Link Copiedcheck_circle
Auto News

MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL

Anis

Share via


The Mass Rapid Transit (MRT) Putrajaya Line Phase Two, which will open on March 16, is expected to reduce traffic congestion, particularly on roads and highways leading to the city centre of Kuala Lumpur. The Phase Two line, which stretches 40.2 kilometres (km) from Kampung Batu to Putrajaya Sentral, includes a number of hot spot locations or stations, including Sungai Besi, Chan Sow Lin, and Ampang Park, which are the focus of the working population. The MRT Putrajaya Line will also have interchange station services with the Kelana Jaya LRT, Kajang MRT, and KL monorail.


The MRT Putrajaya Line spans 57.7 kilometres from Kwasa Damansara to Putrajaya Sentral, with 36 stations including nine underground stations and 49 train sets. During the operational review of the Putrajaya line today, MRT Corp chief executive officer Datuk Mohd Zarif Hashim stated that the grade of automation of all trains on the Putrajaya MRT line was at level four (GoA4), which means that the trains are controlled automatically without human intervention. He stated that the automation system is outfitted with cutting-edge technology and is fully controlled from the operations centre in Sungai Buloh.


"It is similar to using robotics with the sophisticated automated system. We must ensure that the individual operating the system has the necessary skills "He added.




Previously, media professionals were given the opportunity to ride the MRT from Putrajaya Sentral to Hospital Kuala Lumpur (HKL) station, which took about one hour and 15 minutes back and forth with no stops. Bernama discovered that the HKL station near the hospital's Institute of Urology and Nephrology is exceptionally user-friendly, with escalators and stairs that are not too high, as well as a travelator similar to those found in airport terminals. According to Mohd Zarif, such user-friendly initiatives were implemented with the welfare and condition of patients travelling to HKL in mind. Furthermore, he said that the current cashless payment method, which uses the Touch 'n Go card, may be expanded to include credit and debit cards, but this has yet to be implemented.


"However, the payment machines at MRT stations have been equipped with payment transaction systems in the future to cater to those using ATM cards or smart watches," he said, adding that Prasarana Malaysia Berhad would make an announcement on the subject. Meanwhile, he encouraged passengers to use the unlimited travel pass, My50, which costs RM50 per month. The MRT Putrajaya Line Phase Two will be open to the public on March 16 at 3 p.m., following the official launch by Prime Minister Datuk Seri Anwar Ibrahim. Previously, the MRT Putrajaya Line Phase One from Kwasa Damansara to Kampung Batu began service on June 16 of last year. The Putrajaya MRT line, worth RM30.53 billion, is expected to transport 104 000 passengers per day. Source: Bernama


Gallery

Tagged:

MRT Putrajaya
#MRT
MRT Putrajaya Line Phase 2
MRT Putrajaya Line
MRT corp
Mass Rapid Transit Corporation Sdn Bhd (MRT Corp)
MRT2
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

MRT Putrajaya Line Get 300 Pax Capacity Women’s Coach

MRT Putrajaya Line gets women coach service capable of ferrying up to 400 pax each trip.

Auto News

Major Delays On MRT Putrajaya Line Caused By Trespassers - Rapidrail

The MRT Putrajaya Line experienced a service disruption this morning due to a trespassing incident.

14-02-2024
Auto News

New MRT Feeder Bus From North Sungai Buloh To MRT Putrajaya

Rapid KL announced the new MRT feeder bus connecting areas north of Sg Buloh to the MRT Putrajaya Line station.

06-12-2023
Auto News

Tun Mahathir Praises MRT Service

Tun M praises infrastructure and facilities in the Mass Rapid Transit (MRT) service.

26-04-2023
Auto News

"Too early to assess Putrajaya MRT route on peak-hour congestion" - Loke

It is still too early to assess the effectiveness of Putrajaya's MRT service in reducing traffic congestion, says Loke.

07-04-2023
Auto News

Rapid Rail Suspends LRT Operations At Six Stations, Starting April 2

Rapid KL has announced six stations on the Ampang – Sri Petaling LRT line will be suspended starting April 2.

31-03-2023
Auto News

MRT Putrajaya Line Free Ride Ends Tomorrow March 31

MRT Putrajaya Line free ride ends tomorrow on March 31.

30-03-2023
Auto News

KTMB Agrees To Provide CVSKL Patients Free ETS Rides

KTMB collaborates with CVSKL to offer free rides for its patients.

17-03-2023

Latest News

Auto News

MBPP Pioneers Strata Scheme For Abandoned Vehicles

Penang city council (MBPP) pioneer’s Strata Scheme for Abandoned Vehicles in housing areas using e-Dereg system.

22-09-2025
Auto News

KLIA Tout Arrested After RM800 Tourist Scam

JPJ detains tout and seizes car after viral case of two Chinese tourists being overcharged and trapped in KLIA ride.

22-09-2025
Auto News

MyKad is the Best Option for RON95 Subsidy, No New Card Required – MoF

Using MyKad to get the RON95 subsidy is the best option, with no new cards required, says the Second Finance Minister.

22-09-2025
Auto News

Malaysians Will Enjoy 300L of Petrol at RM1.99 Per Litre A Month - PMX

BUDI95 programme gives every eligible Malaysian 300 litres of subsidised RON95 monthly.

22-09-2025
Auto News

RM3.5m From Plate Sales To Protect 50,000 Drivers

MOT is using RM3.5m from special number plate sales to fund social security coverage for taxi, rental car, and school bus drivers nationwide.

22-09-2025
Auto News

Low SKPS Registrations As Drivers Struggle With Digital Process

Low awareness and digital hurdles are keeping many taxi and bus operators from signing up for the RON95 subsidy scheme.

22-09-2025
Auto News

ECRL Work Halted - Petronas Gas Pipeline Leak, Safety Zone Declared

Petronas Gas pipeline leak at the ECRL project has halted works, emergency crews racing to purge butane gas.

Auto News

RON95 Subsidy: App, Counters and Terminals Payment Options; SKPS Up Take Low

RON95 subsidy eligibility status, access and verification done via apps, counters and terminals; SKPS registrations remain low.