Link Copiedcheck_circle
Auto News

West Coast Expressway To Play A Key Role During Visit Perak Year 2024!

KS

Share via

WCE-Perak-(3).jpg

The CEO of West Coast Expressway (WCE), Lyndon Alfred Felix, stated that the completion of the WCE project would change Perak's tourism scene especially at Section 11 from Beruas to South Taiping and the Selangor end barrier sections. Furthermore, this developments coincide with Visit Perak Year 2024 where WCE will eventually provide visitors with a seamless travel experience exploring Perak's magnificent sites and distinctive attractions.

He further added that the Selangor end barrier, which includes Sections 1 (Banting-South Klang Valley Motorway) and Section 2 (South Klang Valley Expressway-Shah Alam Motorway), as well as Section 6 (Kapar-Assam Jawa), would be complete later this year, making it easier for tourists to traverse.

WCE-Perak-(2).png

Felix stressed that the WCE will play a critical role in driving the state's economic growth and create new possibilities for local residents. The WCE will offer a magnificent coastal drive, connecting important tourist attractions along the Perak alignment, from Hutan Melintang to Teluk Intan, Sitiawan to Beruas, Trong, and finishing at South Taiping. It is expected that 8 million local tourists and 350,000 international visitors will benefit from WCE.

During the pre-launch of Visit Perak Year 2024, Menteri Besar Datuk Seri Saarani Mohamad expressed excitement about the WCE project, stating it will open up new opportunities for promoting the tourism sector in Perak. The highway will act as a key entrance for tourists, taking them through different exits in Perak, including Teluk Intan, Lekir, Sitiawan, North Sitiawan, and the gateway to Pulau Pangkor.

Furthermore, the Changkat Chermin and Beruas exits will take tourists to the Central Perak district's distinctiveness and the historical value of the old kingdom of Gangga Negara plus improve access to Taiping Heritage Town via the Trong and South Taiping interchanges.


Source: BERNAMA

Gallery

Tagged:

West Coast Expressway (WCE)
Lebuhraya Pesisiran Pantai Barat (WCE)
Visit Perak 2024
Share This Article

Written By

KS

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well! https://www.linkedin.com/in/kumeran-sagathevan/

Share via

Related News

Auto News
WCE Sec 2 Toll Enabled; Responds to Klang Eviction Claims

WCE Sec 2 Toll Enabled; Responds to Klang Eviction Claims

WCE starts toll operations in Seksyen 2 and clarifies illegal evictions claims.

13-06-2025
Auto News
Hari Raya 2025: Over 140K Vehicles Expected Daily on WCE

Hari Raya 2025: Over 140K Vehicles Expected Daily on WCE

Over 140,000 vehicles are expected to use the WCE daily during this upcoming Hari Raya Aidilfitri festive season.

24-03-2025
EV
WCE Section 2 Opens with 240 kW DC Handal Charging Station

WCE Section 2 Opens with 240 kW DC Handal Charging Station

WCE Section 2 opens today toll free till 22 Feb, features 240 kW DCFC station by DC Handal.

22-01-2025
Auto News
ECRL Kelantan LIne 87.8% Complete, On Track for 2026 Completion

ECRL Kelantan LIne 87.8% Complete, On Track for 2026 Completion

ECRL project makes swift progress to reach 87.8% completion, and it appears on track for planned 2027 launch.

16-01-2025
Auto News
WCE Sees 83% Increment In Traffic & 128% Increment In Toll Collection

WCE Sees 83% Increment In Traffic & 128% Increment In Toll Collection

WCE sees increased average daily traffic volume by 83% supported by a boost in toll income by 128%.

29-11-2024
Auto News
WCE Extension Banting-Gelang Patah Set To Provide NSE Alternative

WCE Extension Banting-Gelang Patah Set To Provide NSE Alternative

WCE, which will connect Banting to Gelang Patah, is set to reduce the traffic congestion on the NSE.

04-11-2024
Auto News
Selangor MB Proposes Extension Of WCE To KLIA

Selangor MB Proposes Extension Of WCE To KLIA

Selangor MB proposed that WCE be extended to Kuala Lumpur International Airport.

28-10-2024
Auto News
Toll Collection On Section 1 Of WCE To Commence On Monday

Toll Collection On Section 1 Of WCE To Commence On Monday

Toll collection will begin on the WCE (Section 1) from 12.01am on Monday (Sept 30).

28-09-2024

Latest News

Auto News
P-Hailing Group Questions APAD’s Leeway For InDrive, Maxim

P-Hailing Group Questions APAD’s Leeway For InDrive, Maxim

Penghantar Malaysia is questioning why APAD is allowing InDrive and Maxim to keep operating despite past violations.

25-07-2025
Auto News
PM: M40 to Will Benefit From Cheaper Fuel, Frozen Toll Rates

PM: M40 to Will Benefit From Cheaper Fuel, Frozen Toll Rates

PM Datuk lo Seri Anwar Ibrahim reassured that fuel and toll savings are now reaching the M40 group.

25-07-2025
Auto News
Chemical-Laden Trailer Falls Into Sea Near Second Link A Day After Spill Drill

Chemical-Laden Trailer Falls Into Sea Near Second Link A Day After Spill Drill

A trailer carrying chemicals reportedly crashed into the sea near the Second Link just a day after a Malaysia-Singapore chemical spill drill.

25-07-2025
Auto News
KL Sees Over 1,000 Abandoned Cars In Just Five Months

KL Sees Over 1,000 Abandoned Cars In Just Five Months

KL is facing a growing abandoned vehicle problem, with over 1,000 complaints recorded between Jan and May this year.

24-07-2025
Auto News
Three Dead, 12 Injured in Motorcycle Convoy Crash on NSE

Three Dead, 12 Injured in Motorcycle Convoy Crash on NSE

Three motorcyclists were killed and 12 injured in a crash involving a convoy on the NSE early this morning.

24-07-2025
Auto News
Johor Steps Up Transport Upgrades Ahead Of Visit Johor 2026

Johor Steps Up Transport Upgrades Ahead Of Visit Johor 2026

Johor is stepping up cross-border transport upgrades at BSI, KSAB, and Larkin ahead of Visit Johor 2026 to ease congestion.

24-07-2025
Auto News
Maxim, inDrive Given 3-Month Probation

Maxim, inDrive Given 3-Month Probation

Maxim, inDrive are back in service under a three-month APAD watch after fixing permit issues that previously led to their suspension.

24-07-2025
Auto News
JPJ: IWS(e) Certification Now Required for Vehicles With Extra Wiring

JPJ: IWS(e) Certification Now Required for Vehicles With Extra Wiring

All vehicles with added electrical systems must present certified IWS(e) documents starting Jan 2026.

24-07-2025