Set To Roll Out 1,045 Electric Buses By 2030
Prasarana is set to roll out more than 1,045 electric buses across Kuala Lumpur and Penang by 2030.
08-12-2025
Klang Valley Trains Improving, Prasarana to Report Performance - Loke
Despite commuter complaints, rail services are running smoother than a few years ago, with fewer disruptions and new trains on the way.
08-12-2025
MRT Putrajaya Line Repairs Ongoing After Cable Theft Disruption
Cable theft near Taman Desa cripples MRT Putrajaya Line operations, forcing manual train runs.
26-10-2025
Budget 2026: Prasarana Seeks Continued Support for Travel Passes and LRT3
Prasarana moots continued support for travel passes, LRT 3 line completion, cites them as key to easing living costs and improving urban mobility.
09-10-2025
Latest News
Strait of Hormuz to Malaysia: Why We’re Paying for a War 6,000km Away
Why is RON97 at RM4.55/L? We decode the Strait of Hormuz conflict, the May 2026 subsidy deadline, and why Malaysia imports oil despite being a producer.
19-03-2026
From 82 Minutes to 8: How the Mutiara Line is Giving Penangites Their Time Back
Is the 80-minute Penang Bridge crawl finally ending? The Mutiara Line LRT links Butterworth to Komtar in just 8 minutes. Get the latest 2026 project updates, station lists, and more.
17-03-2026
The 2026 Proton X90 Buyer’s Warning: 5 Critical Safety Features You Are No Longer Getting
ASEAN NCAP revokes Proton X90’s 5-star rating. The 2026 facelift is downgraded to 1-star after stripping critical ADAS features. Is your family safe? Get the full safety specs here.
16-03-2026
9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works
Toyota Malaysia hits 9,556 sales in early 2026, proving the "Multi-Pathway" strategy works. From Vios Hybrid to Vellfire HEV, see why hybrids are winning the sales war.
12-03-2026
Chery Tiggo 7 is Now the Safest Chinese SUV on the Planet, This Is Why
The Chery Tiggo 7 makes history as the only Chinese SUV to sweep 5-star ratings from Euro NCAP, ANCAP, and ASEAN NCAP. With a record 94.68 points, see why this is 2026’s safest family SUV.
11-03-2026
Sepang Dates Confirmed: Catch Team Porsche Malaysia in Action on 21–23 August
While the 2026 Porsche Carrera Cup Asia (PCCA) season kicks off in Shanghai this weekend, Malaysian fans are already looking ahead to the highlight of the year: the homecoming.
10-03-2026
Iran-US War Day 10: It’s Not Just Fuel — Malaysia’s Automotive Industry Faces New Risks
While the BUDI95 subsidy program is already feeling the heat of oil prices flirting with US$120 a barrel, the true threat to our automotive sector lies beneath the surface.
09-03-2026
Prasarana to Reveal LRT3 Launch Date This April—Here’s Everything We Know So Far
The wait for the LRT3 Shah Alam Line is entering its final stretch. After months of "will they, won't they" speculation, Prasarana has officially pointed to April 2026 as the month of truth.
05-03-2026
Show More
trending_flat
